• Title/Summary/Keyword: Package company

Search Result 177, Processing Time 0.023 seconds

Application of the Axiomatic Design Methodology to the Design of PBGA Package with Polyimide Coating Layer

  • Yang, Ji-Hyuck;Lee, Kang-Yong;Dong, C. Y.
    • Journal of Mechanical Science and Technology
    • /
    • v.18 no.9
    • /
    • pp.1572-1581
    • /
    • 2004
  • The purposes of the paper are to apply the axiomatic design methodology to the design of PBGA package with polyimide coating under hygrothermal loading in the IR soldering process and to suggest more reliable design conditions by stress analysis. The analysis model is a 256-pin perimeter Plastic Ball Grid Array (PBGA) package with the polyimide coating surrounding chip and above surface of BT-substrate. The polyimide coating is suggested to depress the maximum stresses occurred on the stress concentration positions. The axiomatic design methodology is proved to be useful to find the more reliable design conditions for PBGA package. Finally, the optimal values of design variables to depress the stress in the PBGA package are obtained.

Promoting Policy to Involve Plant EPC Companies for Package Deal to Acquisite Overseas Energy Resources (패키지 딜 방식의 해외 에너지자원 획득에 관한 플랜트EPC기업참여 촉진방안연구)

  • Kim, Young-Kyun;Moon, Sun-Ae;Moon, Seung-Jae;Lee, Jae-Heon;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.2
    • /
    • pp.50-55
    • /
    • 2009
  • Promoting policy to involve plant EPC companies for package deal has been studied to acquire overseas energy resources. The effectiveness of the package deal with the plant EPC companies has not been successful because the participation of the plant EPC companies is very rare. It is difficult for the plant EPC companies to join the package deal due to the lack of the fully responsible organization to support the plant EPC companies participating in a package deal. The followings are suggested as the ways to promote the participation of the plant EPC companies for package deal in this study; 1) financial support of the government for plant EPC companies 2) political support of the government for plant EPC companies 3) specialization of the advanced countries for public-private cooperation.

  • PDF

Definition of an Integrated Contract Package for Application of Multi-Trade Subcontract System (다공종 통합발주방식 적용을 위한 통합공종 규명에 관한 연구)

  • Song Hyung-Suk;Kim Kyoon-Tai;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.385-388
    • /
    • 2002
  • The construction industry has complicated production processes with diverse disciplines and subcontractors, which is the major cause of lowered productivity. To solve this problem, multi-trade subcontract system is recently suggested. Some general construction companies have applied this method to some sections of work process. However, this is in the early stage of application. The purpose of this study is to define an integrated contract package for improving both contractor and subcontractor efficiency. First, this study recognizes construction company to need of multi-trade subcontract system. Finally, it suggests feasible activities which can be useful for a construction company to apply to this subcontract system.

  • PDF

Application of ERP and MES in Case of Automobile Manufacturing Company (자동차부품 제조업체의 ERP 및 MES의 적용에 관한 사례 연구)

  • Kim, Ki-Dong;Choi, Jang-Ho;Kim, Dae-Young
    • Journal of Industrial Technology
    • /
    • v.22 no.B
    • /
    • pp.51-60
    • /
    • 2002
  • Currently, many companies are trying to be more competitive by implementing the most appropriate software package called ERP (Enterprise Resource Planning). ERP can support the company's business process. A manufacturing execution system (MES) is an industrial software system, as well as a manufacturing management function in make-to-order and make-to-stock manufacturing environments. This paper presents an architecture of MES. This study develops MES to identify the functional requirements of loading & scheduling in the automobile industry. This study shows the effectiveness of the proposed MES, how to develop MES and interface with ERP package.

  • PDF

A Research on Stray-Current Corrosion Mechanism of High Voltage Cable Connector on Electrification Vehicles

  • Lee, Hwi Yong;Ahn, Seung Ho;Im, Hyun Taek
    • Corrosion Science and Technology
    • /
    • v.18 no.4
    • /
    • pp.117-120
    • /
    • 2019
  • Considering the tendency of development of electrification vehicles, development and verification of new evaluation technology is needed because of new technology applications. Recently, as the battery package is set outdoors of an electric vehicle, such vehicles are exposed to corrosive environments. Among major components connected to the battery package, rust prevention of high-voltage cables and connectors is considered the most important issue. For example, if corrosion of high voltage cable connectors occurs, the corrosion durability assessment of using an electric vehicle will be different from general environmental corrosion phenomena. The purpose of this study is to investigate the corrosion mechanism of high voltage cable connectors of an electric vehicle under various driving environments (road surface vibration, corrosion environment, current conduction by stray current, etc.) and develop an optimal rust prevention solution. To improve our parts test method, we have proposed a realistic test method to reproduce actual electric vehicle corrosion issues based on the principle test.

