• Title/Summary/Keyword: PSC 교랑

Search Result 112, Processing Time 0.021 seconds

Flexural Reliability Assessment of PSC-I Girder Rail Bridge Under Operation (사용중 PSC-I 거더 철도 교량의 휨모멘트에 대한 신뢰도 분석)

  • Kim, Ki Hyun;Yeo, Inho;Sim, Hyoung-Bo
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.2
    • /
    • pp.187-194
    • /
    • 2016
  • It is necessary to determine reliability indexes of existing railway bridges prior to setting up a proper target reliability index that can be used to introduce a reliability based limit state design method to design practice. Reliability is evaluated for a six PSC-I girder railway bridge, which is one of many representative types of double-track railway bridges. The reliability assessment is carried out for an edge girder subjected to bending moment. In the assessment, the flexural resistance and the fixed-load effect were obtained using existing statistical values from previous research on the introduction of limit state design to road bridge design. On the other hand, the live-load effect was determined using statistical values obtained from field measurement for the Joong-ang corridor, on which heavy freight trains are frequently passing. The reliability assessment is performed by AFOSM(Advanced First Order Second Moment method) for the limit state equation, and a sensitivity analysis for the reliability is performed for each factor of the load and resistance effects.

Development of Prefabricated Voided-Slab Bridge Using PSC-I Girders (프리캐스트 I형 거더를 이용한 조립식 중공슬래브교 개발)

  • Kim, Hyun-Gi
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.6
    • /
    • pp.742-752
    • /
    • 2017
  • The bridge type of steel concrete composite rahmen or pre-flex has been applied where a lower depth girder is required due to vertical clearance restrictions caused by the crossing of rivers and roads. On the other hand, because these types are not only complicated to manufacture and construct, but also expensive, void slab bridges may be an alternative. In this study, prefabricated PSC-I shape girder was used to make a void slab and all procedures for bridge development, such as analysis, design, fabrication, and real-scale test, were included in the scope of research. The results of this study will provide sufficient background data to be applied to the field and the structural safety has been verified through experiments.

Numerical Analysis for Dynamic Characteristics of Next-Generation High-Speed Railway Bridge (차세대 고속철 통과 교량의 동적특성에 대한 수치해석)

  • Oh, Soon-Taek;Lee, Dong-Jun;Yi, Seong-Tae;Jeong, Byeong-Jun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.2
    • /
    • pp.9-17
    • /
    • 2022
  • To take into account of the increasing speed of next generation high-speed trains, a new design code for the traffic safety of railway bridges is required. To solve dynamic responses of the bridge, this research offers a numerical analyses of PSC (Pre-stressed Concrete) box girder bridge, which is most representative of all the bridges on Gyungbu high-speed train line. This model takes into account of the inertial mass forces by the 38-degree-of-freedom and interaction forces as well as track irregularities. Our numerical analyses analyze the maximum vertical deflection and DAF (Dynamic Amplification Factor) between simple span and two-span continuous bridges to show the dynamic stability of the bridge. The third-order polynomial regression equations we use predict the maximum vertical deflections depending on varying running speeds of the train. We also compare the vertical deflections at several cross-sectional positions to check the influence of running speeds and the maximum irregularity at a longitudinal level. Moreover, our model analyzes the influence lines of vertical deflection accelerations of the bridge to evaluate traffic safety.

On-Site Construction Method for U-Girder with Pre-tension and Verification of Analytical Performance of Anchoring Block (프리텐션 U형 거더 현장 제작 방법 및 정착 블록 해석적 성능 검증)

