• Title/Summary/Keyword: Parking lot management

Search Result 114, Processing Time 0.033 seconds

POST-OCCUPANCY EVALUATION (POE) AFTER THE EXPANSION OF AN APARTMENT PARKING LOT

  • Park, Jin-Gu;Oh, Kyung-Taek;Ryu, Gyu-Seok;Jung, In-Su;Lee, Chan-Sik
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1559-1563
    • /
    • 2009
  • Despite the serious lack of parking lots, studies on parking lot expansion are insufficient; research on users' satisfaction following parking lot expansion is practically nonexistent. Therefore, this study sought to provide basic data for the parking lot expansion of old apartments by comparatively analyzing users' satisfaction before and after the parking lot expansion through a questionnaire survey that targeted residents benefiting from the expanded parking lot. Results revealed a low post-occupancy satisfaction with the parking lot expansion despite the parking lot expansion and improvement of the parking lot environment. This was because the parking lot was not expanded up to the second basement floor due to the lack of appropriate parking space. Other factors included the construction cost burden and lack of connectivity of the basement parking lot with elevators. The results actually raise the need for the establishment of an optimally suitable expansion plan and development of method and technology requiring lower cost and shorter construction period in the design and construction processes for parking lot expansion. Through post-occupancy evaluation (POE) after parking lot expansion, this study quantitatively identified the problems associated with the parking lots of old apartments and ensuing expansion effects. The findings in this study can be used as basic data to seek a suitable diagnosis and evaluation method for the parking lots of old apartments.

  • PDF

Characteristics of Occupational Accidents by Type of Parking Lot

  • Park, Myoung Hwan;Jeong, Byung Yong;Park, Cha-O-Rum
    • Journal of the Ergonomics Society of Korea
    • /
    • v.34 no.5
    • /
    • pp.427-436
    • /
    • 2015
  • Objective: This study aims to analyze occupational accidents of parking lot attendants by parking lot type. Background: Recently, efforts are made to analyze accident characteristics by occupation type targeting the workers engaged in the same work. Method: This study analyzes 303 occupational accidents of parking lot attendants occurring from 2010 to 2012. Parking lots are grouped into two groups according to the work environment. One is public/ground type which comprises road side or open area parking lots and the other is building/mechanical type which comprises a multi-story parking building with connecting ramps and/or mechanical parking system. The characteristics of occupational accidents by parking lot type are analyzed. Results: Accident characteristics showed the difference between public/ground type and building/mechanical type on the size of enterprise, age, gender and work experience of the injured. Also the accident type, source of accident and parts of body affected are different between the two parking lot types. Conclusion and Application: The findings of accident characteristics according to parking lot types can be used as baseline data for establishing systemized preventative policies for occupational accidents of parking lot attendants.

A Study on the Construction Management in Apartment Housing's Underground Parking Lot for Reduction of Water Leakage (공동주택 지하주차장 누수저감을 위한 시공관리에 관한 연구)

  • Lee, Jae-Hyun;Choi, Il-Ho;Bang, Jung-Seok;Kim, Hyo-Rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.181-183
    • /
    • 2011
  • This study was carried out about construction management plan to reduce water leakage of underground parking lot in the apartment housing. To minimize effect of upper working load, installation position of jack support and paving with rubble on the top of underground parking lot were studied. By calculation shrinkage strain of underground parking lot scale, water leakage risk in design of level difference was studied. In this study, the basic data about construction management was provided to reduce water leakage of underground parking lot in the apartment housing.

  • PDF

Web-based Parking Lot Management System by Vehicle Movement (차량 영상을 이용한 웹기반 주차관리 시스템)

  • Lee, Hyo-Jong
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.46 no.12
    • /
    • pp.95-101
    • /
    • 2009
  • s economic development has been achieved and society gets complicated, problems of traffic system have been also exposed. Due to these problems, drivers have to endure economic loss and delayed time. A web-based parking lot management system has been proposed to solve this problem. Because a parking lot is an important resource of traffic system, efficient management of parking lots can be means to solve critical problems of traffic system. In this study a simple method is introduced to detect moving vehicles with geometric information of moving objects that has been computed from surveillance cameras installed in a parking lot. Statistical information processed from image data is also stored on a server side, such as total number of parking lots, a number of parked cars and a number of available parking spots. A client who wants to know the nearest parking place can share the information via a mobile device and shorten his or her driving time. Great benefit to both drivers and society is expected if many parking lots are equipped with this system.

