• Title/Summary/Keyword: Peak operation

Search Result 803, Processing Time 0.047 seconds

Analysis on Current Limiting Characteristics of a Superconducting Fault Current Limiter (SFCL) with a Peak Currnt Limiting Function (피크전류제한 기능을 갖는 초전도한류기의 전류제한 특성분석)

  • Han, Tae-Hee;Lim, Sung-Hun
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.24 no.1
    • /
    • pp.47-51
    • /
    • 2011
  • The superconducting fault current limiter (SFCL) with a peak current limiting function according to the initial fault current with the different amplitudes was suggested. The proposed SFCL, which consists of two limiting components, causes only the first superconducting element among two limiting components to be quenched in case that the initial fault current with the lower peak amplitude happens. On the other hand, the initial fault current with the higher peak amplitude makes both the superconducting elements of two limiting components to be quenched, which contributes to the peak current limiting function of the SFCL. To confirm the fault current limiting operation of the proposed SFCL, the short-circuit tests of the SFCL according to the fault angle were carried out and its effective fault current limiting operations could be discussed.

Optimal Configuration Algorithm for ESS with Renewable Energy Resources Considering Peak-shaving Effects (신재생 에너지가 도입된 전력저장장치의 첨두부하절감 효과를 고려한 최적 구성 알고리즘)

  • Lee, Na-Eun;Kim, Wook-Won;Kim, Jin-O
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.9
    • /
    • pp.1199-1205
    • /
    • 2014
  • A power system configuration has been increasingly advanced with a number of generating units. In particular, renewable energy resources are widely introduced due to the environmental issues. When applying the renewable energy sources with the ESS (Energy Storage System), the ESS is the role of a potential generating resource in the power system while mitigating the output volatility of renewable energy resources. Thus, for applications of the ESS, the surrounding environment of it should be considered, which means that capacity and energy of the ESS can be affected. Moreover, operation strategy of the ESS should be proposed according to the installation purpose as well as the surrounding environment. In the paper, operation strategy of the ESS is proposed considering load demand and the output of renewable energy resources on a hourly basis. Then, the cost of electrical energy is minimized based on the economic model that consists of capital cost, operation cost, fuel cost, and grid cost for a year. It is sure that peak-shaving effects can be achieved while satisfying the minimum cost of electrical energy.

The Analysis of 2004 Summer Peak Load in Korea Power system (2004년 하계 첨두부하 시 계통운영 실적 분석)

  • Song, Tae-Yong;Hwang, Bong-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2004.11b
    • /
    • pp.113-115
    • /
    • 2004
  • This year korea power system had recorded highest peak load for 6 times and finally it made new peak load 51,264MW at July 29th 3:00 PM. The new peak load is increased 8.2% from the last year peak load 47,385MW and korea power system entered 50,000MW load era. The Korea Power Exchange (KPX) snapped power system data at the peak load time using state estimation function in the EMS. And authors converted the power system data at peak load to PSS/E power flow format. Using this PSS/E peak load power flow data, this paper explains demand analysis result shun capacitor operation, voltage distribution at the peak load. And the paper shows the simulation result of 2 contingency analysis using the snapped PSS/E peak load data.

  • PDF

Design of PLL for Low Voltage and High Speed Operation (저전압, 고속동작을 하는 위상 동기 루프(PLL)의 설계)

  • 조용덕;윤영승유상대
    • Proceedings of the IEEK Conference
    • /
    • 1998.10a
    • /
    • pp.1097-1100
    • /
    • 1998
  • In this paper, the PLL(Phase-Locked Loops) for low voltage and high speed operation is described. In other to obtaining above objects, new CMOS circuit technologies have been used in the each block circuit of PLL. It operates with a lock range from 110 up to 700 MHz and has a peak to peak jitter of 50 ps at operating frequency of 250 MHz. It was fabricated in a $0.6\mu\textrm{m}$ CMOS technology and dissipated 45 mW from a single 3.3V.

  • PDF

A Study on the Design and Control Characteristics for Optimum Operation of the PV System-based ESS (PV System 기반 ESS의 최적운전을 위한 설계 및 제어 특성에 관한 연구)

  • Cha, Insu;Park, Jongbok;Jung, Gyeonghwan
    • Journal of the Korean Solar Energy Society
    • /
    • v.36 no.5
    • /
    • pp.19-30
    • /
    • 2016
  • In this study, realize voltage regulation $220Vac{\pm}10%$ or less, frequency fluctuation $60Hz{\pm}1%$ or less over the independent operation and grid-connected operation technologies for power stabilization relates to the ESS designed and manufactured in conjunction with solar installations and solar to compensate the output reduction due to the polarization of the solar module through the polarization prevention technology for preventing the optical module efficiency is lowered, in conjunction with the BMS inverter efficiency was more than 92%, more than 90% of the charging efficiency to the target. This study was designed in conjunction with the ESS solar power plants, grid-connected operation and independent operation, Peak-Cut, it can stabilize the grid via the Peak-Shifting operation

Group Building Based Power Consumption Scheduling for the Electricity Cost Minimization with Peak Load Reduction

  • Oh, Eunsung;Park, Jong-Bae;Son, Sung-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.6
    • /
    • pp.1843-1850
    • /
    • 2014
  • In this paper, we investigate a group building based power consumption scheduling to minimize the electricity cost. We consider the demand shift to reduce the peak load and suggest the compensation function reflecting the relationship between the change of the building demand and the occupants' comfort. Using that, the electricity cost minimization problem satisfied the convexity is formulated, and the optimal power consumption scheduling algorithm is proposed based on the iterative method. Extensive simulations show that the proposed algorithm achieves the group management gain compared to the individual building operation by increasing the degree of freedom for the operation.

Design, Implementation of the Bulk Power Stabilizing System to ensure the appropriate Power System Reliability (적정 공급신뢰도 확보를 위한 안정화장치 구성 및 설치운영)

  • Kim, Chang-Mu;Lee, Hyo-Sang;Lee, Seung-Unn;Kim, Sok-Il
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1510-1513
    • /
    • 1999
  • Carried out simulation for yearly peak and March load time of the KEPCO Power System in 1999. Analysis of the problems in power system operation by powerflow, fault and stability study. Establishment of power system optimal operating plan by installation of power system stabilizer.

  • PDF

The Study of EEG Signal Display as a Multirate Sampling Problem (멀티레이터 샘플링 문제로서의 뇌파신호 디스플레이에 관한 연구)

  • 최한고
    • Journal of Biomedical Engineering Research
    • /
    • v.17 no.2
    • /
    • pp.209-214
    • /
    • 1996
  • The display of biological signals in raster scan monitors often involves a multirate sampling operation which consists of decimation .and interpolation. All electroencephalouaphic (EEG) samples of 10 to 30 seconds (2, 500 to 7, 500 samples at 250[Hz] sampling frequency) must be displayed in the computer screen to keep the aspect ratio of the paper polygraph output. Since the current afrorclable display technology Plots at most 2, 000 Pixels Per row, sDme signal samples need to be discarde4 This Paper studies methods to perform this operation characterizing them from the signal processing viewpoint and compares the display quality among several decimation techniques. Experimental results show that a nonlinear operation such as the peak detection method could be preferable to the canonical linear filtering to reduce aliasing.

  • PDF