• Title/Summary/Keyword: Path duration

Search Result 134, Processing Time 0.028 seconds

Rake Receiver Based on Bit Error Rate of Training Sequence Duration for Underwater Acoustic Communication (수중음향통신을 위한 훈련 신호 구간의 비트 오차율에 기반한 레이크 수신기)

  • Son, Ji-hong;Kim, Ki-man
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.20 no.5
    • /
    • pp.887-894
    • /
    • 2016
  • In the underwater acoustic communication channels, a multipath reflection becomes the cause of obstacle. To solve this problem, a rake receiver has been required for which one could take the time diversity. However, there is a concern about using incorrect path to recover signals with a high weighting value as underwater acoustic communication channels have severe time-variant property. In order to prevent these problem, a rake receiver is proposed which is based on BER(bit error rate) train sequence duration. The performance is evaluated through lake trials; there are three methods that are a proposed rake receiver, a conventional rake receiver, and a non-rake receiver. As a result, the number of bit errors in the proposed rake receiver, that of bit errors in the conventional rake receiver, and that of bit errors in the non-rake receiver is 8, 45, and 72, respectively.

Developing an Optimization Model and Program for Planning the Earthwork Based Upon Transportation Theory (수송모형이론에 의한 토공 운반 최적화 모델 및 프로그램 개발)

  • Lee, Seunghak;Son, Jaeho;Pyeon, Jaeho;Lee, Seunghyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.101-109
    • /
    • 2016
  • During road construction, minimizing haul and return distances as well as keeping a balance between cut and fill quantities are two of the key tasks for earthmoving operation planning. The result of the earthwork planning has a significant impact on the construction cost and duration. Although there have been research efforts regarding optimized earthwork planning using linear programming, the current practice of selecting earthwork planning methods typically depends on a field manager's intuitive and/or experimental knowledge. Furthermore, there is no system considering earthwork influential field factors including the transportation distance, the earthwork quantity, and the recycling ratio of earth volume. Therefore, this research focuses on the development of such a model for planning the optimized earthwork to increase the efficiency of a road construction. The proposed model is developed based upon the transportation problem method which is a part of Linear Programming. The application result of optimization model on a case study shows that the duration and cost for earthwork ha sbeen reduced approximately 19% and 11% respectively

An Efficient Algorithm for Finding the Earliest Available Interval on Connection-Oriented Networks (연결 지향 네트워크에서 최초 가용 구간을 찾는 효율적인 알고리즘)

  • Chong, Kyun-Rak
    • Journal of the Korea Society of Computer and Information
    • /
    • v.15 no.3
    • /
    • pp.73-80
    • /
    • 2010
  • The advancement of communication and networking technologies has enabled e-science and commercial application that often require the transport of large volume of data over wide-area network. Schedulable high-bandwidth low-latency connectivity is required to transport the large volume of data. But the public Internet does not provide predictable service performance. Especially, if data providers and users are far away, dedicated bandwidth channels are needed to support remote process efficiently. Currently several network research projects are in progress to develop dedicated connectionsy sA bandwidth scheduler computes an user requested path based on network topology information and link bandwidth allocationsy In this paper, we have proposed an efficient algorithm for finding the earliest time interval when minimum bandwidth and duration are giveny Our algorithm is experimentally compared with the known algorithm.

Time Management Status of Small Contractors and Suggestions on Education for Time Management in Colleges (소규모 건설회사의 공정관리 현황과 대학의 공정관리 교육방안)

  • Jang, Myung-Houn;Yi, Yong-Kyu
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.6 no.3
    • /
    • pp.413-422
    • /
    • 2016
  • A construction manager tries to complete a construction project within its duration and budget using available resources. Schedule networks such as Bar-chart and CPM(critical path method) are used to finish the project within the duration. A survey shows that small contractors prefer Microsoft Excel to commercial time management softwares to manage construction time in their fields, because the Excel is useful to control cost with schedule and few time management experts works in the small contractors. A college produces talented graduates who are able to manage time of a construction project. But the quality and quantity of college eduction for time management is insufficient. Another survey shows that majors in Architectural engineering of local national universities have the curriculum for time management, and teach mainly the theory of network scheduling and how to make the network schedule. The several majors have classes for the theory and exercise of commercial time management softwares in several majors. It is necessary to educate time management experts able to use Bar-chart and commercial time management softwares for the small contractors.