A Study on the Improvement of Parking Lot Management using GIS (GIS를 이용한 주차장 관리에 관한 연구)

  • 양인태;유영걸;김재철;이상윤
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2003.04a
    • /
    • pp.409-414
    • /
    • 2003
  • In the beginning of the 21s1 century, the world has been making rapid progress and changed all over the areas. Like the rest, as all domiciliary circumstances for a local development have changed, the continuous development considered environmental view has been accounted as much compared with the high growth-oriented development based on the efficiency so far. As the volume of traffic in urban community increases, the environmental load enlarges inevitably. Particularly, the excess and deficiency problems for all sorts of traffic facilities, like the shortage of parking lots continue to happen in proportion to the increase in traffic. For a design to solve these problems, introduction of the Geographic Information System; GIS applied widely over various fields become necessary. In this research, the supply-demand situation in urban areas is observed. The application of GIS for the purpose of the improvement of parking lot management technique to control effectively facilities related to parking lot in the city brings promoting the efficiency of business data inquiry, data management data correction and so on through graphic and non-graphic database for every kind of draft data, record and register data. The graphic users interface to support effective decision-making is applied for the improvement of work in this study. This research also suggests the way to utilize common database considered linkage with sub-systems related existing urban information system by developing the parking lot management system.

  • PDF

The Study on Parking Lots Management according to Off-Street Parking Lots Characteristics : Focusing on Residential Development District (노외주차장 특성이 주차장 운영여부에 미치는 영향분석 : 택지사업지구를 중심으로)

  • Kim, Tae-Gyun;Byun, Wan-Hee;Lee, Yun-Sang
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.131-143
    • /
    • 2017
  • Automobiles and parking lots have greatly been increased by the continuous development of new towns and residential districts. There were not enough parking lots; and although there were off-street parking lots available for sale, they were not easily sold. Through a parking regulation, local governments can require parking spaces for more than a certain rate in developing areas. Despite local governments should require parking spaces within the parking demand and regulation, they did not investigate parking demands. Off-street parking spaces are not easy to sell because they don't consider the parking demand. In this study, we analyzed the factors that affect the parking management in order to increase sales of the off-street parking. The factors were "the characteristics of the parking lots", "the accessibility of the off-street parking", and "the traffic environment around off-street parking." We have derived suggestions for these factors. In addition, this study has derived nine variables affecting the parking operation in these three factors, and suggested a logistic regression model and the influence of each factors. According to the analysis, "parking signs" were the most influential. Next were "land uses" and "lanes on road".

The Development of Assessment Method for Parking Lot Remodeling Alternative Adopted Asset Management Technique (자산관리 기법을 적용한 주차장 리모델링 대안평가 기법 개발)

  • Yu, Yongsin;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.52-62
    • /
    • 2017
  • The purpose of this study is to develope an assessment method for parking lot remodeling alternative by adopting the asset management technique. In order to identify the Level of Service(LOS) and the Evaluation Measurement(EM), literatures was implemented which documented the consideration of parking lot plan, needs of the apartments' tenant, and various design standards. In addition, the authors conducted a three-time delphi survey for the identified 5 LOS and 19 EM to evaluate suitability and necessity of them and to collect additional opinion of experts. The LOS of parking lot were categorized into 5 areas such as Environmental effect and Convenience, Accessibility and so on. The 19 EM were determined to estimate the LOS quantitatively. The researchers analyzed the degree of importance of LOS and EM by using the Analytic Hierarchy Process (AHP) method. But construction cost was excepted from the analysis, because it is used as an independent variable in alternative assessment. In conclusion, the authors proposed the estimation criteria for EM, and the method and process for alternative assessment be performed to benefit-cost analysis using the LOS variation and construction cost. The assessment method for parking lot remodeling alternative was demonstrated effective to assess the parking lot remodeling alternative by case-study. This study has a academic significance by adopting the asset management techniques in the area of the parking lot remodeling. And the assessment method is expected to help deciding a reasonable remodeling alternative of parking lot, as it ensures the diversity for remodeling of the parking lot and reflects the needs of the occupant.

