• Title/Summary/Keyword: Patching

Search Result 131, Processing Time 0.027 seconds

Development of high performance patching repair mortars with light weight and sulfuric acid resistance properties (경량 및 내황산 특성을 가진 고성능 단면복구 모르타르의 개발)

  • Kim, Kyoungmin;Park, Junhui;Ahn, Tae-ho
    • Journal of the Korean Crystal Growth and Crystal Technology
    • /
    • v.27 no.4
    • /
    • pp.167-172
    • /
    • 2017
  • In this study, high performance patching repair mortars with light weight and sulfuric acid resistance properties were suggested. Their performance estimation were investigated based on KS F 4042 using patching repair mortar with light weight aggregate and soluble polymer of Type I and sulfuric acid resistance mortar of Type II, From these results, it was confirmed that these motors were satisficed and improved by all standard tests of KS F 4042.

The Effects of half-eyes patching on Hemispatial in Patients With Stroke (좌측편측무시 환자에게 양쪽 눈을 반쪽씩 가린 안경착용 중재 시 효과 - 단일사례연구)

  • Yoo, Jae-yeon
    • Therapeutic Science for Rehabilitation
    • /
    • v.3 no.2
    • /
    • pp.83-89
    • /
    • 2014
  • Objective : This study aims to investigate the effect of half- eyes patching for the reduction of unilateral neglect of left-side hemiplegia. Methods : This study used the ABA design. He was required to wear the half- eyes patching during all the period of ADL because unilateral neglect causes many problems in the majority of ADL. The assessments for the unilateral neglect had been performed by the Line bisection and the Albert test once a session (day). Results : Regarding the Means of the errors to the Line bisection and the Albert test, the Means of the errors was not decreased during the period of the intervention (B) and was not decreased after the withdrawal (A'). Conclusions : Half-eyes patching was non-effective to r e lease the unilateral neglect. Further study is necessary to increase the sample size and the duration of experiments.

Analytical Study on the Chloride Ion's Permeation of Reinforced Concrete Repaired by Patching Repair Material (단면수복재로 보수시공한 철근콘크리트내로의 염화물이온 침투에관한 해석적 연구)

  • Yun, Sun-Young;Shin, Sang-Heon;Ryu, Byung-Cheol;Lee, Han-Seung
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.617-620
    • /
    • 2008
  • When the RC structure repaired by patching repair method, which method refilles with patching repair material after removes degraded area, It is necessary to determine chloride ion's permeation from outside of the RC structure repaired by patching repair material. Therefore, in this study, damage from sea environment of structure was predicted, moreover, diffusion coefficient of concrete also determined to figure out rebar's corrosion and concentration of chloride ion. RCPT(Rapid Chloride Permeability Test) was used for ditermination of patching repair material's diffusion coefficient, also connection between material thickness and effect of chloride ion's permeation was examined in analytically. Results which derived by experimental test was used in FEM(Finite Element Method) and equation suggested by JSCE to predict concentration of chloride ion in different distance from surface.

  • PDF

A Proposal for a True VOD Service Combining Patching with a Data Segmented NVOD (데이터 분할방식의 NVOD에 패칭을 결합한 참 VOD 서비스의 제안)

  • Ji, Yong-Jin;Kim, Nam-Hoon;Park, Ho-Hyun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.13 no.3
    • /
    • pp.458-468
    • /
    • 2009
  • The patching technique has been used for removing initial waiting time of NVOD. The technique was applicable only to time segmented NVOD services. However, data segmented NVOD methods have been known to have less initial waiting time or use less server's bandwidths than the time segmented NVODs. Therefore, we expect that if patching is applied to a data segmented NVOD, a more efficient NVOD service will be possible. But there has not been such approach. In this paper, we propose a new VOD scheduling algorithm that combines the patching technique with a data segmented NVOD, thus it uses less server's bandwidths and removes initial waiting time, hence makes a true VOD service possible. The proposed technique also absorbs the storage overhead necessary for client buffering incurred by patching into the data segmentation policy of the NVOD scheduling, hence does not need any extra overhead of the client's resource. Therefore, it is also applicable to the case that the client has resource limits.

A Study on Fatigue Crack Growth of Composite Patching Repaired on Cracked Thick Plate (복합재료 보강재로 보수되어진 균열을 가진 두꺼운 평판의 피로균열 성장에 관한 연구)

  • Jeong, Gi-Hyeon;Yang, Won-Ho;Go, Myeong-Hun
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.25 no.12
    • /
    • pp.2070-2077
    • /
    • 2001
  • An experimental investigation of the effect of composite patching repair was conducted to characterize the fatigue crack growth behavior in thick A16061-T6 (6mm) panels with single bonded patch by fiber reinforced composite patch. Four patch lengths and no patch plate were examined. An analytical procedure, involving three-dimensional finite element method having three layers to model cracked aluminum plate, epoxy by adhesive and composite Patch, is calculated the stress intensity factors. From the calculated stress intensity factors, the fatigue crack growth rates are obtained. At the single patching type, different fatigue crack growth ratios through the palate thickness were investigated by using the experimental and analytical results. The results demonstrated that there was a definite variation in fatigue life depending on the size of composite patch. While crack reached the patch end, retardation of crack growth was also revealed in the bonded repair.

