• Title/Summary/Keyword: Performance measurement index

Search Result 328, Processing Time 0.027 seconds

Development of Balanced Performance Measurement Index for B2B e-Marketplace (B2B e-Marketplace의 성과측정지표 개발에 관한 연구 -재무적 성과 및 지식자산 성과관점에서-)

  • Kim, Hyo-gun;Lee, Jaeyeon;Kang, Sora
    • Knowledge Management Research
    • /
    • v.3 no.1
    • /
    • pp.41-60
    • /
    • 2002
  • This paper defines measurement index items and weight of the index for the purpose of developing a performance measurement index that balancedly measures performance of B2B electronic commerce. The deductive research is used for the development of measurement index items and Analytic Hierarchy Process(AHP) method for the development of weight of the index. This paper has four performance measurement perspectives-finance, partners, business process and human resources, which based the existing researches of balanced performance measurement. This researchers developed eleven second level criteria and twenty-six indexes under four perspectives through the deductive method and expert interviews, weighted on the perspectives, criteria and indexes in accordance with the forms of e-marketplace-vertical and horizontal. As a result, the most important indexes are the maintenance of partners and the efficiency of operation process in the vertical e-marketplace. In the horizontal e-marketplace, the collection of partners, development and prediction processes are more important than other indexes.

  • PDF

A Risk Performance Measurement System for the Mega-Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • v.12 no.1
    • /
    • pp.57-64
    • /
    • 2010
  • In recent years, interests and studies on the urban regeneration projects have been increased and largely conducted. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF

A Development of the Performance Measurement System for Safely Management (안전관리 성과측정 시스템 개발)

  • 이영순;김용수;박교식;김형석
    • Journal of the Korean Society of Safety
    • /
    • v.15 no.4
    • /
    • pp.157-162
    • /
    • 2000
  • A performance measurement system for safety management was suggested with which performance of a company's safety activities can be expressed rationally, and analysis of impact with performance improvement. A key of the measurement system is performance index of the safety management activities, which consists of 3 perspectives; an external perspective, an internal perspective, and a innovation & learning perspective. Every perspective consists of 18 performance indices and each indices consist of activity unit a such planning, support, implementation, evaluation and review.

  • PDF

A Development of Risk Performance Index for Mega-project Performance Measurement in view of the integrated Cost/Schedule/Risk (비용/공정/위험 통합 관점에서 메가 프로젝트 성과측정을 위한 위험성과지수 개발)

  • Kim, Seon-Gyoo;Park, Kyoo-Young;Yu, Young-Jeong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.69-77
    • /
    • 2009
  • Recently, a research of the urban regeneration has been performed very actively. This is one of the efforts to resolve various social and economic problems coming from the existing deteriorated building and facilities by new urban development or redevelopment. However, an urban regeneration has a characteristic to be unable to ensure the project performance due to the exposed numerous risks coming from the various and complex stake-holders, and its mega sizes. This paper proposes the method of risk performance index in order to improve an efficiency of performance measurement expanding to the risk view point from the existing integrated cost/schedule performance measurement. A risk performance index is compatible with the existing EVMS, and can make the performance measurement in 3 dimensions of the integrated cost/schedule/risk with 18 sub-indexes and variables.

A Study on the Laser Measurement Experiment for Performance Advancement of Tilting Index Table (틸팅 인덱스 테이블의 성능 향상을 위한 레이저 측정 실험에 관한 연구)

  • Kim, Kwang-Sun;Lee, Tae-Ho;Lee, Choon-Man
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.10 no.5
    • /
    • pp.26-30
    • /
    • 2011
  • Currently, many researches are carried out about tilting index table, which is one of the main component of 5-axis machine tool. The performance of the tilting index table is associated the rotational accuracy which is very important factor for high precision machining because it have an effect on machining error. In this paper, a tilting index table is developed, and the rotational accuracy of the tilting index table using a laser measurement equipment is measured. In addition, a correction value is obtained from the measured value through compensation, and the correction value is used to improve the accuracy of the table. Comparative analysis is carried out for the accuracy of the table before and after compensation. This paper can be used by a reference for performance and reliability advancement of tilting index table.

