• Title/Summary/Keyword: PLANNING AND MANAGEMENT

Search Result 6,125, Processing Time 0.041 seconds

Challenges and suggestions of resource planning for standardized concurrent construction

  • Chen, Xingbin;Li, Sining;Kim, Jung In;Fang, Yuan
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.41-49
    • /
    • 2020
  • Concurrent construction offers considerable improvement for shorten the project duration of its production process. Therefore, standardized concurrent construction is widely applied in building construction projects. However, resources planning for standardized concurrent construction project is manually developed by construction manager. This practice is not effective since it is time-consuming and error-prone for managers to identify all project-specific information, distinguish different activity-resource types, interpret these types and analyze how they affect resource allocated on an ad hoc basis. Therefore, this research investigates the opportunity for leveraging activity modeling to enable automated resource planning for standardized concurrent construction during project development, with identifying the characteristics of construction activities under standardized concurrent planning and determining the activity-resources types that affects resource planning. Both will function as a basis for modeling these construction activities in a computer-interpretable manner and for automation in resource planning.

  • PDF

Top Management Commitment in Enterprise Resource Planning Implementation Success : Preliminary Study in Indonesian State-Owned Enterprises

  • Hartijasti, Yanki
    • Journal of Information Technology Applications and Management
    • /
    • v.18 no.3
    • /
    • pp.41-59
    • /
    • 2011
  • This preliminary study held in two Indonesian state-owned enterprises (SOEs) showed empirical evidence that top management commitment was perceived to be the most important critical factor contributing to enterprise resource planning (ERP) implementation success, compared to top management support and top management involvement. Therefore, top management and middle management must continually show commitment during the ERP implementation process. This finding could serve as a reference for further study in a larger number of Indonesian SOEs.

The Analysis of Load Management Effect in Shor-Term Generation Expansion Planning (단기 전력우급계획에서의 부하관리 효과 분석연구)

  • 김준현;정도영
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.41 no.9
    • /
    • pp.994-1002
    • /
    • 1992
  • With regard to price elasticity and cross elasticity of electricity, optimal generation expansion planning method including load management effect is suggested. In addition, optimal peak time price can be determined simultaneously, and we adopt peak time tariff as load management strategy. Instead of using hourly marginal demand curves where we can get customer surplus, we used chronological load curve with constraints to preserve social welfare. This method is proved useful in short-term generation expansion planning.

  • PDF

Retirement Planning by the financial management style (가계재무관리 유형에 따른 은퇴계획)

  • 김순미
    • Journal of the Korean Home Economics Association
    • /
    • v.32 no.5
    • /
    • pp.45-54
    • /
    • 1994
  • The purpose of this study was to investigate the characteristics of financial management styles and retirement planning. The results of this study were as follows: Among respondents systematic managers feeling managers analyzing managers, and holistic managers were respectively 20.1%, 19.5%, 30.8% and 29.6% Several variables such as education total household income and occupation had significant differences by the financial management style. Within the group of retirement planner analyzing manager held the first place whereas holistic manager ranked the first in non-planner group. Retirement planning age which is appropriate for starting to plan the degree of systematic retirement planning and life expectancy had significant difference by the financial management style.

  • PDF

Deriving of Critical Factors for Construction Planning in Large Span Roof Construction (대공간 지붕 철골공사의 시공계획 중점관리항목 도출)

  • Lee, Myungdo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.18 no.1
    • /
    • pp.67-75
    • /
    • 2018
  • Steel roof construction is on the most important and critical factors in the large spatial construction and necessary to be prepared under a radical planning. Therefore, the major management factors of steel roofing structure assembly must be critically reviewed during planning. Through the review process, it is necessary to reduce the construction cost, to prevent delays in the construction schedule, and to minimize construction errors. However, domestically due to the lack experience in large spatial constructions, a planning of roof construction is limited to have a radical planning. Especially due to unclear organization of the management factors in hierarchy, using them in reality for construction planning is difficult and reliability is low. Therefore, in this study, the goal is to conduct the major management factors in the large spatial construction. To achieve this, we have reviewed and analyzed the numbers of construction plans and construction reports and conducted a total 68 of the management factors. Based on the conducted factors, we have interviewed 16 experts with experience in large spatial construction. From the interview result, we have deduced the factors scored above 4.20 of 10 for critical factors. The results of this study will be used as a guidance for planning steel roofing structure assembly in large spatial construction. The critical factors will be provided to the site mangers for the quality management of large spatial constructions in practice.

A Study on the Optimal Stowage Planning for car carriers (자동차 운반선의 stowage planning 최적화 연구)

  • Kim, Hyun-Soo;Coi, Hyung-Rim;Jung, Jae-Un
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2009.06a
    • /
    • pp.165-166
    • /
    • 2009
  • The purpose of this study is to develop a model of the optimal stowing plan for car carriers. This model will be used for an integrated model of maritime transportation planning for car carriers with vessel allocation and voyage planning models.