A Study on the Development of Next Generation Wireless PAN Algorithms with Location Awareness Technique (위치인식기반의 차세대 무선 PAN 알고리즘 개발에 관한 연구)

  • Cho, Juphil
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.16 no.10
    • /
    • pp.2095-2100
    • /
    • 2012
  • In this paper, we propose the channel sounding scheme which is made for ideal communication between some application as well as the short distance of high speed data transmission in MIMO-OFDM system for Wireless PAN. This method is able to perceive the duration of the impulse response through the delaying of power delay profile, modeled a power delay profile which has an attenuate characteristic, and obtained the coefficient of channel response by ML (maximum likelihood). Through the amplitudes, phases and delays associated with each multipath component which were acquired from this channel sounding scheme, we can describe the wave propagation characteristics of channels between the transmitter and receiver so that the receiver could enhance not only the reliability but also the ability of communication link. Multi agent system models can be used to analyze the path of the system within any time frame. Further, parameter values can be perturbed to examine how the path of the system changes in response to exogenous shocks.

In-situ Monitoring of Matric Suctions in a Weathered Soil Slope (풍화토 사면에서 강우로 인한 간극수압 변화에 대한 실험연구)

  • 이인모;조우성;김영욱;성상규
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.1
    • /
    • pp.41-49
    • /
    • 2003
  • Rainfall-induced landslides in a weathered granite soil slope usually happen on shallow slip surfaces above the groundwater table. The pore-water pressure of soil above the groundwater table is usually negative. This negative pore-water pressure (or matric suction) has been found to make a large contribution to the slope stability. Therefore, the variation of in-situ matric suction profiles with time elapse in a soil slope should be understood. In this study, a field measurement program was carried out from June to August, 2001 in order to monitor in-situ matric suctions and volumetric water contents in a weathered granite soil slope. Finite-element transient seepage analyses are also conducted using SEEP/W. The influence of climatic conditions on the variation of in-situ matric suctions could be found to decrease rapidly with the change of depth. It could be found that decrement of matric suction induced by precipitation is affected not only by the amount and duration of rainfalls but also by the initial matric suction just prior to rainstorms. The soil-water characteristic from the field monitoring tends toward the wetting path of SWCC obtained from the laboratory test.

Analysis of the Current Status of Dementia Rehabilitation in Busan, South Korea (부산지역 치매 재활의 현황 분석)

  • Shin, Jae-Wook;Han, Hye-Kyung;Shin, Sang-Hwa;Park, Chan-Hyo;Kim, Hye-Jin;Kim, Dong-In
    • PNF and Movement
    • /
    • v.18 no.2
    • /
    • pp.275-286
    • /
    • 2020
  • Purpose: The purpose of this study is to understand and analyze the current status of dementia management and rehabilitation services in Busan, South Korea, in response to the rapid increase of people with dementia due to the aging of the population. Methods: To investigate the current status of dementia rehabilitation in Busan, a survey was disseminated to dementia safety centers and day- and night-care centers in 16 districts/counties in Busan. Of the 209 day- and night-care centers, 23 institutes were registered in the National Health Insurance Service and received the highest grade (Grade A) in the institute evaluation that was implemented in each district. A telephone interview was conducted, and survey questions were related to the existence of an ongoing dementia rehabilitation program, program presenter, number of participants, progress method, program time, program duration, program contents, and participation path. Results: Dementia safety centers were implementing dementia prevention program, cognitive enhancing program, dementia program, self-help meeting and education program for family of dementia patient. The majority of the presenters of all four dementia-related programs were occupational therapists. The highest number of participants in the dementia prevention program was 15, and the highest number of participants in the cognitive enhancing program, dementia program, self-help meeting and education program for family of dementia patient was 10. All institutes' programs delivered group therapy. As for the time and frequency of the program, most dementia program included three-hour sessions five times a week. Most dementia prevention program, cognitive enhancing program, self-help meeting and education program for family of dementia patient included 60-minute sessions once a week. The most frequently observed program duration for the dementia prevention program and cognitive enhancing program was six months, and the most frequently observed duration for the dementia program was three months. Lastly, study participants most often reported that self-help meeting and education program for family of dementia patient lasted for two months. Among day- and night-care centers in Busan, programs related to cognition were implemented in 18 institutes, and the majority of the program presenters were social workers. Conclusion: In response to the rapidly growing number of dementia patients due to the aging of the population, this study examined the current status of dementia rehabilitation in Busan. The study results underscore the need to develop systems that consider the circumstances in Busan and continuously and systematically support dementia programs.

