Relationship Analysis of Field Work in Beam-Column System Frame Work of the Precast Concrete Public Apartment Building (보-기둥구조 PC공동주택 골조공사 작업관계 분석)

  • Kim, Ki-Ho;Kim, Jin-Won;Kim, MIn-Jun;Lee, Dong-Gun;Sohn, Jeong-Rak;Lee, Bum-Sik
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.41-42
    • /
    • 2022
  • This study analyzed the process related to the linkage between on-site work targeting the middle size Precast Concrete(PC) public apartment building with beam-column system and prepared on-site works flow relationship diagram in which the wet process consists of core Critical Path(CP) to prepare a network diagram of the Precedence Diagram Method(PDM). Through this study, it is expected that it will be possible to maximize the project management capability by suggesting a method to minimize risk factors and the optimized process management of the beam-column system PC public apartment building.

  • PDF

3-D image display by use projection technique (프로젝션 기술을 이용한 3차원 입체영상 표시)

  • Park, Sang-gug
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2012.10a
    • /
    • pp.665-668
    • /
    • 2012
  • This paper describes research results that 2-D contents, which display in smart phone or tablet PC to be able to see the 3-D stereoscopic by use projection technique. For this research, we have construct four brown-glass into pyramid shape, project each of the four LCD monitors that output from the PC screen into of the four inverted pyramid-shaped mirror and display the 3-D image to the center of the mirror system. For the test, We use tablet PC and server PC(desktop PC) connected by wireless network, tablet PC select contents which is displayed in the server PC, and displayed selected contents into the 3-D image to the center of the mirror system. Through the test, we have showed that it is possible to display 3-D stereoscopic to the 2-D contents by use projection technique. Although, display image is depending on the observer's viewing angle.

  • PDF

Utility of a forced expiratory flow of 25 to 75 percent as a predictor in children with asthma (소아 천식에서 최대호기중간유량의 기관지 과민성 예측인자로서의 의의)

  • Kang, Jung Wan;Kim, Kyung Won;Kim, Eun Soo;Park, Jun Young;Sohn, Myung Hyun;Kim, Kyu-Earn
    • Clinical and Experimental Pediatrics
    • /
    • v.51 no.3
    • /
    • pp.323-328
    • /
    • 2008
  • Purpose : Asthma is defined as chronic inflammation of the lower small airways, and bronchial hyperreactivity (BHR) is a pathophysiologic feature of asthma. It has been proposed that although there is no direct variable capable of assessing the small airways, a forced expiratory flow of between 25 and 75 percent ($FEF_{25-75}$) might be considered a more sensitive early marker of small airway obstruction than the forced expiratory volume in 1 second ($FEV_1$). Thus, we proposed that the presence and degree of positive responses to bronchial methacholine testing were related to the difference (DFF) and ratio (RFF) between $FEV_1$ and $FEF_{25-75}$ in asthmatic children. Methods : The subjects were 583 symptomatic children, including 324 children with BHR and 259 controls. Pulmonary function tests, methacholine challenge tests, and skin prick tests were performed, and the total eosinophil count, total serum IgE, and serum eosinophil cationic protein level were measured in all subjects. From a concentration-response curve, the methacholine concentration required to produce a decrease of 20% from post-saline $FEV_1$ was calculated ($PC_{20}$). Results : The median DFF and RFF values decreased in controls compared to subjects with bronchial hyperresponsiveness, and this trend was found in groups ranked by its severity. $PC_{20}$ had a negative correlation with DFF and RFF. Cutoff values of 0.5 for DFF and 1.042 for RFF were identified, and sensitivity and specificity were calculated. Conclusion : This study revealed that DFF and RFF might be predictive of bronchial hyperresponsiveness in the context of normal $FEV_1$ in children.

Experimental Study of In-situ Production of Precast Concrete Members

  • Lim, Jeeyoung;Son, Seunghyun;Kim, Jeong Tai;Kim, Sunkuk
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.263-270
    • /
    • 2017
  • The precast concrete (PC) structure has been preferred for reasons of shortening the construction time and securing the quality and, in particular, it has a cost saving effect in case of long span and heavy loaded structure with high floor height. Most engineers take it for granted to install the plant produced PC members. Researchers in several papers have argued that slander PC members such as columns and girders can be cost-effective if in-situ production is possible, while ensuring quality equal to or better than in-plant production. However, this argument is not officially accepted because objective verification has not been done. Therefore, the purpose of this study is to experimentally conduct in-situ production of PC members to verify the above claim. For this study, a storage building with long span and heavy loaded structure with high floor height was selected as a case study site. For the site, most of the PC members were supplied from the plant, and some of the columns were produced in the site for this study. As a result, it has been confirmed that it has a cost saving effect of 20% while having superior quality to plant-produced PC columns.

