• Title/Summary/Keyword: Park construction time

Search Result 1,513, Processing Time 0.033 seconds

Development of Computing Model for the Process and Operation Interval of Reinforced Concrete Work using Web-CYCLONE (철근콘크리트 골조공사의 프로세스 및 공정 공백 산출 시뮬레이션 모형 개발)

  • Park, Sang-Min;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.341-343
    • /
    • 2012
  • This study introduces a method for computation of process and operation gap in the specific construction operation(i.e., RC frame construction applying a block-grouping scheme) using CYCLONE-based simulation modeling and analysis technique. Since uncertainty of construction environment exists, a thoughtful production planning is required to effectively deal with a risk resulting in schedule delay in advance. This study presents the concepts of a time delay occurred in a process level and operation level in a operation model, and a method of measuring gap-times in each level while the simulation progresses. It helps a site manager to decide how many segmentation in a construction block is suitable for eliminating unproductive time-delays under the constrained resources (e.g., laborer, equipment). A case study presents a network model representing a three segmented RC frame work, and result obtained from the simulation experiment.

  • PDF

Automation technology for analyzing 3D point cloud data of construction sites

  • Park, Suyeul;Kim, Younggun;Choi, Yungjun;Kim, Seok
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1100-1105
    • /
    • 2022
  • Denoising, registering, and detecting changes of 3D digital map are generally conducted by skilled technicians, which leads to inefficiency and the intervention of individual judgment. The manual post-processing for analyzing 3D point cloud data of construction sites requires a long time and sufficient resources. This study develops automation technology for analyzing 3D point cloud data for construction sites. Scanned data are automatically denoised, and the denoised data are stored in a specific storage. The stored data set is automatically registrated when the data set to be registrated is prepared. In addition, regions with non-homogeneous densities will be converted into homogeneous data. The change detection function is developed to automatically analyze the degree of terrain change occurred between time series data.

  • PDF

Economic Analsys of Cooling-Heating System Using Ground Source Heat in Multi Family Apartment (공동주택에서 지열 냉난방 시스템 적용시 경제성 분석)

  • Park, Yongboo;Park, Jongbae;Lim, Haesik;Baek, Sungkoon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.3
    • /
    • pp.11-18
    • /
    • 2007
  • This paper studied the economical efficiency of ground source heat pump system under various conditions in apartments which have important effects on the housing market. And this study analysed the initial cost increase, saved managing cost and recovery time of initial cost. Analysis result showed as time of heating-cooling and water heating increases, the amount of saved managing cost increased much than the initial construction cost, so recovery time shortened. And as the net area of apartment increases, the recovery time increased. The study of the relation between the installation type and recovery time of initial construction cost showed when heat-cooling system adapted ground source heat and water heating system adapted waste heat, the initial construction cost was recovered most quickly. When Ground Source Heating system was used for the heating-cooling and water heating system, ground source heating system was used for the heating-cooling and waste heat used for water heating, and ground source heating system was used for the heating-cooling and LNG used for water heating, the construction cost increased 72,000, 66,900 and 62,300 won each per $m^2$ compared to the current system (package air-conditioner, heating and water heating using LNG).

  • PDF

Development of Nexus for BIM and Documents based on Maintenance Process (유지보수공사 프로세스기반 BIM-문서 넥서스 구축)

  • Han, Ji-Ho;Park, Sang-Hun;Yoon, Sun-Jae;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.168-169
    • /
    • 2021
  • Maintenance is carried out over a long period of time, and various documents are utilized in the maintenance work. In maintenance work which is progressed simultaneously in a short period of time, it is important to provide relevant information to the parties in a timely manner. As the types of work increase, manager needs more time and effort to select and utilize the documents. It is necessary to have an information system that supports the person in charge by grasping work procedures for each construction and providing the necessary documents and information for that step. This paper proposes an process based nexus model that can provide necessary documents to the parties to the work steps by linking the maintenance work process and BIM. Through the nexus model presented, manager can efficiently acquire the necessary documents and utilize them for the construction works currently being carried out.

  • PDF

Estimation of Construction Equipment Production Rates based on Simulation;Cycle time of backhoe & loader (시뮬레이션에 의한 건설기계 시공능력 산정;굴삭기&로우더의 사이클타임)

  • Han, Ye-Ryeong;Park, Hee-Sung;Chang, Chul-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.105-111
    • /
    • 2009
  • Construction equipment is a very important factor for successful construction. Also, the cost for construction equipment is a major part of the cost of construction. Therefore, the estimation of the equipment cost is a critical task in construction planning. A formula for production rates shown in 'Standard Unit Labor' has been used to estimate construction equipment capability and cost. Although the performance of the equipment has improved over time, the variables in the formula have not been updated in a timely manner. Therefore, this paper has analyzed the preceding research, and performed several site visits to measure the cycle time of a backhoe and a loader. Construction equipment production rates were calculated with collected cycle times and variables given in 'Standard Unit Labor'. In addition,production rates were estimated considering the circumstances of various sites with the simulation program 'crystal ball.'