Evaluation Method for Measurement System and Process Capability Using Gage R&R and Performance Indices (게이지 R&R과 성능지수를 이용한 측정시스템과 공정능력 평가 방법)

  • Ju, Youngdon;Lee, Dongju
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.2
    • /
    • pp.78-85
    • /
    • 2019
  • High variance observed in the measurement system can cause high process variation that can affect process capability badly. Therefore, measurement system analysis is closely related to process capability analysis. Generally, the evaluation for measurement system and process variance is performed separately in the industry. That is, the measurement system analysis is implemented before process monitoring, process capability and process performance analysis even though these analyses are closely related. This paper presents the effective concurrent evaluation procedure for measurement system analysis and process capability analysis using the table that contains Process Performance (Pp), Gage Repeatability & Reproducibility (%R&R) and Number of Distinct Categories (NDC). Furthermore, the long-term process capability index (Pp), which takes into account both gage variance and process variance, is used instead of the short-term process capability (Cp) considering only process variance. The long-term capability index can reflect well the relationship between the measurement system and process capability. The quality measurement and improvement guidelines by region scale are also described in detail. In conclusion, this research proposes the procedure that can execute the measurement system analysis and process capability analysis at the same time. The proposed procedure can contribute to reduction of the measurement staff's effort and to improvement of accurate evaluation.

Optimal Measurement System Design by Using Band Matrix (밴드행열을 이용한 최적측정점선정에 관한 연구)

  • Song, Kyung-Bin;Choi, Sang-Bong;Moon, Toung-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 1987.11a
    • /
    • pp.133-136
    • /
    • 1987
  • This paper presents a new algorithm of optimal measurement system by using band matrix characteristic respectively for state estimation. A performance index of measurement system is established to reflect relation among measurement sets, probability of measurement failure and cost of individual meter installation. Selection ranking in the candidates of measurement sets is composed to guarantee the observability for any any single meter outage. Performance index sensitivity is introduced and recursive formula which based on the matrix inversion lemma used for selection. The proposed algorithm is composed of successive addition algorithm, successive elimination algorithm and combinatorial algorithm. The band matrix characteristic could save in memory requirements and calculate the performance index faster than earlier.

  • PDF

A Study on the Use of Results and Measurement Case of Productivity of the Public Organization (공공조직 생산성 측정사례 및 결과 활용에 관한 연구 : 지방자치단체 생산성지수 중심)

  • Kim, Wan Pyong
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.10 no.4
    • /
    • pp.225-236
    • /
    • 2014
  • Productivity of public organizations was far older due to issue more difficult to measure than private organizations. Unlike the private sector, the public sector is a diverse and sometimes conflicting objectives (efficiency, effectiveness, equity, democracy, etc.) exist, it is difficult to measure productivity in a single index. Many departments of government is intricately interrelated and sometimes produced by the joint efforts, it is difficult to allocate performance, incentives and accountability to among departments. And there is the difficulty of collecting data on the productivity indicators of public organizations. Despite these difficulties, we developed a productivity index system and measuring method to systematically introduce the concept of productivity in the local administration. In this paper, the productivity and the productivity index measurement practices of local governments conducted annually from 2011 on was deep into research. First, the report found examples of the governments of the developed countries, productivity measurement, then the way MOPAS(Ministry of Public Administration and Security) measure productivity index of local governments, success factors, the implications were in-depth analysis. Finally, in order to enhance productivity and competitiveness municipalities studied ways to take advantage of the productivity index.

Expected RGDOP Based Satellite Selection Scheme for Performance Improvement of Precise Float Solution

  • Lee, Sunyong;Lim, Deok Won;Noh, Jae Hee;Lee, Jin Hyuk;Lee, Sang Jeong
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.7 no.4
    • /
    • pp.255-265
    • /
    • 2018
  • In this paper, the positioning performance index is proposed. The proposed index is used to find satellites that degrade positioning performance to improve the positioning performance. To do this, the proposed index is calculated using the code measurement quality and the DOP. And, through the experiment, the effectiveness of the proposed index is confirmed. In the experiment, the quality of the code measurements is analyzed, and the effectiveness of the proposed index is confirmed by comparing with the result of the precise float solution. Finally, it is shown that the precise float solution performance is improved by using the proposed index.