• Title/Summary/Keyword: Park System Planning

Search Result 1,384, Processing Time 0.027 seconds

Urban Park and Green Space Planning System according to Newly Enacted Land Planning Related Laws, South Korea

  • Lee Myung-Woo
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.2
    • /
    • pp.25-31
    • /
    • 2004
  • Newly revised Urban Park Act and Land Planning Law are evaluated. Through exploring their functions and limits. Critical guidelines for Green Space Preservation and Planning Law are suggestec. The following is the summary of the findings: 1. New urban and regina! planning system has the foundation for green space plannig expressed as environmental planning, green space planning, landscape planning and park planning. 2. New Urban park act broadens and diversifies the range of urban park and green space(eg, stream and river, road, detention pond etc.) 3. The Urban Natural park items are removed because of long tenn unconstructed urban facilities and the new concept of 'Urban Park Zone' are inserted. And Green Space Preservation District and Urban Greening District's were introduced. And system of Contract of green space utilization and Agreement of Greening were adapted. 4. There exists new emerging needs for establishment of comprehensive green space preservation and planning law. 5. And the green space system can be classified to preservation system, recreation system and scenery system .. 6. The types of proposed green space planning are regional green space plg. urban green space plg, and district unit green space plg.

  • PDF

A Study on the Analysis of the Water Quantity of the Rainwater Detention System based on the Planning Simulation in the Wonheungs' ecological park (모의실험에 의한 청주S(3)택지개발지구 원흥이생태공원일대 우수저류시설의 빗물저류효과 분석 연구)

  • Kim, Gi-Soo;Lee, Tae-Gu;Hwang, Hee-Yeun
    • KIEAE Journal
    • /
    • v.7 no.2
    • /
    • pp.25-30
    • /
    • 2007
  • The purpose of this research is to analyze the water quantity of the rainwater detention system based on the Planning Simulation in Residential Areas. The contents of this research consists of two main parts. The first part is to calculate the supply water quantity of the rainwater detention system and the demand water quantity of the Wonheungs' ecological park. The second part is to analyze the difference between demand and supply of water quantity, based on the Planning Simulation, in the rainwater detention system. This research will contribute to the establishment of the environment-friendly site planning methods which increase the quality of residential environment in apartment housing.

A Study of Integrated Information System an Automated Warehouse System

  • Park, Young H.;Park, Eui H.
    • Journal of Korean Society for Quality Management
    • /
    • v.16 no.2
    • /
    • pp.48-55
    • /
    • 1988
  • There have been several papers to illustrate how an information system is used in an automated warehouse system. These papers, however. do not carefully address the role of warehouse planning/control systems nor do they recognize how to integrate the management planning/control systems, and automated warehouse system. This article addresses such issues and shows how a business computer system can be used to integrate and unify the warehouse planning/control systems and the automated warehouse system into it single and highly productive operating system.

  • PDF

THE RESEARCH ON CONCEPTUAL MODEL OF LNG PLANT PROJECT PLANNING EXPERT SYSTEM

  • Moon-Sun Park;Young-Ai Kim;Seung-Wook Lee;Sung-Ryul Bae;Hyun-Wook Kang;Byoung-Jun Min;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1570-1575
    • /
    • 2009
  • The purpose of this research is to propose the conceptual model of Scenario-based Project Planning Expert System which has not been used in domestic LNG plant industry. This research examines data on the plant project planning expert system of domestic and oversea, analyzes the components of project planning expert systems and benchmark excellent cases. The conceptual model of LNG plant project planning expert system is established through the procedure as has been noted above. The results of this research are as follows: First, this research draws out such components of LNG plant project planning expert system as feasibility, cost control, contract management and risk management. Second, this research proposes the conceptual model of LNG plant project planning expert system which core module is consist of feasibility evaluation, life cycle cost evaluation and decision making. Finally, each module of LNG plant project planning expert system would be integrated into the Scenario-based Project Planning Expert System.

  • PDF

Planting Design of Beijing Olympic Forest Park

  • Yi-Xia, Wu;Jie, Hu;Yan, Zhang
    • Proceedings of the Korean Institute of Landscape Architecture Conference
    • /
    • 2007.10b
    • /
    • pp.38-43
    • /
    • 2007
  • Beijing Olympic Forest Park, which occupies about 680hectares, sustains a healthy ecosystem in Beijing by maintaining regional ecological systems and improving urban ecology.

  • PDF

A Study on Computer Aided Process Planning System for Rotational Parts Considering Shop Floor Status (현장상황을 고려한 회전현상 부품의 공정계획 시스템 구축과 운영에 관한 연구)

  • Jeon, Sung-Bum;Park, Nam-Kyu;Shin, Ki-Tae;Kim, Ki-Dong;Park, Jin-Woo
    • IE interfaces
    • /
    • v.7 no.3
    • /
    • pp.125-135
    • /
    • 1994
  • This thesis reports the development of a Computer-Aided Process Planning system for rotational parts. The developed system ultimately generates process plans for rotational parts through a knowledge-base. The knowledge-base and decision-making algorithms are represented by Pascal computer programming language. We have developed a process planning system which adjusts the sequence of processes by itself to ensure the quality of the parts. This system generates more detailed job sequence and descriptions than other well-known process planning systems. We present realistic and efficient process plans through the integration of process planning and scheduling. This system optimizes flow time of parts by decreasing the number of machine set-ups.