  • Park, Sangki;Kim, Jaehwan;Jung, Kyu-San;Seo, Dong-Woo;Park, Ki-Tae;Jang, Hyun-Ock
    • Journal of Korean Society of Disaster and Security
    • /
    • v.15 no.3
    • /
    • pp.67-77
    • /
    • 2022
  • In South Korea, U-type girder development was attempted as a means to increase the length of I-type girder, but due to the large self-weight according to the post-tension method, the application of rail bridges of 30m or less is typical. There are not many examples of application of pre-tension type girder. This study does not limit the post-tension method, but applies the pre-tension method to induce a reduction in self-weight and materials used due to the reduction of the cross-section. In addition, we intend to apply the on-site pre-tensioning method using the internal reaction arm of the U-type girder. The prestressed concrete U-type girder bridge is composed of a concrete deck slab and a composite section. Compared to the PSC I-type, which is an open cross-section because the cross section is closed, structural performance such as resistance and rigidity is improved, the safety of construction is increased during the manufacturing and erection stage, and the height ratio is reduced due to the reduction of its own weight. Therefore, it is possible to secure the aesthetic scenery and economical of the bridge. As a result, it is expected that efficient construction will be possible with high-quality factory-manufactured members and cast-in-place members. In this paper, the introduction of the pre-tension method on-site and the analytical performance verification of the anchoring block for tension are included.

Static Behavior of the Prestressed Concrete Deck Slab for Steel-Concrete Composite Two-Girder Bridges (강합성 2거더교 PSC 바닥판의 정적 거동)

  • 김영진;주봉철;이정우;김병석;박성용
    • Journal of the Korea Concrete Institute
    • /
    • v.14 no.4
    • /
    • pp.503-512
    • /
    • 2002
  • Generally, the girder spacing of the two-girder composite bridge is from 5m up to 15m. To ensure the structural safety according to Korean Bridge Design Specification, the deck depth should be from 33 cm upto 73 cm. Using the transversal prestressing strands in concrete deck, we can reduce its depth about 10%. However, there is little experience on the design and construction of prestressed concrete(PSC) decks in Korea. This paper focuses on the behaviors of PSC deck. A literature survey is performed widely. Considering the characteristics of the two-girder bridge and the construction conditions in Korea, a cast-in-place PSC deck is recommended for the two-girder bridge with 6m girder spacing. To examine its structural behaviors and safety, three partial model deck specimens(3 m$\times$5 m) with real scale are fabricated md tested. One(PS34-RS) is 34cm depth with the stiffness restraint in longitudinal edges for simulating the real bridge deck. Another(PS34-NS) is same depth without the stiffness restraint, and the other(PS28-NS) is 28cm depth with the stiffness restraint. Under the static patch loading, each specimen had a larger ultimate flexural strength than the design value. Specimens with the stiffness restraint (PS34-RS and PS28-RS) showed the punching shear failure mode and specimen without that(PS34-NS) showed the flexural failure mode.

Non-Contact Motion Monitoring for Bridge using GPS (GPS에 의한 교량구조물의 비접촉식 거동모니터링 연구)

  • Choi, Yun-Woong;Jang, Young-Woon;Kim, Doo-Young;Lee, Chang-Kyung;Cho, Gi-Sung
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2008.10a
    • /
    • pp.348-349
    • /
    • 2008
  • 최근 PSC 교량, 사장교, 현수교 등 중장지간 교량의 건설이 증가하고 있으며 이러한 장대교량의 안정성 및 사용 확보를 위하여 장대교량의 계측 및 모니터링을 통한 손상도 및 안전도 평가에 보다 많은 관심과 연구개발이 집중되고 있다. 그러나, 인류의 경험과 이론의 지속적인 발전에도 불구하고 교량구조물의 실제 거동을 예측하고 안전성을 평가하는 것은 현재까지도 쉽지 않은 일이다. 본 연구에서는 GPS를 이용한 RTK 측정기법에 의하여 장대교량의 거동을 측정하고 기설된 교량의 모니터링 계측치를 비교 분석함으로써 GPS를 이용한 교량의 거동분석의 적용가능성 및 신뢰성 확보가능 여부를 파악하고자 하였다.

  • PDF

A Study on the Improvement of Bridge Maintenance and Operation Level Using Life-Cycle Cost Analysis (LCC분석을 통한 교량 유지관리수준의 개선에 관한 연구)

  • Chun yong-Hyun;Lee Young-Dae;Park Hyeok;Kim Sung-Hwan;Kim Sa-Myung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.266-269
    • /
    • 2003
  • This study predicts the maintenance and operation level of the bridge based on the LCC concept. In order to predict the LCC of the given case, suggested the maintenance and operation level after reviewing other related materials. Apply the real information of the maintenance and operation to the three casesof the maintenance and operation level (real, current, and prevented maintenance and operation level). And based on such analytical measures, maintenance and operation costs and LCC in maintenance and operation level, have been predicted: therefore, suggests the basic information about maintenance and operation level for the bridge. With a result of this study, we could obtain (1)the LCC of PSC-bridge and RC-bridge is more economy than Steel-bridge and (2)more active maintenance and operation of a bridge is absolutely necessary.

