In 2000, post-construction evaluation was introduced for the purposes to evaluate demand, cost, and construction period of public construction projects and to reduce errors of public order agencies. However, pricing guide of post-construction evaluation has not been established, which becomes a cause of quality degradation of post-construction service and conflict occurrence. This study suggests the pricing guide in the form of percentage of construction cost method and cost plus fee method based on data of post-construction evaluation. This study investigates the construction costs and service costs for post-construction evaluation and conducts the comparative analysis of 'percentage of construction cost method' and 'cost plus fee method.' The analysis result shows 'cost plus fee method' is more accuracy than 'percentage of construction cost method.' In particular, cost plus fee method includes various correction coefficients, such as distance, area, and integration, in order to reflect the project characteristics of each infrastructure, and suggests linear construction (roads, railways), nonlinear construction I (housing and industry complex), and nonlinear construction II (airports, seaports, dams, water and sewage).
Journal of the Korea Institute of Building Construction
/
v.12
no.5
/
pp.518-527
/
2012
This study uses a hybrid estimation tool for effective cost data management of building projects, and develops a realistic cost estimation model. The method makes use of newly available information as the project progresses, and project cost and percentage progress are analyzed and used as inputs for the developed system. For model development, case-based reasoning (CBR) is proposed, as it enables complex nonlinear mapping. This study also investigates analytic hierarchy process (AHP) for weight generation and applies them to a real project case. Real case studies are used to demonstrate and validate the benefits of the proposed approach. By using this method, an evaluation of actual project performance can be developed that appropriately considers the natural variability of construction costs.
Journal of the Korea Institute of Building Construction
/
v.16
no.5
/
pp.463-470
/
2016
Construction companies calculate their revenues and costs from constructing activities using the 'Percentage of Completion Method', which is based on ratio of actual construction cost to total costs estimated. The reliability of the net profit of construction companies is being evaluated lower than other industries due to incorrect application of 'Percentage of Completion Method' to cover losses actually occurred. Therefore, the purpose of this study is to verify the quality of earnings calculated based on 'Percentage of Completion Method' in terms of information usefulness. Results from empirical analysis show that investors in stock market underestimate the value of the construction companies' earning information by applying 'Percentage of Completion Method' and not actively use in investment decision making. Accordingly, it has been confirmed that the association between income information and stock prices falling. These results suggest the need for strict supervision of the supervisory authorities and the practical application of 'Percentage of Completion Method' in reliability.
Korean Journal of Construction Engineering and Management
/
v.16
no.3
/
pp.152-164
/
2015
Enhancing clarity and transparency of the pricing guide for technical services for public construction works enables the prediction and reimbursement of the service cost for project owners and bidders, while it would also yield benefits for engineers who carry out the construction tasks. In order to improve the global competitiveness of construction service industry, the government revised its pricing guide for techical services for construction works recently, moving away from its previous percentage-of-construction-cost method towards the Cost Plus a Fee Method. However, since the Cost Plus a Fee Method results in the rise of the service price by 153%~197%, there is the need for a review on the method and basis of the adjustment in order to avoid controversies regarding the application of the revised method. In this context, this paper analysed the 2014 revision of the pricing guide for technical services for public construction works through comparison with foreign cases including those of the US and the UK. The analysis yielded the conclusion that, while the shift towards Cost Plus a Fee Method which is widely used in advanced economies is a very meaningful change in large measure, certain aspects still remain problematic. Unlike in advanced economies, the detailed break-down shows the direct labor cost includes certain indirect expenses. Also, indirec expenses are admitted so comprehensively as to include overhead costs and technology royalties. These problems results in redundant estimation of certain expenses, and obstructs transparency in spending details. This paper proposes various improvement measures to address these issues.
Journal of the Korea Institute of Building Construction
/
v.6
no.3
s.21
/
pp.115-122
/
2006
This study is aimed to get clear model for CM fee level in public construction project. For the practical use and main target, CM for fee contract only is assessed and analysed. Cost estimate by percentage of total contract sum and method based on the historical construction data have significant deficiency. An regression model and probabilistic model are suggested with 9 independent variables. In the case of limited work scope, an element based floor area model is suggested and concluded with fish-bone scheme.
