Optimal Design of PSC-I Girder Bridge Considering Life Cycle Cost (생애주기비용을 고려한 PSC-I형 교량의 최적설계)

  • Park, Jang-Ho;Shin, Yung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.5
    • /
    • pp.48-56
    • /
    • 2009
  • This paper presents the procedure for the optimal design of a PSC-I girder bridge considering life cycle cost (LCC). The load carrying capacity curves for the concrete deck, PSC-I girder and $\pi$-type pier were derived and used for the estimate of service lives. Total life cycle cost for the service life was calculated as sum of initial cost, damage cost, maintenance cost, repair and rehabilitation cost, user cost, and disposal cost. The advanced First Order Second Moment method was used to estimate the damage cost. The optimization method was applied to the design of PSC-I girder bridge. The objective function was set to the annual cost, which is defined by dividing the total life cycle cost by the service life, and constraints were formulated on the basis of Korean Standards. The optimal design was performed for various service lives and the effects of design factors were investigated.

Estimation of Fatigue safety for PSC Bridge Decks (PSC 바닥판의 피로 안전성 평가)

  • 김영진;이정우;주봉철;김병석;박성용;이필구
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.525-530
    • /
    • 2002
  • This study is peformed to propose the slab deck for the composite bridge with two girders. Considering the characteristics of the long span and the construction conditions in korea, a cast-in-place PSC deck was proposed for that bridge. To examine structural behaviors and safety of the proposed PSC deck, two real scale partitions of deck(12m$\times$3.2m) were tested under the fatigue loading. In the test, the failure mode and behaviors of each specimen, and the ultimate load carrying capacity of the two-girder-bridge deck were identified. Generally, the failure of concrete bridge deck is caused by the local punching shear stress resulting from the moving wheel load. Even though its ultimate flexural capacity is sufficiently larger than the demand, it could be failed by the punching shear fatigue. Therefore, the fatigue safety of the proposed PSC deck should be checked.

  • PDF

3-D Behavior and Strut-and-Tie Model Analysis of Diaphragm in PSC Train Bridge (PSC철도교량 격벽부의 3차원 거동 및 스트럿-타이 모델 해석)

  • 송하원;변근주;김형운;김영훈
    • Proceedings of the KSR Conference
    • /
    • 1998.05a
    • /
    • pp.564-571
    • /
    • 1998
  • The function of diaphragms at abutments and piers of prestressed concrete (PSC) box girder train bridge is to transfer forces from the superstructure onto bearings or column and to stiffen the superstructure cross-section against in-plane deformation. Due to large stress disturbance at diaphragm, the design for the diaphragm using conventional design method is relatively irrational than designs for other structual members. And, due to contribution to boundary condition of deck slab by the diaphragm, the behavior of deck slab near the diaphragm is different from behavior of the deck slab obtained from two dimensional analysis of the bridge, which is basis far the design of deck slab. In this paper, three dimensional behavior of deck slab near diaphragm of PSC box girder train bridge constructed by the precast span method are analyzed by using three dimensional finite element modeling. Then, strut-and-tie model is applied to design the diaphragm of PSC box girder train bridge. The modeling techniques in this paper can be applied effectively to examine the causes of cracks at deck slab near diaphragm and to design diaphragm rationally.

  • PDF

A Study on the Characteristics of Dynamic Behaviors for Continuous PSC Girder Bridges with Integral Pier Cap (교각일체형 연속 PSC 거더교의 동적거동 특성 연구)

  • Jeong, Young Do;Koo, Min Se;Yi, Seong Tae;Kim, Hee Sung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.1
    • /
    • pp.94-105
    • /
    • 2013
  • Recently, the construction industry has been changed in such a way that the cost for bridge construction should be optimized or reduced. Therefore, bridges are required be cost-effective in terms of initial construction as well as in the maintenance during service stage. In order to reduce the cost for bridge construction, the Rahmen typed structure, in which the bridge components from superstructure to substructure are integral, has many advantages to reduce the size of structural members including girders, since the loadings from superstructure may be transferred to substructure through the connecting rebars such as stud, etc. This paper studied on the continuous Up and Down Prestressed Concrete (UD PSC) girder bridge in which the reinforced concrete pier cap is integral with the part of girders in superstructure. In previous studies, it is known that the structural behavior of continuous UD PSC girder bridge is quite different compared to the one of the bridges with conventional bearings or shoes to support the loading from girders. Nevertheless, it has hardly been studied about the structural behavior of bridge with UD PSC girder. Therefore, in this study, various dynamic behaviors of continuous UD PSC girder bridge with integral pier cap have been analyzed using numerical method. Furthermore, an equation to evaluate the impact factor is suggested for the UD PSC girder bridge which has two to three continuous spans.