  • PDF

Design and Implementation of UML-Based Material Management System for Automotive Part Company (자동차부품기업의 UML기반 자재관리시스템 설계 및 구현)

  • Park Jung-Hyuk;Seo Ki-Chul;Moon Tae-Soo
    • The Journal of Information Systems
    • /
    • v.12 no.2
    • /
    • pp.129-149
    • /
    • 2003
  • One of the important applications in Enterprise Resource Planning(ERP) systems is the Manufacturing Resource Planning(MRPII) system using Bill of Material(BOM). The manufacturing resource planning determines the quantity and timing of the production or purchase of subassemblies and raw materials needed to support the Master Production Scheduling(MPS). The bill of material is the recipe, a list of the materials needed to make a product. This paper intends to suggest a component-based materials management system using Unified Modeling Language(UML), as an application system for automobile part industry. Applying component based materials management systems designed with UML methodology, we analyzed the workflow and the document on materials management process from production planning to inventory management, and implemented a prototype of efficient materials management system, as a surrogate of existing material requirement planning(MRPI) system. To produce many other assemblies for a automobile part firm, component parts are assembled into subassemblies that are joined to assemble the finished product. Through the system suggested in this study, the level of inventory has cut down and the cost of inventory management has decreased. Also, the development method using UML makes the analysis and design phase to shorten in implementation period of MRPII system. The implementation of materials management system using CBD shows the ease of use in software reuse and the interoperability with corporate Internal information system. The result of applying object-oriented CBD technique is to minimize the risk of life cycle and facilitate the reuse of software as mentioned to limitation of information engineering methodology.

  • PDF

Global Collaboration During Front End Planning of Capital Projects

  • Gibson, G. Edward Jr.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.15-18
    • /
    • 2015
  • Front end planning is arguably the most impactful process in the successful delivery of capital projects. Organizations expend substantial effort in this planning process, intending to minimize risk and promote project success. This process has been well documented, including critical technical components, as well as the importance of team collaborative components. As organizations continue to pursue large projects with multi-national participation from sponsors, designers, contractors and suppliers, the importance of collaboration on a global scale during front end planning becomes more important, not less. This paper will outline research performed over the past two decades giving the basic components of the process and the value of global collaboration. It will provide guidance to project participants in pursuing successful planning.

  • PDF

A Comparative Study on the Regulations for Landscape Managements of Historic Cities in Korea and Japan (한국과 일본의 역사도시 경관관리법규의 비교 -경주시와 나라시의 사례로-)

  • 정성태;조세환;오휘영
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.28 no.3
    • /
    • pp.105-115
    • /
    • 2000
  • The purpose of paper is to investigate the characteristics of regulations on landscape management of historic city of Kyongju in Korea, compared with those of Nara in japan to answer the research question that what is the regulative characteristics of landscape management of historic city in Korea. We have analyzed the three laws of the two country - Urban Planning Law, Cultural Assets Protection law, and Building Law. This research has been done in terms of regulative systems of the two country and articles, ordinances, and bylaws on landscape managements of historic city Major components of urban historic landscape management are goals and devices of preservation, preserving actor, authorized actor permitting major planning change, regulatory power on landscape development, and backgrounds of enacting regulations. From this research, we have fond the fact that 1) Kyongju City has general and implicit objectives of landscape management based on conservation of natural environment while Nara City has concrete objectives of lansdscape management, 2) Kyongju City has no regulations on landscape planning while Nara City has systematic planning measures such as designation of landscape management district, planning for preservation of historic landscape, and planning for establishing urban landscape, 3) In an application of landscape management district, Kyongju City designate the district based on the general principle of urban planning district while nara City designate it in a more detailed manner such as district of preservation of historic landscape, district of landscape establishment, and district of building agreement. 4) Kyongju has no legal actor in implementation and management of historic landscape plan while Nara City has administrative organization and procedures, including citizen participation, public hearing, and voluntary participation, and 5) Kyongju City does not operate the consultation committee on landscape management just like Nara City operating. This research results will provide us the remedial insights for landscape preservation of such Korean historic city as Kongju, Puyo, and Chunju. Since our research is focused on the limited area of preserving landscape in historic cities in korea and Japan we need to study sociocultural issues on preserving urban historic landscape more in depth in the future.

  • PDF

A Plan of Project Information Management through Analysis of Drafting Process for Transportation Planning (양중계획입안 프로세스의 구조화를 통한 프로젝트 정보관리 방안)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.3
    • /
    • pp.101-109
    • /
    • 2008
  • As the number of high-rise building construction projects grows up, the subject of the transportation planning has become one of the grave issue. however important decision making are made by the experience of the a planner without the rational plans for information sharing. therefore, the purpose of this study is to suggest a plan of prefect information management not only for describing drafting process for transportation planning but also for systematizing information used in the procurement, transportation and construction phase to achieve these objectives, this study 1)analyzes the prior theory about transportation planning, 2)performs a case study of actual project to embody the problems of site management by analyzing the results of interviewing experts. In conclusion, the following factors are systematized : 1)the structure of drafting process for transportation planning, 2)the contents of information used in the procurement, transportation and construction phase, 3)the actual condition of code breakdown structure in transportation Planning phase. It is anticipated that the proposed methodology would be able to improve information management among the related engineers and accumulated data that might be used in similar construction projects in Korea.