• Title/Summary/Keyword: PSM System

Search Result 96, Processing Time 0.026 seconds

A Study on the Improvement of Safety Management in the Workplaces Subject to Process Safety Management (PSM) (공정안전관리(PSM) 대상 사업장의 안전관리 개선 연구)

  • Jong-hun Park
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.3
    • /
    • pp.490-497
    • /
    • 2023
  • Purpose: Since the 1990s, Korea has been making various efforts to prevent serious industrial accidents, such as implementing a hazardous risk prevention plan and implementing a process safety management system, but a series of recent major industrial accidents have shown its limitations. Therefore, this study aims to present measures to improve safety management of PSM target workplaces. Method: Investigate previous studies and cases on improving safety management at workplaces subject to PSM, seek ways to improve safety management at workplaces subject to PSM based on existing safety management, and evaluate safety management system one of the causes of accidents. Therefore, a safety education program is established to increase employees' safety awareness and understanding, and to improve the safety level. Result: Measures such as establishing an organizational culture to improve safety management of PSM target workplaces, responding to disasters, systematic safety management, replacing and strengthening old facilities, and strengthening management's firm commitment to safety were presented. Conclusion: Through this study, it is meaningful to present a systematic plan to secure safety to reduce precious lives and damage, and it is expected to be useful in considering the direction of PSM improvement for each workplace.

A Comparative Study of the Productivity through the Cost of the Precast Span Method(PSM) and Movable Scaffolding System(MSS) -By the Central Example of Company H on the Korea Train Express (KTX) (공사비 비교를 통한 Precast Span Method(PSM) 공법과 Movable Scaffolding System(MSS) 공법의 생산성 연구 -경부고속철도 H사의 사례를 중심으로)

  • Lee Tai Sik;Lee Sung Hyun;Kim Gil Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.535-540
    • /
    • 2001
  • In the early construction phase of the Korea Train Express (KTX), the Movable Scaffolding System (MSS) for the top structure of the bridge was the predominant construction method. But the method had to be changed due to arising problems and an alternative method had to be found. Company H that participated in Korea Train Express construction project achieved excellent results of performance through the introduction of the Precast Span Method (PSM), which has been previously successfully employed in foreign express train projects. This study intends to verify the superior performance of PSM over MSS in the KTX construction process by conducting a comparative analysis on PMS and MSS based on the field experience of company H. This study will not only help to understand PSM, which is expected to expand its future scope of application, but also contribute to solve the problems of PSM that occurred during the construction phase.

  • PDF

Improvement Plan of Implementing Condition Assessment in Process Safety Management (PSM) System (공정안전관리(PSM)제도의 이행상태평가 개선방안)

  • Lee, Joo Yeob;Lee, Keun Won;Ahn, Byung Joon;Kim, Tae-Ok
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.4
    • /
    • pp.27-34
    • /
    • 2016
  • Process Safety Management (PSM) system was introduced since 1996 and it makes voluntarily organizing and managing chemical accident prevention system by company itself that contributes to reduce the chemical accidents. However, large or small scaled chemical accidents had occurred frequently in these days. This trend is brought up the necessity to analyze and improve PSM system. In this study, it was conducted by the questionnaire survey and workshop for prevention of major industrial accidents in PSM sites in order to collect extensive opinions from all walks of life and identify overall operation condition. It was proposed to establish improvement plan of implementing condition assessment in PSM system. By results of the study, company's voluntary safety management will be induced by improved PSM system and management plan and it expects to prevent the major industrial accidents.

A Study on the Efficient Operation of Self-audit in Large-scale PSM Workplace (대규모 PSM 사업장의 자체감사에 대한 효율적 운영 연구)

  • Min, Se-Hong;Kim, Seok-Won
    • Fire Science and Engineering
    • /
    • v.27 no.6
    • /
    • pp.115-121
    • /
    • 2013
  • Industrial facilities are becoming bigger and more up to date, And a kind of the hazardous material used in the industrial filed is diversified. Therefore, serious accidents such as leakage of toxic materials, fire and explosion, is continuously occurred. There is Process Safety Management (PSM) system of the several preventive systems, but it is supposed to be a limitation to ensure safety or huge PSM industrial sites where have potential to catastrophically invisible and unexpected risks because it is still being managed by instruction and inspection of authority having jurisdiction other than self-regulating management differing from the primarily aim of PSM system. To verify safety management system of work-place, supplementation of existing system is urgently required. In this study, it suggests that PSM self-audit be emphasized significantly analyzing problems of the current systems for enhancing self-audit be emphasized significantly analyzing problems of the current systems for enhancing self-control safety through efficient self-audit management and improving the existing system and improving the existing as verifying the system there of, as well as studying methods which can support institutionally.

A Study on the Use of the e-PSM system and Improvement of Fulfillment Rate (e-PSM 시스템의 사용실태와 이행률 향상방안)

  • An, Yun-Ji;Cho, Song-Hee;Hyun, Yu-Jin;Shin, Ye-Jin;Gal, Won-Mo
    • Journal of the Korean Institute of Plant Engineering
    • /
    • v.23 no.4
    • /
    • pp.85-92
    • /
    • 2018
  • With the increasing use of chemicals in domestic businesses, the possibility of fire explosion and poisonous material leakage accidents is also increasing. Accordingly, the Korea Occupational Safety and Health Agency(KOSHA) has implemented the process safety management (PSM) system for a long time. However, process safety report submission has been providing and operating e-PSM since 2016 to address these problems as it is difficult to increase budget spending due to the need for professional capabilities and commissioning the report to consulting institutions. Therefore, this study conducts questionnaires on whether e-PSM system that is well utilized in the field, focusing on existing PSM business sites. In order to find out the activation method that can solve the deficiency factors by analyzing various inconveniences and problems accurately, we propose three improvement methods as educational aspect, promotional direction of e-PSM system, and institutional aspect.

