• 제목/요약/키워드: Performance Evaluation of Facility

검색결과 329건 처리시간 0.033초

Performance Analysis of Upgrading Process with Amine-Based CO2 Capture Pilot Plant

  • Kwak, No-Sang;Lee, Junghyun;Lee, Dong Woog;Lee, Ji Hyun;Shim, Jae-Goo
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제4권1호
    • /
    • pp.33-38
    • /
    • 2018
  • This study applied upgrades to the processes of a 10 MW wet amine $CO_2$ capture pilot plant and conducted performance evaluation. The 10 MW $CO_2$ Capture Pilot Plant is a facility that applies 1/50 of the combustion flue gas produced from a 500 MW coal-fired power plant, and is capable of capturing up to 200 tons of $CO_2$. This study aimed to quantitatively measure efficiency improvements of post-combustion $CO_2$ capture facilities resulting from process upgrades to propose reliable data for the first time in Korea. The key components of the process upgrades involve absorber intercooling, lean/rich amine exchanger efficiency improvements, reboiler steam TVR (Thermal Vapor Recompression), and lean amine MVR (Mechanical Vapor Recompression). The components were sequentially applied to test the energy reduction effect of each component. In addition, the performance evaluation was conducted with the absorber $CO_2$ removal efficiency maintained at the performance evaluation standard value proposed by the IEA-GHG ($CO_2$ removal rate: 90%). The absorbent used in the study was the highly efficient KoSol-5 that was developed by KEPCO (Korea Electric Power Corporation). From the performance evaluation results, it was found that the steam consumption (regeneration energy) for the regeneration of the absorbent decreased by $0.38GJ/tonCO_2$ after applying the process upgrades: from $2.93GJ/ton\;CO_2$ to $2.55GJ/tonCO_2$. This study confirmed the excellent performance of the post-combustion wet $CO_2$ capture process developed by KEPCO Research Institute (KEPRI) within KEPCO, and the process upgrades validated in this study are expected to substantially reduce $CO_2$ capture costs when applied in demonstration $CO_2$ capture plants.

맥동연소기술을 적용한 산업용 복사관 버너시스템의 특성 평가 - NOx 저감 및 성능 향상 - (Characteristic Evaluation of Industrial Radiant Tube Burner System with Oscillating Combustion Technology - NOx Reduction and Performance Improvement -)

  • 오혁진;조한창;조길원
    • 대한기계학회논문집B
    • /
    • 제35권5호
    • /
    • pp.539-545
    • /
    • 2011
  • 맥동연소기술을 적용한 산업용 복사관버너의 연소특성을 살펴보기 위해 실규모 (120,000 kcal/h) 산업용 복사관버너 설비를 사용하여 실험실 및 현장 테스트를 수행하였다. 제철부생가스를 사용하는 산업용 복사관버너의 3 가지 종류를 하나의 W 형 복사관이 장착된 실험설비에서 실험하였다. W 형 복사관이 다수 사용되는 대형 설비를 이용하여 장기운영 실험을 실시하였다. 맥동연소기술을 적용한 기실험설비들을 대상으로 성능향상 및 배가스조절 측면에서 다양한 실험조건으로 테스트를 진행 하였다. 맥동연소기술의 적용가능성 평가를 위해 NOx 저감 및 효율향상을 분석하였다. 맥동연소기술의 적용결과 에너지 절감, 복사관 수명 향상 및 생산성 향상 등이 얻어짐을 확인할 수 있었다. 최고의 성능 및 배가스 조절을 얻기 위한 최적의 운전조건이 각 버너별로 결정되었다.

사례연구 분석을 통한 발주방식별 성과비교 (Project Performance Comparison Based on Different Types of Project Delivery System)

  • 이수경;정영수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.207-209
    • /
    • 2011
  • Numerous reports show that alternative project delivery systems (PDSs) such as design-build (DB), construction management at risk (CMR), and design-build-maintain (DBM) are increasingly used in many countries. This study compared characteristics of each PDS (design-bid-build (DBB), DB, CMR, or DBM) by analyzing quantitative data from 9 research articles. In order to compare characteristics between DBB and alternative PDSs, the study is based on principal 3 factors - Time, Cost, and Quality. DB shows the best performance in the time part and also the cost performance depending on facility type and project size. The performance of quality has minor difference among different PDSs. These results support the fact that using an appropriate PDS by the characteristic of a project makes high value of efficiency and productivity.

  • PDF

가설기자재 상태등급별 구조성능에 관한 연구 (A Study on Structural Performance by Condition Grade of Temporary Equipment)

  • 문성오;모승언;윤예빈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 가을 학술논문 발표대회
    • /
    • pp.16-17
    • /
    • 2020
  • The Temporary construction refers to the construction or dismantling of temporary structures installed for the construction of the main structure at the construction site, and the members constituting this temporary facility are called temporary equipment. Temporary equipment used in construction sites is mostly used products that are reused rather than new products, and it is necessary to consider performance degradation due to repeated use. This study is a preliminary study to develop the performance evaluation criteria applied to temporary equipment that is distributed and reused for secondhand. This study is to analyze the performance status of temporary equipment of used goods owned by rental companies by condition grade through performance tests.