Safety Assessment and Behavior Control System using Monitoring of Segmental PSC Box Girder Bridges during Construction (세그멘탈 PSC박스거더교량의 시공간 계측모니터링을 통한 확률적 구조안정성 평가 및 제어 시스템)

  • Shin, Jae-Chul;Cho, Hyo-Nam;Park, Kyung-Hoon;Bae, Yong-Il
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.3
    • /
    • pp.191-201
    • /
    • 2001
  • In spite of the increasing construction of segmental PSC box girder bridges, the techniques associated with real-time monitoring, construction control and safety assessment during construction have been less developed compared with the construction techniques. Thus, the development of an integrated system including real-time measurement and monitoring, control and safety assessment system during construction is necessary fur more safe and precise construction of the bridges. This study presents a prototype integrated monitoring system for preventing abnormal behavior and accidents under construction stages, that consist of behavior control system for precise construction, reliability-based safety assessment system, and structural analysis. Also, a prototype software system is developed on the basis of the proposed model. It is successfully applied to the Sea-Hae Grand Bridge built by FCM. The integrated system model and software system can be utilized for the safe and precise construction of segmental PSC bridges during construction.

  • PDF

Bear Theme Park Design ('곰' 주제공원 조경설계)

  • Woo Jung-Sang
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.33 no.3 s.110
    • /
    • pp.105-113
    • /
    • 2005
  • Human desire is required to be changed variously as time flows. A theme park which is planned to male a good memory including a variety of story, drama, and experience with one of themes is increasingly and currently broaden to be a good economic value of cultural tourism for the local autonomy institution or individual business. The plan for a theme park should be developed to give the tourist satisfaction at studious and ecology educational needs in conformity with our country's distinctive four seasons, its surrounding environment, facilities, and its contents. This design which is called 'Bear theme park' has only one theme focused on a combined effort with a landscape designer and a sculptor. It is estimated that the park must be our country's unique model of a theme park The purpose of this study is to request the designer's direct construction to participate in it by themselves, to solve any problems on the design side, to experience the real construction procedure, and to take the designer's techniques, and skills as soon as the design completed.

The Application of Hydration Heat to Form Removal of Lining Concrete in Tunnel (수화열을 고려한 터널 라이닝 콘크리트 거푸집 탈형)

  • Lee, Jong-Kil;Jung, Hyung-Mok;Kim, Kook-Han;Namgoong, Yeong-Hwan;Park, Chan-Kyu
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.347-350
    • /
    • 2005
  • The strength level for removal of lining concrete in tunnel is increased from 2.94MPa to 4.9MPa in 2004. This result in the increase of concrete curing time, and construction time would be delayed. In this study, in order to improve the efficiency of construction cycle and satisfy the strength criterion, a curing method is adopted, which is considering the hydration heat in the lining concrete member. As a result, it is shown that the concrete curing time for form removal is about 20hrs without the adjustment of concrete mix design. And construction cycle time is not changed compared to that before the change of strength criterion.

  • PDF

DECISION SUPPORT SYSTEM FOR OPTIMAL SELECTION OF HAUL ROUTES BASED ON TIME SLOTS IN EARTHMOVING OPERATION

  • Sang-Hyeok Kang;Kyeong-Geun Baik;Hyun-Gi Baek;Hyeong-Gi Park;Jong-Won Seo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1134-1139
    • /
    • 2009
  • Haul routes for earthmoving operation need to be carefully selected because the decision on the haul routes could make a significant difference in the project's cost and time. This paper proposes a decision support system for improving productivity of earthmoving operation that helps construction managers choose the best haul routes of trucks based on time slots. Also, a methodology for optimal selection of haul routes considering traffic conditions and topographic conditions of the routes is explained. Raster data model is used to find an available shortest path based on cost weighted distance. A system was developed on a geographic information system environment for efficient database management and easy manipulation of graphical data. A real-world case study was conducted to verify the applicability of the proposed system.

  • PDF

Strength Characteristics of Ultra High Performance Concrete at early age

  • Kim, Sung-Wook;Park, Jung-Jun;Ryu, Guem-Sung;Koh, Kyoung-Taek;Hong, Ki-Nam
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.563-564
    • /
    • 2009
  • Ultra-High Performance Concrete (UHPC) compared to normal concrete is exhibiting extremely high strength characteristics with compressive strength and tensile strength reaching 200MPa and 15MPa, respectively. The mechanical characteristics of UHPC can be thus exploited advantageously in the construction of structure through the reduction of the cross-sectional area and fabrication of slim and light-weight of the structural members. In the case where the structural member is made of UHPC, the occurrence of crack can be prevented by releasing the restraint provided by the form in due time. This research performs parametric study of the failure characteristics of concrete such as failure energy and softening curve suggested by the viscous crack model approximating the failure of concrete. The scope of this research contains the results of tests performed to investigate the strength of UHPC during early elapsed time.

  • PDF