Development of Business Model for Partnership Support Management (PSM) in Private Infrastructure Projects (민간투자사업 파트너쉽지원관리(PSM) 업무모델 개발)

  • Jung, Pyung Ki;Baek, Hyeon Gi;Seo, Jong Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.1D
    • /
    • pp.99-109
    • /
    • 2011
  • In order to maintain construction industry and to improve efficiency, the Korean government legislated private investment system. Private sector takes advantages by adopting CM (Construction Management) project system, however, public sector has relatively less capability and experience than private sector. In this paper, PSM (Partnership Support Management) is addressed in order to actively strengthen the project capabilities for public sector. PSM maintains existing CM project system because it is a concept of expended business model of CM. PSM needed to categorize the private participated project into 5 phases; project development phase, project announcement phase, project evaluation phase, project agreement phase and agreement changing phase. PSM business structure and business process considering stakeholder's interrelationship and participation are suggested in this research. Suggested PSM business model may not only increase a comprehensive understanding of government and project capability, but also may reduce work load and responsibilities for project momentum of private participation in infrastructure.

A Study on Reforming Threshold Quantities of Toxic Substances in Process Safety Management (PSM 제출대상 독성물질의 규정량 합리화에 대한 연구)

  • Lee, Joo Yeob;Lee, Keun Won;Kim, Tae-Ok
    • Journal of the Korean Institute of Gas
    • /
    • v.21 no.4
    • /
    • pp.6-15
    • /
    • 2017
  • Process safety management(PSM) system was implemented in Korea since 1996. It helps reduce and prevent the occurrence of chemical accidents. There has been no review on the feasibility of the threshold quantities of the existing 21 species and the newly added toxic substances such as hydrogen bromide in the PSM system. The threshold quantities of the target toxic substances(25 species) of PSM were compared with domestic and foreign PSM systems similar to those of Korea. Also, we proposed the toxic harmfulness and hazard equation consisted of inhalation toxicity, NFPA index and others. According to this equation, high risk, medium risk and low risk are classified and reflected in the adjustment of threshold quantities. From the above research, It is expected to help to reduce confusion and burden of the workplaces due to the difference from other PSM system and improve in the threshold quantities.

A Study on the Application to PSM (Process Safety Management) Policy in the Construction (건설현장의 PSM(Process Safety Management) 제도 적용에 관한 연구)

  • 양광모;전현정
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.4
    • /
    • pp.21-30
    • /
    • 2003
  • In this paper, we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM method. The reason why PSM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries,' thereby strengthening there competitive edges. Boost of safety control system by PSM method will make an enormous contribution to preventing construction accidents on the site by establishing and securing an autonomous safety control system.

A Study on Improvement of Process Safety Management System in Threshold Quantity Site (규정수량사업장의 공정안전관리제도 개선)

  • Jung, Jong-Soo;Kim, Yeon-Hee;Kim, Dong-Jin;Yi, Yun-Hyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.5
    • /
    • pp.1289-1299
    • /
    • 2007
  • As higher on the industrialization of chemical factories in Korea, it shows a tendency that safety accident happens more times and is bigger on its size. For preventing from and decreasing such accident, PSM(Process Safety Management) system has used in chemical factories. Though it is recognized that PSM is sutable and effective for only a intensive system technically, it could be difficult to apply to all of factories, actually. This study was proceeded for investigating the effect and problems on the application and performanance of PSM into the threshold quantity site and suggesting how fur improvement. The results are as followed; PSM system was not used effectively in the threshold quantity site of medium and small-sized enterprises because of the shortage of experts and the decrease of interest as a deregulation. As the effective performanace of PSM for preventing from industrial accident in threshold quantity site and for sattling as self-system easily, it was concluded to get an active support from the concerned government. First of all, new progrems to improve PSM should be developed continually and the progrems should be educated extensively.

  • PDF

A Study On Development of Safety Inspection Evaluation Method in the Construction Using PSM Method (PSM 제도를 활용한 건설업 안전점검 평가방법 개발에 관한 연구)

  • 양광모;전현정;강경식
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.3
    • /
    • pp.24-30
    • /
    • 2003
  • As domestic buildings have been large-scaled, diversified and high-rise, there have been a consistent demand for design, development of construction technology and accident prevention activity as well as quality enhancement. In spite of governmental and related institutions' efforts for reducing national losses which come from numerous accidents, there have been endless small and large accidents on the construction site and thus, it is urgent to conduct empirical researches in this area. Currently safety supervision system in construction industry has enforced harm and danger prevention planning system, however it merely stick to other existing materials. In addition, it is difficult to put it into practice in that it requires bearing too much burden to draw out the planning itself in a case of large construction work. Consequently in this paper we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM(Process Safety Management) method using AHP(Analytic Hierarchy Process) and to development of PSM evaluation method in the construction. The reason why PSM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries, thereby strengthening their competitive edges. Boost of safety control system by PSM method could make an enormous contribution to preventing construction accidents on the site by establishing and securing an autonomous safety control system.