  • PDF

Crack Width Prediction in Concrete Bridges Considering Bond Resistances affected by Corrosion (부식에 의한 부착저항감소를 고려한 콘크리트 교량의 균열폭 예측)

  • Cho, Tae-Jun;Cho, Hyo-Nam;Park, Mi-Yun
    • Journal of the Korea Concrete Institute
    • /
    • v.18 no.4 s.94
    • /
    • pp.543-552
    • /
    • 2006
  • The current design for crack width control in concrete bridges is incomplete in analytical models. As one of the important serviceability limit states, the crack width be considered with the quantitative prediction of the initiation and propagation of corrosion and corrosion-induced cracking. A serviceability limit state of cracking can be affected by the combined effects of bond, slip, cracking, and corrosion of the reinforcing elements. Considering life span of concrete bridges, an improved prediction of crack width affected by time-dependent general corrosion has been proposed for the crack control design. The developed corrosion models and crack width prediction equation can be used for the design and the maintenance of prestressed and non-prestressed reinforcements by varying time, w/c, cover depth, and geometries of the sections. It can also be used as the rational criteria for the maintenance of existing concrete bridges and the prediction of remaining life of concrete structures.

Evaluation of the Load Carrying Capacity on a Rahmen Bridge with Ultra-high Strength Centrifugally Formed Square Beams as the Superstructure (초고강도 원심성형 각형보를 상부구조로 하는 라멘교의 내하성능 평가 )

  • Doo-Sung Lee;Sung-Jin Kim;Jeong-Hoi Kim
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.28 no.1
    • /
    • pp.61-69
    • /
    • 2024
  • An ultra-high strength prestressed prismatic beam of 100 MPa in compressive strength was developed by increasing the water-tightness of concrete by utilizing centrifugal molding processes without adding expensive admixtures. The centrifugal prismatic PSC beam developed as the superstructure of the avalanche tunnel was constructed on a rahmen bridge in a small local river. In this study, the centrifugal prismatic beam was compared and analyzed based on the results of measurements made through static load tests and the results of numerical analysis of the target structure. The common load-carrying capacity and safety of the rahmen bridge were evaluated. The static·dynamic load tests and finite element analysis results of this bridge were similar, and it was confirmed that the behavior of the centrifugal prismatic beam was well simulated. All centrifugally formed square beams that make up the composite rahmen bridge were evaluated to secure sufficient load carrying capacity under the design live load, and structural reliability was proven by ensuring safety.

The Effect of Design Parameter on the Beam Depth of IPC Girder Continuous Bridge (교량설계 변수가 IPC 거더 연속교의 형고에 미치는 영향)

  • 한만엽;김보형;김상완
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.125-130
    • /
    • 2001
  • A existing design method of PSC girder bridges, according to total service loads, stress required tendon force at a time. Because this design method increases beam depth, design of long span is difficult. However, As UC girder stressing at difficult loading stages reduces sectional depth of PSC girder, both design and operation of long span bridges is possible. so, this study analyzes the effect of design parameter (Girder Strength, Girder Spacing, Span Length, Joint Strength) on the beam depth of IPC girder continuous bridges, and shows sectional depth of UC girder for design of long span bridges. According to analysis, when a continuous bridges of same length span is at strength of joint over strength of girder of 600kg/$cm^{2}$, a change of beam depth is observed and when a continuous bridges of different span length is at strength of joint below strength of girder of 600kg/$cm^{2}$, a change of beam depth is observed. In two case, a change of beam depth is mostly observed over strength of girder of 350kg/$cm^{2}$ according to analysis of deflection data, a continuous bridges of IPC girder is nearly satisfied.

  • PDF