Purpose: Since the 1990s, Korea has been making various efforts to prevent serious industrial accidents, such as implementing a hazardous risk prevention plan and implementing a process safety management system, but a series of recent major industrial accidents have shown its limitations. Therefore, this study aims to present measures to improve safety management of PSM target workplaces. Method: Investigate previous studies and cases on improving safety management at workplaces subject to PSM, seek ways to improve safety management at workplaces subject to PSM based on existing safety management, and evaluate safety management system one of the causes of accidents. Therefore, a safety education program is established to increase employees' safety awareness and understanding, and to improve the safety level. Result: Measures such as establishing an organizational culture to improve safety management of PSM target workplaces, responding to disasters, systematic safety management, replacing and strengthening old facilities, and strengthening management's firm commitment to safety were presented. Conclusion: Through this study, it is meaningful to present a systematic plan to secure safety to reduce precious lives and damage, and it is expected to be useful in considering the direction of PSM improvement for each workplace.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.535-540
/
2001
In the early construction phase of the Korea Train Express (KTX), the Movable Scaffolding System (MSS) for the top structure of the bridge was the predominant construction method. But the method had to be changed due to arising problems and an alternative method had to be found. Company H that participated in Korea Train Express construction project achieved excellent results of performance through the introduction of the Precast Span Method (PSM), which has been previously successfully employed in foreign express train projects. This study intends to verify the superior performance of PSM over MSS in the KTX construction process by conducting a comparative analysis on PMS and MSS based on the field experience of company H. This study will not only help to understand PSM, which is expected to expand its future scope of application, but also contribute to solve the problems of PSM that occurred during the construction phase.
Process Safety Management (PSM) system was introduced since 1996 and it makes voluntarily organizing and managing chemical accident prevention system by company itself that contributes to reduce the chemical accidents. However, large or small scaled chemical accidents had occurred frequently in these days. This trend is brought up the necessity to analyze and improve PSM system. In this study, it was conducted by the questionnaire survey and workshop for prevention of major industrial accidents in PSM sites in order to collect extensive opinions from all walks of life and identify overall operation condition. It was proposed to establish improvement plan of implementing condition assessment in PSM system. By results of the study, company's voluntary safety management will be induced by improved PSM system and management plan and it expects to prevent the major industrial accidents.
Industrial facilities are becoming bigger and more up to date, And a kind of the hazardous material used in the industrial filed is diversified. Therefore, serious accidents such as leakage of toxic materials, fire and explosion, is continuously occurred. There is Process Safety Management (PSM) system of the several preventive systems, but it is supposed to be a limitation to ensure safety or huge PSM industrial sites where have potential to catastrophically invisible and unexpected risks because it is still being managed by instruction and inspection of authority having jurisdiction other than self-regulating management differing from the primarily aim of PSM system. To verify safety management system of work-place, supplementation of existing system is urgently required. In this study, it suggests that PSM self-audit be emphasized significantly analyzing problems of the current systems for enhancing self-audit be emphasized significantly analyzing problems of the current systems for enhancing self-control safety through efficient self-audit management and improving the existing system and improving the existing as verifying the system there of, as well as studying methods which can support institutionally.
An, Yun-Ji;Cho, Song-Hee;Hyun, Yu-Jin;Shin, Ye-Jin;Gal, Won-Mo
Journal of the Korean Institute of Plant Engineering
/
v.23
no.4
/
pp.85-92
/
2018
With the increasing use of chemicals in domestic businesses, the possibility of fire explosion and poisonous material leakage accidents is also increasing. Accordingly, the Korea Occupational Safety and Health Agency(KOSHA) has implemented the process safety management (PSM) system for a long time. However, process safety report submission has been providing and operating e-PSM since 2016 to address these problems as it is difficult to increase budget spending due to the need for professional capabilities and commissioning the report to consulting institutions. Therefore, this study conducts questionnaires on whether e-PSM system that is well utilized in the field, focusing on existing PSM business sites. In order to find out the activation method that can solve the deficiency factors by analyzing various inconveniences and problems accurately, we propose three improvement methods as educational aspect, promotional direction of e-PSM system, and institutional aspect.
