• Title/Summary/Keyword: Performance Demonstration Test

Search Result 137, Processing Time 0.042 seconds

Development of Reactor Vessel Head Penetration Performance Demonstration System in Korea (국내 원자로 상부헤드관통관 기량검증 기술개발)

  • Kim, Yongsik;Yoon, Byungsik;Yang, Seunghan
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.10 no.1
    • /
    • pp.44-50
    • /
    • 2014
  • There were many flaw issues of reactor vessel head penetration in USA fleets. USNRC issued 10CFR50.55a to implement reactor vessel head penetration ultrasonic examination performance demonstration(PD) in US for enhancement of inspection reliability. After September 2009, all US utilities inspected their RVHP with PD qualified system. Korea Hydro and Nuclear Power Company(KHNP) have developed reactor vessel head penetration performance demonstration system for ultrasonic test to apply for pressurized light-water reactor power plants in accordance with 10CFR50.55a since September 2011. RVHP configuration surveying and analysis, code requirement analysis, and performance demonstration specimen design were performed up to this day. Fingerprinting of manufactured specimen, development of test data management program, development of operation procedure, input of flawed data, and development of final report will be performed for the next step. This paper describes the development status of the performance demonstration system for reactor vessel head penetration ultrasonic examination in Korea.

Study on Performance Demonstration Test Result of Ultrasonic Examination in Nuclear Power Plant (원자력발전소 초음파검사자 기량검증시험 결과 검토)

  • Jung, Nam-Du;Moon, Yong-Sig;Lee, Seung-Pyo
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.34 no.5
    • /
    • pp.384-389
    • /
    • 2014
  • In this paper, the result of an ultrasonic performance demonstration are analyzed. The requirements for an ultrasonic performance demonstration (PD) for a nuclear power plant were first described in ASME B&P Code Section XI, Appendix VIII (1989 winter addenda). In order to establish the performance demonstration scheme in Korean nuclear power plants, the Korea Hydro & Nuclear Power Co. Ltd (KHNP) has developed the Korean Performance Demonstration (KPD) system for the for the ultrasonic examination of nuclear power plants. An analysis of the ultrasonic performance demonstration results from 2004 through 2013 will improve the detection of flaws in an ultrasonic examination, as well as the further development of the KPD training system.

Round Robin Test for Performance Demonstration System of Ultrasonic Examination Personnel (초음파검사자 기량검증 체제를 위한 다자비교시험)

  • Yoon, Byung-Sik;Yang, Seung-Han;Kim, Yong-Ho;Kim, Yong-Sik;Yang, Dong-Soon
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.24 no.4
    • /
    • pp.378-383
    • /
    • 2004
  • The Korean Performance Demonstration(KPD) System for the ultrasonic testing personnel, equipments and procedures applicable to the Class 1 and 2 piping examination for nuclear power plant in Korea has been established. A round robin test was conducted in order to compare the examination results by the method of Performance Demonstration(PD) with the traditional dB-drop method. The round robin test shows that the reliability of the PD method is better than that of the dB-drop method. As a result, adoption of the PD method to the in-service inspection of the nuclear power plants will improve the reliability of the ultrasonic test results.

Technology Demonstration Plan and Status of a 75-$Ton_f$ LRE Thrust Chamber (75톤급 액체로켓엔진 연소기 기술검증 계획 및 현황)

  • Choi, Hwan-Seok;Han, Young-Min;Kim, Young-Mog
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2009.11a
    • /
    • pp.15-18
    • /
    • 2009
  • Technology demonstration for the development of a 75-tonf liquid rocket engine(LRE) thrust chamber for a space launch vehicle has been started on the basis of the previously acquired 30-tonf LRE technologies. For this purpose, a technology demonstration plan was established upon considering the currently available firing test facility in Korea and performance evaluation firing tests were performed on technology demonstration model thrust chambers under a restricted test condition. This paper describes the plan and current status of technology demonstration for a 75-tonf LRE thrust chamber.

  • PDF

Analysis and Evaluation of 3kW Grid-Connected PV System by Field Demonstration Test (3kW급 계통연계형 태양광발전시스템의 실증시험 분석평가)

  • So, Jeong-Hoon;Yu, Gwon-Jong;Jung, Myung-Woong;Jung, Young-Seok;Choi, Ju-Yeop
    • Proceedings of the KIEE Conference
    • /
    • 2003.07b
    • /
    • pp.1353-1355
    • /
    • 2003
  • Total six units of 3kW photovoltaic (PV) system and data acquisition system (DAS) are constructed for analyzing performance of PV system at field demonstration test center of Gwang-Ju in Korea. As climatic and irradiation conditions are varied, operation characteristics of the PV system are collected and analyzed in data-acquisition system. Furthermore, not only performance test of each PV system component such as PV module and power conditioning system, but also performance of total PV system e.g. system efficiency, electric power and loss factor at the site are reviewed.