Development of Quasi-Conforming Shell Element for the Three Dimensional Construction Stage Analysis of PSC Bridge (PSC 교량의 3차원 시공 중 해석기법을 위한 준적합 쉘 요소 개발)

  • Kim, Ki-Du;Byun, Yun-Joo;Kim, Hyun-Ky;Lomboy, Gilson R.;Suthasupradit, Songsak;Kim, Young-Hoe
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.20 no.3
    • /
    • pp.329-338
    • /
    • 2007
  • The PSC box bridge constructed of concrete, reinforcing bar and tendon is a complex structure that exhibits tension cracks, nonlinear behaviour of steel and time dependent behaviour of concrete. The frame element is commonly used for construction stage analysis PSC bridges. However, the frame element does not show sufficient information when in the curved PSC box bridges. For the case of curved PSC bridges, the deformations in the inner and outer web are different. In this case, different jacking forces are required in the inner and outer webs. However, it is impossible to calculate different jacking forces if we use the frame element for construction stage analysis. In order to overcome this problem, the use of the shell element is essential for a three-dimensional construction stage analysis of PSC bridges. In the following, the formulation of a Quasi-conforming shell element and its application of PSC box girder bridge analysis are presented.

A Dynamic Analysis of Rotations at the center of Vehicle Running High Speed KTX Train on the PSC Box Bridges (PSC 교량 위를 고속주행 중인 KTX 전동차의 중심회전각 동적해석)

  • Oh, Soon-Tack;Lee, Dong-Jun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.1
    • /
    • pp.59-67
    • /
    • 2014
  • A dynamic analysis is carried out to provide an evaluation method of running safety for a PSC box bridge located on the Gyung-Bu high speed railway. The numerical models of bridge and train vehicle are developed in detail with corresponding interaction system. Three dimensional skeleton element model of PSC box bridge and 38-degree-of-freedom of vehicle are adopted from the existing properties of KTX bridge and train vehicle. Analysed three direction rotations of vehicle on the bridge and ground tracks are compared for running speeds up to 500 km/h with 10 km/h constant increments. The comparison of the rotations will be an improved evaluation method of Running Safety in stead of the existing standard method.

Experimental Evaluation for Damping Ratio Limit of Railway Bridge according to Structure Types (철도교량 구조형식별 감쇠비 하한값 산정을 위한 시험적 연구)

  • Min, Rak-Ki;Sung, Deok-Yong;Park, Yong-Gul
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.2
    • /
    • pp.154-161
    • /
    • 2012
  • The damping ratio of railway bridge has become one of the most important issues in dynamic design and dynamic stability of railway bridge. In the present study, laboratory and field test were performed for railway bridges such as a twin I-shaped steel composite girder, PSC box, steel box, PSC, IPC, PRECOM, preflex. The damping ratio of railway bridge according to structure types was estimated by logarithmic decrement method. Therefore, magnitude, frequency and amplitude of load did not affect damping ratio of railway bridge. Also, damping ratio limit of steel composite and PSC bridges was evaluated in 1.0%.

An Experimental Study for Structural Safety Evaluation of PSC Box Girder Bridge with FRP Struts (FRP 스트럿을 가진 PSC 박스거더교의 구조안전성 평가를 위한 실험 연구)

  • Song, Jae-Joon;Park, Jong-Hwa;Park, Kyung-Hoon;Jo, Byung-Wan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.6
    • /
    • pp.205-213
    • /
    • 2008
  • The structure of PSC box girder with FRP strut has a form of supporting the cantilever part in the widened upper slab by modifying the existing PSC box girder efficiently, and it is able to build an economical and aesthetically pleasing bridge as it reduces the size of the lower structure by reducing the self-weight of the upper structure. In this research, loading test of PSC Box Girder using full-scale mock-up was conducted and FEM analysis was performed. By comparing results, structural safety of the FRP strut and the upper slab following application of the strut in the PSC Box Girder Bridge were evaluated.

A Study on Effect of Pre-Stressing Sequences in PSC Bridge Strengthening Method Using Continuity with External Prestressing (PSC교량 보강시 긴장력 도입순서의 영향에 관한 연구)

  • 방명석
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.4
    • /
    • pp.123-127
    • /
    • 2001
  • Numerous PSC bridges are stregthened by the combined use of continuity of simple spans and addition of external prestressing. In this case prestressing sequences should be carefully checked due to the effect on the stress and camber of girders and slab. Various prestressing sequences were applied in this field test and measured values were analysed. This results show that preatressing sequences affact the stress and deflection of bridge members, so the prestressing sequence should be considered at the desist and construction stages of deteriorated bridges.

  • PDF