Browse > Article
http://dx.doi.org/10.9709/JKSS.2010.19.1.001

A Study on Throughput Increase in Semiconductor Package Process of K Manufacturing Company Using a Simulation Model  

Chai, Jong-In (경희대학교 산업경영공학과)
Park, Yang-Byung (경희대학교 산업경영공학과)
Abstract
K company produces semiconductor package products under the make-to-order policy to supply for domestic and foreign semiconductor manufacturing companies. Its production process is a machine-paced assembly line type, which consists of die sawing, assembly, and test. This paper suggests three plans to increase process throughput based on the process analysis of K company and evaluates them via a simulation model using a real data collected. The three plans are line balancing by adding machines to the bottleneck process, product group scheduling, and reallocation of the operators in non-bottleneck processes. The evaluation result shows the highest daily throughput increase of 17.3% with an effect of 2.8% reduction of due date violation when the three plans are applied together. Payback period for the mixed application of the three plans is obtained as 1.37 years.
Keywords
Simulation model; Semiconductor package process; Throughput increase; Line balancing; Group scheduling; Case study;
Citations & Related Records
연도 인용수 순위
  • Reference
1 이영훈, "반도체산업의 생산관리 연구의 동향," 한국생산관리학회지, 11(3), pp. 85-110, 2001년.
2 한상찬, 생산계획 및 통제론, 청문각, 2007년
3 Arnold, J.R. and Chapman, S.N., Introduction to Material Management, 4th ed, Prentice Hall, 2001.
4 Zhang, H., Jiang, Z., and Guo, C., "An Optimized Dynamic Bottleneck Dispatching Policy for Semiconductor Wafer Fabrication," International Journal of Production Research, iFirst(online publication), pp. 1-11, March 2008.
5 Yin, X., Chua, T., Wang, F., Liu, M., Cai, T., Yan, W., Chong, C., Zhu, J., and Lam, M., "A Rule-based Heuristic Finite Capacity Scheduling System for Semiconductor Backend Assembly," International Journal of Computer Integrated Manufacturing, vol.17, no.8, pp. 733-749, 2004.   DOI   ScienceOn
6 Knutson, K., Jempf, K., Flwler, J., and Carlyle, M., "Lot-to-order Matching for a Semiconductor Assembly and Test Facility," IIE Transactions, vol.31, no.11, pp. 1103-1111, 1999.
7 Brown, S., Domaschke, J. and Leibl, F., "No Cost Applications for Assembly Cycle Time Reductions," Proc. of the 1999 International Conference on Semiconductor Manufacturing Operational Modeling and Simulation, pp. 62-66, 1999.
8 Gupta, A.K. and Sivakumar, A.I., "Controlling Delivery Performance in Semiconductor Manufacturing Using Look Ahead Batching," International Journal of Production Research, vol. 45, no. 3, pp. 591-613, 2007.   DOI   ScienceOn
9 Hitomi, K., "A Comment on Group Scheduling in Flexible Flowshop," International Journal of Production Economics, vol.105, no.1, pp. 297-306, 2007.   DOI   ScienceOn
10 Kelton, W., Sadowski, R., and Sturrock, D., Simulation with Arena, 4th ed., McGraw-Hill, New York, USA, 2007.
11 Wu, M-C and Hung, T-U, "A Hit-rate Based Dispatching Rule for Semiconductor Manufacturing," International Journal of Industrial Engineering, vol.15, no.1, pp. 73-82, 2008.