  • PDF

The Best Line Choice for Transmission System Expansion Planning on the Side of the Highest Reliability Level

  • Sungrok Kang;Trungtinh Tran;Park, Jaeseok;Junmin Cha;Park, Daeseok;Roy Billinton
    • KIEE International Transactions on Power Engineering
    • /
    • v.4A no.2
    • /
    • pp.84-90
    • /
    • 2004
  • This paper presents a new method for choosing the best line for transmission system expansion planning considering the highest reliability level of the transmission system. Conventional methodologies for transmission system expansion planning have been mainly focused on economics, which is the minimization of construction costs. However, quantitative evaluation of transmission system reliability is important because successful operation and planning of an electric power system under the deregulated electricity market depends on transmission system reliability management. Therefore, it is expected that the development of methodology for choosing the best lines considering the highest transmission system reliability level while taking into account uncertainties of transmission system equipment is useful for the future. The characteristics and effectiveness of the proposed methodology are illustrated by the case study using a MRBTS.

Development of Distribution Load forecasting Algorithm for Distribution Planning System in KEPCO (한전 배전계획시스템을 위한 부하예측 알고리즘 개발)

  • Kwon Seong Chul;Park Chang Ho;Oh Jae Hyong
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.199-201
    • /
    • 2004
  • KEPCO, has been made a lot of efforts for computerization for distribution planning system since 1980's, And as a results, DISPLAN (Distribution PLANning System) for systematic and effective planning was developed in 2003 and is being used for feeder and substation planning of KEPCO branch office. In this paper the distribution load forecasting algorithm in DISPLAN is represented and the application was showed.

  • PDF

A Task Planning System of a Steward Robot with a State Partitioning Technique (상태 분할 기법을 이용한 집사 로봇의 작업 계획 시스템)

  • Kim, Yong-Hwi;Lee, Hyong-Euk;Kim, Heon-Hui;Park, Kwang-Hyun;Bien, Z. Zenn
    • The Journal of Korea Robotics Society
    • /
    • v.3 no.1
    • /
    • pp.23-32
    • /
    • 2008
  • This paper presents a task planning system for a steward robot, which has been developed as an interactive intermediate agent between an end-user and a complex smart home environment called the ISH (Intelligent Sweet Home) at KAIST (Korea Advanced Institute of Science and Technology). The ISH is a large-scale robotic environment with various assistive robots and home appliances for independent living of the elderly and the people with disabilities. In particular, as an approach for achieving human-friendly human-robot interaction, we aim at 'simplification of task commands' by the user. In this sense, a task planning system has been proposed to generate a sequence of actions effectively for coordinating subtasks of the target subsystems from the given high-level task command. Basically, the task planning is performed under the framework of STRIPS (Stanford Research Institute Problem Solver) representation and the split planning method. In addition, we applied a state-partitioning technique to the backward split planning method to reduce computational time. By analyzing the obtained graph, the planning system decomposes an original planning problem into several independent sub-problems, and then, the planning system generates a proper sequence of actions. To show the effectiveness of the proposed system, we deal with a scenario of a planning problem in the ISH.

  • PDF

Long-term Power System Planning by using Mixed-Integer Programming (선형계획법을 활용한 장기 전력계통 계획수립 기법개발)

  • Ryu, Heon-Su;Cho, Kang-Wook;Lee, Jo-Lyeon;Kim, Tae-Hoon;Kim, Jin-Yi;Park, Marn-Geun
    • Proceedings of the KIEE Conference
    • /
    • 2007.11b
    • /
    • pp.100-102
    • /
    • 2007
  • 본 논문에서는 혼합정수 선형계획 법을 이용하여 장기 전력계통 계획수립시 최적의 설비를 투자할 수 있는 기법을 제안하였다. 발전설비와 송변전설비는 하나의 망으로 연결되어 상호 보완적 영향을 주기 때문에 계통계획시 두 설비를 동시에 평가하는 것이 무엇보다 중요하다. 또한 계획기간 전체에 대해 투자비를 고려하여 비용을 최소화해야 한다. 이를 위해 선형계획법을 계통계획에 도입하여 최소비용의 투자비를 가지고 공급 신뢰도 기준를 만족할 수 있는 최적 장기 전력계통 계획 수립기법을 개발하였다. 개발된 기법을 Garver 6모선 계통 및 제3차 전력수급기본계획에 대해 모의하여 결과의 타당성을 검증하였다.

  • PDF