Proceedings of the Korean Institute of Building Construction Conference
/
2013.05a
/
pp.124-125
/
2013
The purpose of this research is to propose an approximate estimation system for Modernized Hanok. Mock-up (Jisinjae) site data has been collected and analysed to characterize the modernized Hanok and to examine the range of cost fluctuation rate with each work items. As a result, number of floor, area (㎥), shape, methods and materials were considered as key factors for price change on the total construction cost. Furthermore, wood structure (34%) and roof (17%) account for major cost percentage. The cost fluctuation rate of two factors were -3.3%~+5.6% (wood structure) and -4.1%~+4.2% (roof). For further research, existing method will be analysed in order to developing the Hanok estimation system. And the cost fluctuation rate of every work items will be continually evaluated.
Korean Journal of Construction Engineering and Management
/
v.1
no.1
s.1
/
pp.63-71
/
2000
The paper considers two non-deterministic methods of analysing the risk exposure in a cost estimate The fist method(referred to as the 'conventional statistical' method) analyses cost data directly, to describe a probability distribution for total cost. The second method(referred to as the 'Monte Carlo simulation' method) interprets cost data directly, to generate a probability distribution for total costs from the descriptions of elemental cost distribution. The common practice of allowing for risk through an all-embracing contingency sum or percentage addition is challenged. Rather than excluding conventional, non-deterministic methods, they are here presented as possibly the only of effective foundation on which to risk management in cost estimating.
Kim, Hu Yong;Ryu, Kuk Mu;Kim, Kyoon Tai;Jun, Young Hun;Kim, Yea Sang
Korean Journal of Construction Engineering and Management
/
v.19
no.6
/
pp.124-134
/
2018
Despite the many advantages of modular housing, low preference for modular housing for consumers who are familiar with RC structure leads to high construction cost of modular housing. The cost of modular buildings is about 130% of that of RC structures, so it is urgent to secure economical efficiency of modular buildings. Therefore, in this study, after calculating the savings amount of modular housing by type of construction work, economic analysis was conducted from a long - term perspective. In order to carry out the research, the authors compiled and analyzed the material cost, labor cost, and expenses incurred by each type of work by reclassifying the statement of the modular housing into the factory production and the site installation. After that, Pareto diagrams were created to find a core work that is included in the cost ratio of about 80%, and selected it as a cost reduction subject. Based on the assumption that the market size of domestic modular housing is similar to the level of modular advanced countries such as Japan and European countries, six cost reduction methods were set up that reflects the characteristics of the modular construction method and used for the expert interviews. Cost saving potentials in percentage from the interview were converted to the amount of savings that can be achieved by each type of method when applying the method. Finally, the findings of the study are expected to suggest long-term directions for technical development for modular construction and cost savings.
Korean Journal of Construction Engineering and Management
/
v.16
no.4
/
pp.139-145
/
2015
Modular construction is combined with manufacturing production process and conventional construction industry technique. Considering characteristic of modular construction production process, manufacturing facilities require indirect costs for utilities, equipment, and overall maintenance, which can affect modular units pricing. However, current modular construction cost classification is inadvertent to reflect the manufacturing overhead costs, because it is generally added as a percentage to sum of labor, material and equipment as it called in single cost pool used. This process is easy to estimate the total construction cost at the project starting points, but it brings on misunderstanding of project profit estimations by "cross subsidization phenomenon". To prevent this situation, in this research aims to provide modular construction overhead cost handling process at the detailed indirect cost calculation for manufacturing stage using Activity-Based Costing as one of the powerful method for overhead costs estimation and allocation. Using this research results, modular construction cost estimators have more detailed cost information of modular units and prevent to misallocate indirect costs. Also, it can be utilized to aid the understanding of the company's profit structure.
Proceedings of the Korean Institute of Building Construction Conference
/
2017.05a
/
pp.146-147
/
2017
Recently, as the living standards of residents in apartment houses continued to improve, the dispute of post management have also increased. one of the Issue, Concrete Cracks comprised high percentage of dispute. Especially, between criteria the cost of repairing defect and the judgement of defect isn't clear, they are a lot of dispute in this regard. Even though lots of the criteria about Inter-layer crack is existed by judging defects, In a court, they are judging their own criteria about Inter-layer crack. The purpose of this study is to compare and analyze Defect Judement Standard both MOLIT and Court, and to provide the Improvement for Defect Judgement and Repair Method of Inter-layer concrete crack.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.