• 제목/요약/키워드: Peak operation

검색결과 803건 처리시간 0.031초

장기전원계획에 있어서 수력운전을 고려한 운전비용 계산모형 (Production Costing Model Including Hydroelectric Plants in Long-range Generation Expansion Planning)

  • 신형섭;박영문
    • 대한전기학회논문지
    • /
    • 제36권2호
    • /
    • pp.73-79
    • /
    • 1987
  • This paper describes a new algorithm to evaluate the production cost for a generation system including energy-limited hydroelectric plants. The algorithm is based upon the analytical production costing model developed under the assumption of Gaussian probabilistic distribution of random load fluctuations and plant outages. Hydro operation and pumped storage operation have been dealt with in the previous papers using the concept of peak-shaving operation. In this paper, the hydro problem is solved by using a new version of the gradient projection method that treats the upper / lower bounds of variables saparately and uses a specified initial active constraint set. Accuracy and validity of the algorithm are demonstrated by comparing the result with that of the peak-shaving model.

  • PDF

권총의 최대반동력 측정 시스템 구축 (Establishment of The System for Checking Peak Recoil Force in a Pistol)

  • 박문선;엄혁;구태완;강범수
    • 한국정밀공학회지
    • /
    • 제16권1호통권94호
    • /
    • pp.87-94
    • /
    • 1999
  • The peak recoil force in a pistol have an effect on the reliability of the frame and target shooting. The experimental system has been established for measurement of the peak recoil force, which consists of force and velocity sensors, high speed camera. For effective operation of the system, a software has also developed, and combined with the hardwares. Several pistols have been tested and compared quantitatively on the peak recoil force and impact energy. It is concluded that the established system can be utilzed for checking peak force, and data accumulation for new pistol design.

  • PDF

아파트 고가수조 자동급수장치를 이용한 전력피크 감소 및 전력시장에서의 효과 분석 (The Technology of Peak Demand Reduction using Automatic Water Tank Pumping System on the Apartment And Analysis of Effect of Energy Cost)

  • 이재걸;이윤경;조원우
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.161-163
    • /
    • 2006
  • This paper introduce the technology of peak demand reduction using automatic water tank pumping system on the apartment. That systems on the apartments installed water tank can control pumping(electricity) demand. Generally, system peak demand is occurred at the same time on workday and many water pumps consume electric power randomly. At this point, shift of operating time of water pump can reduce peak demand using automatic water tank pumping system. We were operating this system on some apartments for test of effect of peak demand reduction. and we represent result of demand shift. This result suggests that spread of the automatic water pumping system can contribute to reduce system peak demand and reduce system operation cost.

  • PDF

도시철도 시스템 전기요금 절감을 위한 혼합정수계획법 기반 ESS(에너지저장장치) 스케줄링 기법 (Mixed Integer Programming (MIP)-based Energy Storage System Scheduling Method for Reducing the Electricity Purchasing Cost in an Urban Railroad System)

  • 고락경;공성배;주성관
    • 전기학회논문지
    • /
    • 제64권7호
    • /
    • pp.1125-1129
    • /
    • 2015
  • Increasing peak load is one of the major concerns about operation of urban railroad systems. Since ESSs (Energy Storage Systems) have a great potential for shaving the peak load, there has been a growing interest in the use of ESS for peak load reduction. Also, ESS can be optimally scheduled to minimize the electricity purchasing cost under a given ToU (Time-of-Use) tariff by taking advantage of electricity price difference between peak and off-peak time. This paper presents a Mixed Integer Programming (MIP)-based ESS scheduling method to minimize the electricity purchasing cost under a ToU tariff for an urban railroad system.

Precise Analytical Solution for the Peak Gain of LLC Resonant Converters

  • Hong, Sung-Soo;Cho, Sang-Ho;Roh, Chung-Wook;Han, Sang-Kyoo
    • Journal of Power Electronics
    • /
    • 제10권6호
    • /
    • pp.680-685
    • /
    • 2010
  • Although LLC resonant converters have the advantages of a wide operation range and high efficiency, the lack of an analytical solution for the peak gain makes it difficult to optimize the resonant tank design, when considering not only the normal condition but also the holdup time requirement. In this paper, based on a mathematical analysis of a LLC resonant converter at the peak gain point, an analytical solution for the peak gain has been developed. By using the developed analytical solution, the peak gain with given resonant tank parameters can be obtained. To confirm the validity of the developed analytical solution, simulations and experimental results are compared.

Incremental DP에 의한 홍수시 댐군의 연계운영 (An Optimal Operation of Multi-Reservoirs for Flood Control by Incremental DP)

  • 이재형;이길성;정동국
    • 물과 미래
    • /
    • 제25권2호
    • /
    • pp.47-60
    • /
    • 1992
  • 북한강 수계에 위치한 화천댐과 소양강댐을 홍수시 연계운영을 위하여 Incremental DP를 사용하여 최적운영모형을 개발하였다. 목적함수로는 의암댐 합류점의 첨두 유량을 최소화하는 것으로 하였으며 수리-수문학적 제약조건은 홍수시 댐조작에 관한 법령, 각 댐 및 하도특성을 고려하여 설정하였다. 특히, 2차 홍수에 대비하여 홍수가 끝나는 시점의 수위가 제한수위가 되도록 하였다. 또한 Incremental DP 모형의 운영결과와 Simulation 및 DP에 의한 단일댐 운영결과를 조절률과 이용률의 관점에서 비교하였고, 합류점의 첨두유량을 Feedback Loop를 이용한 Simulation 결과와 비교하였다. 운영결과 조절률과 이용률이 Simulation 및 DP에 의한 단일댐 운영결과보다 다소 낮게 나타났고, 합류점 유량이 Feedback Loop에 결과보다 크게 나타났는데 이는 홍수말기의 수위에 관한 제약조건 때문이다.