  • PDF

폴리머 애자 신뢰성평가 기준 제정 방향 및 평가설비 구축 (The criterion of reliability evaluation and the evaluation facility for composite insulator)

  • 김익수;김민규;김익균;강동필;박효열;한동희;신영준
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 춘계학술대회 논문집 전력기술부문
    • /
    • pp.147-148
    • /
    • 2001
  • The construction of reliability evaluation according to their fields was promoted under the supervision of Agency for Technology and Standards for establishing the relevant institution & infrastructure that can fundamentally solve the reliability problems, the biggest obstruction when the developed electric components & materials come into the market. This paper describes the criterion of reliability evaluation and the evaluation facilities for the purpose of heightening the reliability of composite insulator estimated as the new material among the electric components & materials. We will understand the criterion of reliability evaluation with two parts as the performance evaluation based on various kinds of standards (especially IEC) and as the long-term reliability evaluation utilizing the accelerated aging & flashover test methods. Therefore we aim for constructing the criterion of reliability evaluation as the foundation for evaluation so as to support the industrial group based on KERI facilities.

  • PDF

자동차 도장공정의 생산성 향상을 위한 시뮬레이션 분석 (Analysis of the Productivity of Automobile Painting Process Using Computer Simulation)

  • 김원경
    • 한국시뮬레이션학회논문지
    • /
    • 제8권2호
    • /
    • pp.73-85
    • /
    • 1999
  • In this paper, the productivity estimation of the painting line in an automobile plant is studied. To improve the bottleneck and the weak point of the process, computer simulations are performed. In determining the system specification, the status of the conveyor lines and the other physical facilities are considered in order not to intervene with each other and to satisfy the painting facility restrictions. As simulation parameters, production performance ratio, number of hanger and dolley, down time, speed of conveyor and the pitch of a painting body are chosen on the basis of exhaustive field evaluation to study their effects on the capacity of the process. The results of the simulation show that we can improve the capability of they system without additional investment to the plant facility. The best condition for the maximum capacity of the process is selected by comparing the alternative computer simulation results. As a simulation language, Promodel is used which is very useful and easy to use in manufacturing oriented simulation.

  • PDF

우리나라 영유아 보육시설의 친환경 실내를 위한 체크리스트와 디자인안 제안 (Checklist and Design Recommendations for the Interiors of Korean, Eco-healthy Childcare Facilities)

  • 천진희
    • KIEAE Journal
    • /
    • 제10권6호
    • /
    • pp.105-114
    • /
    • 2010
  • As children are known to touch and chew everything, green cleaning procedures are an important step in preventing children from ingesting harmful toxins. The objectives of this study are to develop a new, self-evaluation checklist and to suggest design recommendations which comply with easy, adaptable, economical ways to improve the eco-friendly indoor environment of Korean childcare facilities. The information compiled during this study was collected through literature review and internet surveys1) from July, 2009 to February, 2010. The results of this study show that the current Korean childcare accreditation system and practices emphasize clean building interiors, policies for sanitation and cleanliness, and control of humidity and lighting. On the other hand, the information provided by green-building rating systems from GBCC, LEED, and GBTool offers additional and comparative details regarding indoor environment quality and standards regarding the IAQ performance and management plan, ventilation and thermal comfort systems, views from windows, acoustics, and lighting. In conclusion, this document provides an appropriate and easy-to-follow, self-evaluation checklist composed of eight criteria and 51 practical items. This study also provides the design recommendations composed of 27 practical ideas focusing on interior elements. Both the checklist and design recommendations I have suggested can be a post-occupancy tool for evaluating eco-healthy facility standards as well as tips for continuing to maintain eco-healthy childcare facilities.

원전구조물 고강도철근 모듈화를 위한 용접방법 성능평가 (Performance Evaluation of Welding Method for Modular of High-Strength Reinforcing Bars to the Nuclear Power Plant Structures)

  • 임상준;이한우;김형섭;방창준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.278-280
    • /
    • 2013
  • To minimize construction quantity of nuclear facility, it is required to reduce reinforcing bar amount and solve reinforcing bar concentration and for this, it is necessary to develop application design technology and modular of high strength reinforcing bar. Hence, KHNP reduces excessive reinforcing bar amount which can cause possibility of poor construction of concrete through design standard development and modular of nuclear facility structure using high strength reinforcing bar to raise economics and has its purpose to maintain high-level safety and durability as they are.

  • PDF

한양대학교 간이차단 합성시험설비구축 (HY Simplified Synthetic Test Facility)

  • 장용무;황률;김철호;이방욱;구자윤
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2009년도 추계학술대회 논문집
    • /
    • pp.220-220
    • /
    • 2009
  • We are developing of the evaluation technique and system for testing the performance of circuit breaker using Simplified Synthetic circuit. This facility specification is up to 90[kApeak] and up to 300[kVpeak]. It is possible to verify the interrupting capability by using low-energy and reduce the development period and the cost.

  • PDF

Development of Safety Assessment Indicators and Facility Management System for Crime Prevention - A Case Study of Park -

  • Lee, Su-Ji;Lee, Seung-Su;Song, Ki-Sung;Hwang, Jung-Rae
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권7호
    • /
    • pp.109-116
    • /
    • 2019
  • In this study, a GIS-based park safety assessment index was developed to enable objective park vulnerability assessment through data-based GIS analysis, a safety assessment was conducted by selecting a target site where various parks are operated and applying the park safety assessment index. In addition, a facility management system was developed for efficient management of the park safety assessment to update the park safety and provide a foothold for indirect PPGIS. In the case of the assessment index of the safety rating of the park, it was possible to conclude that the accurate quantitative performance was given to the calculation of the safety grade of the park based on the fact that the facilities are different depending on the environment and the size of the park. In addition, the marking the safety grade of parks, as well as the function to show the safety facilities of parks, a common living area for citizens, the management system is expected to have an impact on promoting the use of parks. In the future, in functions such as reporting of facility failures and verifying civil information are implemented by applying civic group participation programs and crowd-sourcing technologies, it is believed that all facilities as well as parks managed by the local government can be managed more efficiently.