An Analysis of Complex for a Parking Lot Expansion (주차장 확대를 위한 공동주택 단지특성 분석)

  • Ha, Na;Song, Nak-Hyun;Yoon, Ho-Bin;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1039-1042
    • /
    • 2007
  • The number of vehicle has been increased due to growth of economy. Consequently, the needs for parking area has been increasing. there is a serious problem in aged-apartments. It result from observing a parking lot law at that times. That is the reason why residents demand parking lot expansion. Parking lot addition is being studied on a lots different standpoint to solve the present parking lot condition. Parking lot expansion is limited by housing complex characteristics. This study analyzed the housing complex characteristics of aged-apartment. It is analyzed that the number of house holders, distance between buildings, and level of site for finding housing complex characteristics. The result are as follows. the complex lower than 300 households is about 35% in the Number of households. The buildings which has a moving distance from 41m to 50 is nearly 23%. Them the 멕스둣 house located on the flat is 82%. This study will become a reference data for the parking lot expansion.

  • PDF

A Survey of a Present Utilization of the Parking Lot with the Introduction of a Charging System (일 대학병원 주차장 유료화에 따른 주차장 이용실태 조사)

  • Kim, Jung-Hee;Park, Jin-Sook;Joo, Chan-Uhng;Choi, Ki-Chul
    • Quality Improvement in Health Care
    • /
    • v.4 no.1
    • /
    • pp.116-124
    • /
    • 1997
  • Background : As parking problem caused by increasing owner-driver and patients concentrating to a general hospital is becoming one of the dissatisfactions in medical care. It is time that a general hospital should solve the parking problem in a desirable way. The purpose of this survey is to let the clients understand the basic motivation of the pay parking and develop the better parking system. Methods : Clients of a tertiary care hospital in Chon-ju were surveyed by means of a questionnaire. All in all, 193 subjects answered the questionnaire. Results : In relation to previous experiences, 39.6% of the subjects experienced inconvenience with confused parking lot and the shortage of parking space. Under the current parking system, the subjects who felt the available parking space was enough were more than those who didn't 62.7% of the subjects answered that they could find the parking lot easily. 33.2% of the subjects mentioned that it was not easy to drive in the parking area ; The reasons were pointed out the shortage of space, disordered parking, and insufficient guide. 12.8% of the subjects satisfied with the current administering system of parking lot. The outpatients were more affirmative than the admitted patients about the charging system. As for the parking fee, 64% of the subjects answered that it is expensive, and 89.5% of the subjects thought imposing of parking fee is irrational. Conclusion : To say as a whole, the basic purpose of the charging system are more or less accepted. However, the management details like parking facilities and payment method are dissatisfactory, so it is necessary to improve the management system. It is also noted that the inpatients showed more negative attitude than the outpatients with the charging system. To secure a more convenient parking, the parking system should be considered in relation to the information service, kind guidance, improve facilities, personnel cooperation, fix outpatient scheduling system, etc.

  • PDF

Security Problem of National Major Facility's Parking Lot and its Improvement Method -Focused on Doonchi(Waterside) Parking Lot of National (국가중요시설의 주차장 보안의 문제점과 개선방안: 국회둔치주차장을 중심으로)

  • Lee, Sang-Hun;Lee, Sang-Yeol
    • Korean Security Journal
    • /
    • no.50
    • /
    • pp.61-87
    • /
    • 2017
  • National Assembly is a constitutional institution that is required to first consult the will of the people and it should do its effort continuously so that security of citizens using parking lot would be enhanced at the same time while improving parking service in order to increase customer satisfaction of the people. Under this recognition, in this study, Doonchi parking lot of National Assembly under consigned management was first reviewed in a perspective of criminal prevention through environmental design(CPTED) and particularly, fence installation and reinforcement work for securing 'territoriality' and operation of all round shooting camera and installation of No-trespassing warning board at entrance were suggested. Second, it was recommended to change independent control system in which CCTV security system of National Assembly Doonchi parking lot is operated separately from National Assembly safety situation room and integrate it with National Assembly safety situation room(revised to double safety system) and performance of CCTV camera was made to be increased to over 2m. In addition, video recording mode was converted to NVR mode for application to IP camera in the future and in order to avoid dead zone of security monitoring area and based on site inspection result, addition 3 places of newly installing CCTV were indicated. Third, it was recommended to introduce parking fare billing and management system through unmanned equipment in parking lot management and operation.(specialized management of professional parking service provider was reviewed). By doing so, risk of cash handling by charging personnel was removed by reducing current 7 working personnel to 3 and particularly, by converting parking lot management mode being operated temporarily from 9 A.M. to 9 P.M. at present to 24 hours operation mode and providing more specialized parking service, citizens visiting National Assembly were provided with convenience and image of National Assembly was also enhanced. This study was carried out in parallel with various literature and case studies, including data from the Office of the Defense Protection in the National Assembly.

  • PDF