KSCE Journal of Civil and Environmental Engineering Research
/
v.31
no.1D
/
pp.99-109
/
2011
In order to maintain construction industry and to improve efficiency, the Korean government legislated private investment system. Private sector takes advantages by adopting CM (Construction Management) project system, however, public sector has relatively less capability and experience than private sector. In this paper, PSM (Partnership Support Management) is addressed in order to actively strengthen the project capabilities for public sector. PSM maintains existing CM project system because it is a concept of expended business model of CM. PSM needed to categorize the private participated project into 5 phases; project development phase, project announcement phase, project evaluation phase, project agreement phase and agreement changing phase. PSM business structure and business process considering stakeholder's interrelationship and participation are suggested in this research. Suggested PSM business model may not only increase a comprehensive understanding of government and project capability, but also may reduce work load and responsibilities for project momentum of private participation in infrastructure.
Process safety management(PSM) system was implemented in Korea since 1996. It helps reduce and prevent the occurrence of chemical accidents. There has been no review on the feasibility of the threshold quantities of the existing 21 species and the newly added toxic substances such as hydrogen bromide in the PSM system. The threshold quantities of the target toxic substances(25 species) of PSM were compared with domestic and foreign PSM systems similar to those of Korea. Also, we proposed the toxic harmfulness and hazard equation consisted of inhalation toxicity, NFPA index and others. According to this equation, high risk, medium risk and low risk are classified and reflected in the adjustment of threshold quantities. From the above research, It is expected to help to reduce confusion and burden of the workplaces due to the difference from other PSM system and improve in the threshold quantities.
In this paper, we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM method. The reason why PSM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries,' thereby strengthening there competitive edges. Boost of safety control system by PSM method will make an enormous contribution to preventing construction accidents on the site by establishing and securing an autonomous safety control system.
Journal of the Korea Academia-Industrial cooperation Society
/
v.8
no.5
/
pp.1289-1299
/
2007
As higher on the industrialization of chemical factories in Korea, it shows a tendency that safety accident happens more times and is bigger on its size. For preventing from and decreasing such accident, PSM(Process Safety Management) system has used in chemical factories. Though it is recognized that PSM is sutable and effective for only a intensive system technically, it could be difficult to apply to all of factories, actually. This study was proceeded for investigating the effect and problems on the application and performanance of PSM into the threshold quantity site and suggesting how fur improvement. The results are as followed; PSM system was not used effectively in the threshold quantity site of medium and small-sized enterprises because of the shortage of experts and the decrease of interest as a deregulation. As the effective performanace of PSM for preventing from industrial accident in threshold quantity site and for sattling as self-system easily, it was concluded to get an active support from the concerned government. First of all, new progrems to improve PSM should be developed continually and the progrems should be educated extensively.
Journal of Korean Society of Industrial and Systems Engineering
/
v.26
no.3
/
pp.24-30
/
2003
As domestic buildings have been large-scaled, diversified and high-rise, there have been a consistent demand for design, development of construction technology and accident prevention activity as well as quality enhancement. In spite of governmental and related institutions' efforts for reducing national losses which come from numerous accidents, there have been endless small and large accidents on the construction site and thus, it is urgent to conduct empirical researches in this area. Currently safety supervision system in construction industry has enforced harm and danger prevention planning system, however it merely stick to other existing materials. In addition, it is difficult to put it into practice in that it requires bearing too much burden to draw out the planning itself in a case of large construction work. Consequently in this paper we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM(Process Safety Management) method using AHP(Analytic Hierarchy Process) and to development of PSM evaluation method in the construction. The reason why PSM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries, thereby strengthening their competitive edges. Boost of safety control system by PSM method could make an enormous contribution to preventing construction accidents on the site by establishing and securing an autonomous safety control system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.