Image Processing Software Package(IMAPRO) for IBM PC VGA (IBM PC VGA용 화상처리 소프트웨어(IMAPRO))

  • 徐在榮;智光薰
    • Korean Journal of Remote Sensing
    • /
    • v.8 no.1
    • /
    • pp.59-69
    • /
    • 1992
  • The IMAPRO sotfware package was mainly focused to provide an algorithm which is capable of displaying various color composite images on IBM PC, VGA(Video Graphic Array) card with no special hardware. It displays the false color images using a low-cost eight-bit place refresh buffer. This produces similar quality to the one obtained from image board with three eight-bit plane. Also, it provides user friendly menu driven method for the user who are not familier with technical knowladge of image processing. It may prove useful for universities, institute and private company where expensive hardware is not available.

Promoting Policy to Involve Plant EPC Companies for Package Deal to Acquisite Overseas Energy Resources (패키지 딜 방식의 해외 에너지자원 획득에 관한 플랜트EPC기업참여 촉진방안연구)

  • Kim, Young-Kyun;Hur, Jin-Huek;Moon, Seung-Jae;Lee, Jae-Heon;Yoo, Ho-Seon
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.338-343
    • /
    • 2009
  • Promoting policy to involve plant EPC companies for package deal has been studied to acquisite overseas energy resources. The effectiveness of the package deal with the plant EPC companies has not been successful because participation of the plant EPC companies is very low. It is difficult for the plant EPC companies to join the packaged deal due to the lack of the whole responsibility organization to support that plant EPC companies participate in package deal. The followings are suggested as the ways to promote the participation of the plant EPC companies for package deal in this study. 1) financial and policy support of governmen 2) specialization of the advanced countries.

  • PDF

Public-Private Cooperation in the Package Deal for Overseas Energy Resources Acquisition (에너지자원획득을 위한 패키지 딜에서의 민관협력방안연구)

  • Park, Dae-Young;Hur, Jin-Huek;Lee, Tae-Gu;Moon, Seung-Jae;Lee, Jae-Heon;Yoo, Ho-Seon
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.1123-1127
    • /
    • 2008
  • The public-private cooperation in package deal has been studied for the overseas energy resources acquisition. The effectiveness of the package deal has not been successful because the deal has led by the government organizations. It is difficult for the plant EPC companies to join the packaged deal due to the lack of the whole responsibility organization to support the participation of the package deal. The followings are suggested as the ways to strengthen of the public-private cooperation in this study. 1) the relevant public enterprise privatization 2) establishment of the joint model for leading the plant EPC companies to the package deal 3) establishment of the whole responsibility organization for the public-private cooperation.

  • PDF

Public-Private Cooperation in the Package Deal for Overseas Energy Resources Acquisition (에너지자원획득을 위한 패키지딜 적용시 민관협력 강화 방안)

  • Park, Dae-Young;Hur, Jin-Huek;Lee, Tae-Gu;Moon, Seung-Jae;Lee, Jae-Heon;Yoo, Hoseon
    • Plant Journal
    • /
    • v.4 no.2
    • /
    • pp.73-78
    • /
    • 2008
  • The public-private cooperation in package deal has been studied for the overseas energy resources acquisition. The effectiveness of the package deal has not been successful because the deal has led by the government organizations. It is difficult for the plant EPC companies to join the packaged deal due to the lack of the whole responsibility organization to support the participation of the package deal. The followings are suggested as the ways to strengthen of the public-private cooperation in this study. 1) the relevant public enterprise privatization 2) establishment of the joint model for leading the plant EPC companies to the package deal 3) establishment of the whole responsibility organization for the public-private cooperation.

  • PDF

A Study on Throughput Increase in Semiconductor Package Process of K Manufacturing Company Using a Simulation Model (시뮬레이션 모델을 이용한 K회사 반도체 패키지 공정의 생산량 증가를 위한 연구)

  • Chai, Jong-In;Park, Yang-Byung
    • Journal of the Korea Society for Simulation
    • /
    • v.19 no.1
    • /
    • pp.1-11
    • /
    • 2010
  • K company produces semiconductor package products under the make-to-order policy to supply for domestic and foreign semiconductor manufacturing companies. Its production process is a machine-paced assembly line type, which consists of die sawing, assembly, and test. This paper suggests three plans to increase process throughput based on the process analysis of K company and evaluates them via a simulation model using a real data collected. The three plans are line balancing by adding machines to the bottleneck process, product group scheduling, and reallocation of the operators in non-bottleneck processes. The evaluation result shows the highest daily throughput increase of 17.3% with an effect of 2.8% reduction of due date violation when the three plans are applied together. Payback period for the mixed application of the three plans is obtained as 1.37 years.