  • PDF

빙해지역 일반 운항 및 쇄빙 운항 시의 빙하중 특성 비교 연구 (A Comparative Study on Ice Load Characteristics between General and Ice-breaking Operations in Ice-covered Waters)

  • 이민우;권용현;임채환;이탁기
    • 한국해양공학회지
    • /
    • 제29권1호
    • /
    • pp.28-33
    • /
    • 2015
  • The icebreaking research vessel ARAON had her second ice trial in the Arctic Ocean from July 16 to August 12, 2010. In this study, the ice loads measured during the “general” operation and “ice breaking” operation in ice-covered waters were analyzed and compared. Whereas the “general” operation stands for the voyage in the water partially covered by ice, the “ice breaking” operation involved substantial ice floes for the ice breaking performance test. Based on the measured data, comparisons of the relationship between the ship speed and ice load, and between the locations of strain gauges and ice loads were investigated. Peak stresses higher than 20 MPa were found. The longitudinal and vertical correlations between the measurement location and ice load were analyzed, and the probability of peak stress was calculated. As a result, the probability function for higher ice loads during both operation modes was expressed in an exponential and power forms.

전력계통에 있어서 신에너지전원(연료전지)의 최적 운용방안에 관한 연구 (A Study on the Optimal Operation of Fuel Cell in Power Systems)

  • 노대석;홍승만;이은미
    • 한국산학기술학회:학술대회논문집
    • /
    • 한국산학기술학회 2002년도 추계학술발표논문집
    • /
    • pp.141-144
    • /
    • 2002
  • Recently, the operation of power distribution systems has become more difficult because the peak demand load is increasing continuously and the daily load factor is getting worse and worse. Also, the consideration of deregulation and global environment in electric power industry is required. In order to overcome these problems, a study on the planning and operation in distribution systems of dispersed generating sources such as fuel cell systems, photovoltaic systems and wind power systems has been performed energetically. This study presents a method for determining an optimal operation strategy of dispersed co-generating sources, especially fuel cell systems, in the case of both only electric power supply and thermal supply as well as electric power supply. In other words, the optimal operation of these sources can be determined easily by the principle of equal incremental fuel cost and the thermal merits is evaluated quantitatively through Kuhn-Tucker's optimal conditions. In order to select the optimal locations of those sources, an priority method using the comparison of total cost at the peak load time interval is also presented. The validity of the proposed algorithms is demonstrated using a model system.

전력시장 환경하에 입찰기반의 직접부하제어 운영방안 (Bid-based Direct Load Control Framework Under Electricity Markets)

  • 이호철;송성환;윤용태
    • 전기학회논문지
    • /
    • 제58권3호
    • /
    • pp.455-461
    • /
    • 2009
  • This paper proposes Direct Load Control(DLC) operation scheme using a bidding system and the methodology to value proper quantity decided by the DLC program, which is a kind of resources for stabilization of electricity market price during peak times by managing consumer electricity demand. Since DLC program in Korea is based on the contract with the customers participating in this program, it is difficult to anticipate voluntary participation. That is, incentive for participants in DLC program is insufficient. To cope with this point, it is necessary to develop a new market mechanism and market compatible operation scheme for DLC programs. DLC market mechanism is deemed to be equipped with iterative bidding system, independent operation from energy market, and interactive with bidding information on energy market. With this market mechanism, it is important to find the optimal operation point of DLC allowing for the factors of stabilizing the electricity market price and compensating DLC implementation. This paper focuses on the mathematical approaches for the bid-based DLC operation scheme and examines several scenarios for the following technical justifications: 1) stabilization of electricity market price during peak times, 2) elasticity of demand.

전력계통에 있어서 분산형 연료전지 발전시스템의 최적 도입계획에 관한 연구 (A Study on the Optimal Planning for Dispersed Fuel Cell Generation Systems in Power Systems)

  • 노대석;심헌;오용택;최재석;차준민
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제50권6호
    • /
    • pp.265-274
    • /
    • 2001
  • Recently, the operation of power systems has become more difficult because the peak demand load is increasing continuously and the daily load factor is getting worse and worse. Also, the consideration of deregulation and global environment in electric power industry is required. In order to overcome those problems, a study on the planning and operation in power systems of dispersed generating sources such as fuel cell systems, photovoltaic systems and wind power systems, has been performed energetically. This paper presents a method for determining an optimal operation strategy of dispersed co-generating sources, especially fuel cell generation systems, considering thermal supply as well as electric power supply. In other words, the optimal operation of those sources can be determined easily by the principle of equal incremental fuel cost and the thermal merit of those sources can be also evaluated quantitatively through Kuhn-Tucker's optimal conditions. In additions, an priority method using the comparison of total cost at the peak load time interval is presented in order ot select the optimal locations of those sources. The validity of the proposed algorithms is demonstrated using a model system.

  • PDF