Characteristics of Visual Attention for the Different Type of Material Finishing in Cafe Space Using by Eye-tracking (시선추적을 이용한 카페 공간 마감재 차이의 시각주의력 특성)

  • Choi, Jin-Kyung;Kim, Ju-Yeon
    • Korean Institute of Interior Design Journal
    • /
    • v.27 no.2
    • /
    • pp.3-11
    • /
    • 2018
  • This study aims to investigate whether there is intensionally changing eye - gaze on the cafe space images with floor finishing materials. In the Yarbus' experiment, he argued that changing information that an observer is asked to obtain from an image changes pattern of eye movements. Based on the scan path evidence, this research have questions as (1) the difference of visual attention on finishing floor material stimulus, (2) visual attention of initial activity time and type of movement paths on AOIs, and (3) visual relation floor area with another AOIs. Eye movements were recorded with the SMI REDn Scientific, which sampled eye position at 30Hz and lasted 2 minutes(120s). Although viewing was binocular, only the right eye was tracked. Of the 66 observers(mean age 22 years, standard deviation: ${\pm}1.82$) who participated in the experiment done by the four point calibration and validation procedures at the beginning tasks. Analyzing qualitative data from the number of fixation and duration on AOIs divided into four parts (AOI I-Floor, AOI II-Wall, AOI III-Ceiling, and AOI IV-Counter) in the stimulus. The results from this experiment analyzed as follows. First, it was significant in the difference of the average number of AOIs fixation times observed for the spatial image using the wood tile flooring material and the polishing tile. The wood tile flooring of stimulus had higher fixation number on AOI-II, AOI-III, and AOI-IV than the polishing tile. On seeing AOI-I was higher attention in the polishing tile stimulus. Second, the observers examined AOI-II intensively in both stimuli. However, the visual intensity was also followed by on the AOI-IV and AOI-I in the wood tile flooring stimulus, and on AOI-I, AO-IV in the polishing tile. Third, visual attention data on each AOIs have divided into the time range of "5 sec" for both images. In the wood tile stimulus, the horizontal movement path followed by AOI-II, AOI-IV, and AOI-II. In the polished tile stimulus, the movement path followed by moving vertically to AOI-II, AOI-I, and AOI-II. This study approached meaningfully and found out the characteristics of visual attention, according to the different intentions of visual attention, the relationship pathways of visual mechanism appeared and also activated by eye-tracking experiments.

A Change of Peak Outflows due to Decision of Flow Path in Storm Sewer Network (우수관망 노선 결정에 따른 첨두유출량 변화 분석)

  • Lee, Jung-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.12
    • /
    • pp.5151-5156
    • /
    • 2010
  • In the previous researches for storm sewer design, the flow paths in overall network were determined to minimize the construction cost and then, it was not considered the superposition effect of runoff hydrographs in the sewer pipes. However, in this research, the flow paths are determined considering the superposition effect to reduce the inundation risk by controlling and distributing the flows in the sewer pipes. This is accomplished by distributing the inflows that enter into each junction by changing the flow path in which pipes are connected between junctions. In this paper, the superposition effect and peak outflows at outlet were analyzed considering the changes of the flow paths in the sewer network. Then, the flow paths are determined using genetic algorithm and the objective function is to minimize the peak outflow at outlet. As the applied result for the sample sewer network, the difference between maximum and minimum peak outflows which are caused by the change of flow path was about 5.6% for the design rainfall event of 10 years frequency with 30 min. duration. Also, the typhoon 'Rusa' which occurred at 2002 was applied to verify the reduction of inundation risk for the excessive rainfall, and then, the amount of overflows was reduced to about 31%.

Improvement of Short Range Performance of Meteor Burst Path with Buried Antenna (지하 매설형 안테나를 이용한 근거리 유성 버스트 통신의 특성개선)

  • 김병철;김기채;이무영
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.9 no.6
    • /
    • pp.788-801
    • /
    • 1998
  • Meteor Burst Communication can provide effective and economical means of communication where long distance VHF NLOS data transmission is needed ; often ranges more than 1000 km. It has been, however, so far considered unsuitable for short distance application because of phenomenal decrease in burst durations, which leads to decreation of total duty rate of the system. This paper extensively analyzes characteristics of shot distance MB(Meteor Burst) path and shows the low duty rate may be improved by increasing burst rate through adapting antennal beam width to cover entire hot-spot region in the space and, by compensating effective burst length throughcutting down man-made noises introduced by antennal. Based on the analysis, we are developed a small-opening-cavity antennal, especially designed for short distance MB path. In operation, the antenna is to be buried under ground surface so as to improve directivity and reduces noise introduction. The antennal exhibits power gain of 3 dB with 90 degree beam width and thus enables to illuminate entire hot-spot regions with the elevation angle of 8-90 degree which is the case of transmission less than 100 km. Directivity horizontal to earth surface is suppressed to minimum which enables to cut man-made noises from near-by sources down to more than 3 dB from the level reported with conventional 4 element Yagi. A series of experiments performed on 100km MB paths have conformed that, with the antenna installed at receiving site, the burst rate and duration time have been noticed to increase by 10 and 20 percent respectively from the values obtained by conventional 4-element Yagi antennal under same testing condition.

  • PDF