Spontaneous Intracranial Hypotension : Clinical Presentation, Imaging Features and Treatment

  • Park, Eun-Soo;Kim, Ealmaan
    • Journal of Korean Neurosurgical Society
    • /
    • v.45 no.1
    • /
    • pp.1-4
    • /
    • 2009
  • Objective : In the present study, the authors investigated the clinical and imaging features as well as the therapeutic outcomes of SIH (spontaneous intracranial hypotension) patients. Methods : A retrospective review of 12 SIH patients was carried out. The diagnostic work-up included lumbar tapping and measurement of CSF opening pressure, radioisotope cisternography, brain and spinal magnetic resonance imaging (MRI), and computed tomography (CT) myelography. Autologous epidural blood patching was performed in patients who did not respond to conservative therapies, including analgesics, steroids, hydration and rest. Results : Typical postural headache was found in 11 (91%) patients. Nine (75%) patients showed pachymeningeal enhancement on their initial T1-weighted MR images. The CSF opening pressure was less than 60 mm$H_2O$ in 9 of 11 patients. Autologous epidural blood patching was performed in 7 patients, and all of them showed good responses. Conclusion : SIH can present with various clinical presentations and neuroimaging findings. Autologous epidural blood patching is thought to be the treatment of choice for patients with SIH.

Power-Efficient Patching Scheme for Mobile VOD Environments (모바일 VOD 환경에서 에너지 소비를 고려한 효율적인 패칭 기법)

  • Jung, Ey-Suk;Choi, Chang-Yeol;Choi, Hwang-Kyu
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2007.05a
    • /
    • pp.1264-1267
    • /
    • 2007
  • 무선 환경에서 모바일 기기의 전력소모를 줄이는 것은 매우 중요하다. 특히 VOD 서비스 시 지속적으로 WNIC를 사용하여 전력소모가 많은 것은 VOD 서비스에 큰 제약 조건이 되고 있다. 따라서 제안된 PSBC (Patching Scheme based Bursty Communication) 기법은 VOD 서비스 중 모바일 기기의 전력 소모량을 줄이고, 네트워크가 혼잡상태로 빠질 확률을 줄이기 위해 제안 되었다. 서버의 전송량을 줄이기 위해 패칭 기법을 이용하고, 클라이언트의 전력소모를 줄이기 위해 Bursty communication 기법을 활용하게 된다. 제안된 PSBC 기법은 일반적인 VOD 서비스에 비해 50~80%정도 증가된 sleep-mode로 동작함을 성능분석에서 보인다.

  • PDF

Results of Two-stage Surgical Treatment of Tetralogy of Fallot (고식적 단락술후 활로 4 징증의 완전교정수술)

  • Lee, Jae-Dong;Han, Seung-Se;Kim, Gyu-Tae
    • Journal of Chest Surgery
    • /
    • v.21 no.1
    • /
    • pp.101-108
    • /
    • 1988
  • Between July, 19S4. and July, 1987, 9 two-stage repair of symptomatic tetralogy of Fallot were carried out at the department of thoracic and cardiovascular surgery, Kyungpook national university hospital. Their age ranged from 5 years to 18 years [mean age 9.4 years] at the time of total correction, and there were improvement of systemic oxygen saturation values by 10% and decrease of hemoglobin by 1.6gm/dl after shunt procedures. The interval between the initial shunting procedure and total correction ranged for 7 to 101 months with a mean of 32.7 months. Four of these patients required patching of the infundibulum alone, three required patching of the right ventricular outflow tract across the pulmonary annulus, and valved conduit was used in one due to coronary artery anomaly. Aortic cross clamping time averaged 122.2minutes [range from 60minutes to 150minutes], and cardiopulmonary bypass time averaged 174.4 minutes [range from 80minutes to 300minutes]. The operative mortality rate was 22% [2/9].

  • PDF

Soft Systems are Ubiquitous-Defenses are Rare: A Case for Contingent Outsourcing of Patch Management

  • Arnett Kirk P.
    • The Journal of Information Systems
    • /
    • v.14 no.3
    • /
    • pp.23-30
    • /
    • 2005
  • Computer attacks on vulnerable software are ubiquitous. Today's attacks on client PCs can be used to create armies of zombie computers that are capable of wide reach attacks on high profile businesses and governments. The simple act of patching software vulnerabilities will certainly mitigate this problem, but patching has its own set of problems. Further, it is frequently the case that patches which are available to mitigate vulnerabilities are not being made on a timely basis and sometimes are not being made at all. One solution to the patch management dilemma is outsourcing. This paper notes that outsourcing is not a carte blanche decision that can be made based on dollars, but rather that a contingency decision matrix can provide guidance on outsourcing solutions for patch management and other security components as well. The matrix recognizes that IS staff expertise and employee security awareness are two important factors in the outsourcing decision.

  • PDF

Synthesis of Filled-up Pothole Surface by Automatic Pothole Repair Vehicle (자동 도로 수리기에 의해 수리된 도로표면의 예측 표현)

  • 권원태
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.1 no.2
    • /
    • pp.134-143
    • /
    • 1993
  • The trajectory planning for the manipulator installed on "the automatic pothole repair vehicle" is discussed and the final surface of the patched pot hole is simulated in this work. The relationship between the accumulation data of the mixture with and without the movement of the manipulator is identified to utilize the latter data for the calculation of the former one. Based on this relationship, the method to calculate the accumulation of the mixture when the manipulator changes the speed and the direction is also introduced. The trajectory is determined to make the final surface smooth under the condition that the pothole is cut to hexahedron before patching and only the spacing and the shifting of the manipulator is controllable. Final surface is simulated by the computer to prove the adequacy of the determined trajectory.

  • PDF