  • PDF

Power and Economic Simulation of Island for the Field Demonstration Test of Smart Microgrid System Based on Stand-alone Wind power (독립형 풍력기반 Smart Microgrid 시스템의 현장 실증 시험을 위한 도서지역 전력 및 경제성 시뮬레이션)

  • Kang, SangKyun;Lee, EunKyu;Lee, JangHo
    • New & Renewable Energy
    • /
    • v.10 no.3
    • /
    • pp.22-30
    • /
    • 2014
  • The isolated self-generating electricity with diesel engine generator has been used in islands far away from main land. It costs high because of increasing oil price, and unsafe to have supplying oil and its related components by ship due to unexpectable marine conditions. Therefore there is the need for the hybrid system of renewable energy like wind or solar energy systems with oil engine generator, which can reduce oil use and extend oil supplying period. In this study, the feasibility of such hybrid system with smart micro grid on the eight islands of Jeon-nam province is surveyed to find good place for the demonstration test of the hybrid system. In each island, 3 wind turbine systems of 10 kW and photovoltaic of 20 kW are tested with already installed diesel engine. The performance and costs of the hybrid system in each island are compared in the given conditions of solar and wind energy potential. As a result of the study, Jung-ma island is recommended for the optimum place to make real field demonstration test of isolated hybrid generating and smart grid systems.

Corrosion behaviors of SS316L, Ti-Gr.2, Alloy 22 and Cu in KURT groundwater solutions for geological deep disposal

  • Gha-Young Kim;Junhyuk Jang;Minsoo Lee;Mihye Kong;Seok Yoon
    • Nuclear Engineering and Technology
    • /
    • v.54 no.12
    • /
    • pp.4474-4480
    • /
    • 2022
  • Deep geological disposal using a multibarrier system is a promising solution for treating high-level radioactive (HLRW) waste. The HLRW canister represents the first barrier for the migration of radionuclides into the biosphere, therefore, the corrosion behavior of canister materials is of significance. In this study, the electrochemical behaviors of SS316L, Ti-Gr.2, Alloy 22, and Cu in naturally aerated KAERI underground research tunnel (KURT) groundwater solutions were examined. The corrosion potential, current, and impedance spectra of the test materials were recorded using electrochemical methods. According to polarization and impedance measurements, Cu exhibits relatively higher corrosion rates and a lower corrosion resistance ability than those exhibited by the other materials in the given groundwater condition. In the anodic dissolution tests, SS316L exposed to the groundwater solution exhibited the most uniform corrosion, as indicated by its surface roughness. This phenomenon could be attributed to the extremely low concentration of chloride ions in KURT groundwater.

Estimation and Demonstration Test Plan for Availability with Weibull Lifetime and Lognormal Repair Time (와이블 수명분포와 대수정규 수리시간분포 하에서 가용도의 추정과 실증시험계획)

  • Seo, Sun-Keun
    • Journal of Applied Reliability
    • /
    • v.14 no.1
    • /
    • pp.1-9
    • /
    • 2014
  • One important measure of performance for a repairable system is steady-state availability. In this paper, a method to estimate and establish confidence interval for the steady-state availability under Weibull lifetime and lognormal repair time distributions is proposed. Also, bias and mean squared error of a point estimator for an availability are investigated. In addition, a procedure to derive the sample size and critical value for availability demonstration test is presented and illustrated with a numerical example.

Performance Analysis of Grid-Connected PCS for PV System by Field Demonstration Test

  • So J.H.;Jung Y.S.;Yu G.J.;Jung M.W.;Kang G.H.;Choi J.Y.
    • Proceedings of the KIPE Conference
    • /
    • 2003.07b
    • /
    • pp.516-519
    • /
    • 2003
  • 3kW photovoltaic (PV) systems and data acquisition system are constructed for performance analysis of PV system at field demonstration test center (FDTC) of Korea. As climatic and irradiation conditions are varied, the performance characteristics of PV system are collected and analyzed in data acquisition system. From these results, the performances of gird-connected power conditioning system (PCS) fur PV system have been evaluated and analyzed. Furthermore, performance indices of grid-connected PCS e.g. output power, efficiency, loss factor, and the other index at the site are reviewed.

  • PDF

Combustion Characteristics of Technology Demonstration Model for Staged Combustion Cycle Engine (다단연소사이클 엔진 시스템 기술검증시제 연소성능 평가)

  • Im, Ji-Hyuk;Woo, Seongphil;Jeon, Junsu;Lee, Jungho;Lee, Kwang-Jin;Han, Yeoung-Min
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2017.05a
    • /
    • pp.108-111
    • /
    • 2017
  • High performance upper stage engine is necessary for space launch vehicles of geostationary orbit, and staged combustion cycle engine is suitable due to high specific impulse. Technology demonstration model for 9 tonf class staged combustion cycle engine, which is consisted of turbopump, preburner, combustion chamber and supply system, was assembled, and hot-firing test was conducted for three seconds in Upper-stage Engine Test Facility of Naro Space Center. Ignition, combustion and shut down of engine system was performed normally, and its performance parameters were evaluated.

  • PDF