  • PDF

A Study of Future Internet Testbed Construction using NetFGA/OpenFlow Switch on KOREN/KREONET (KOREN/KREONET기반 NetFPGA/OpenFlow 스위치를 이용한 미래인터넷 테스트 베드 구축 방안 연구)

  • Park, Man-Kyu;Jung, Whoi-Jin;Lee, Jae-Yong;Kim, Byung-Chul
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.47 no.7
    • /
    • pp.109-117
    • /
    • 2010
  • Building a large-scale testbed for Future Internet is very important to evaluate a new protocol and new network architecture designed by clean-slate approach. In Korea, new Future Internet testbed project, called FIRST (Future Internet Research for Sustainable Testbed), has been started since Mar. 2009 to design and test new protocols. This project is working together with ETRI and 5 universities. The FIRST@PC is to implement a virtualized hardware-accelerated PC-node by extending the functions of NetFPGA card and build a Future Internet testbed on the KOREN and KREONET for evaluating newly designed protocols and interesting applications. In this paper, we first briefly introduce FIRST@PC project and explain a 'MAC in IP Capsulator' user-space program using raw-socket in Linux to interconnect OpenFlow enabled switch sites on the KOREN and KREONET. After that, we address test results for TCP throughput performance for varying packet size. The test results show that the software based capsulator can support a reasonable bandwidth performance for most of applications.

Analysis of Environmental Impact Statement (환경영향평가서 분석)

  • Lee, Jae-Woon;Chang, Chun-Ki;Kwon, Myeong-Hee;Bang, Kyu-Chul;Jeong, Dong-Hwan
    • Journal of Environmental Impact Assessment
    • /
    • v.3 no.2
    • /
    • pp.77-84
    • /
    • 1994
  • The study is to analyze the contents of Environmental Impact Statement(EIS) and supplementary EIS prepared from 1981 to 1992. The contents are project area, project cost, EIS volume, project term, assessment term, EIS preparation cost, land use plan, and kinds of predictive model concerning air quality, water quality, noise and vibration etc. by project type. Data are collected with EIS analysis checklist and analyzed by $SPSS/PC^+$.

  • PDF

An introduction to the MMI system of strip casting Process (박판주조공정의 MMI 시스템 소개)

  • Joo, Moon-G.;Lee, D.S.;Kim, Y.H.;Kang, T.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07d
    • /
    • pp.2778-2780
    • /
    • 2000
  • MMI system for strip caster 2 is described. It has been developed as a PC-based MMI system whose data is collected from the VME-based control system by ETHERNET. MMI elements that mimic the caster and its utilities are designed by using commercial program. In order to implement the UDP/IP communication in MMI, UDP/IP manager program with DDE that is a intercommunication protocol in MS-window is developed and connected with MMI mimics. Operator commands in MMI system are carried out immediately in VME system and the responses are displayed on MMI system. The developed MMI system has been proven to be convenient and stable through the operation of the past 5 years.

  • PDF

CONSTRUCTION MANAGEMENT OF TUNNELLING IN SEVERE GROUNDWATER CONDITION

  • Young Nam Lee;Dae Young Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.655-661
    • /
    • 2005
  • For a hydro power plant project, the headrace tunnel having a finished diameter of 3.3m was constructed in volcanic rocks with well-developed vertical joint and high groundwater table. The intake facility was located 20.3 km upstream of the powerhouse and headrace tunnel of 20 km in length and penstock of 440 m in height connected the intake and the powerhouse. The typical caldera lake, Lake Toba set the geology at the site; the caving of the ground caused tension cracks in the vertical direction to be developed and initial stresses at the ground to be released. High groundwater table(the maximum head of 20 bar) in the area of well-connected vertical joints delayed the progress of tunnel excavation severely due to the excessive inflow of groundwater. The excavation of tunnel was made using open-shield type TBM and mucking cars on the rail. High volume of water inflow raised the water level inside tunnel to 70 cm, 17% of tunnel diameter (3.9 m) and hindered the mucking of spoil under water. To improve the productivity, several adjustments such as modification of TBM and mucking cars and increase in the number of submersible pumps were made for the excavation of severe water inflow zone. Since the ground condition encountered during excavation turned out to be much worse, it was decided to adopt PC segment lining instead of RC lining. Besides, depending on the conditions of the water inflow, rock mass condition and internal water pressure, one of the invert PC segment lining with in-situ RC lining, RC lining and steel lining was applied to meet the site specific condition. With the adoption of PC segment lining, modification of TBM and other improvement, the excavation of the tunnel under severe groundwater condition was successfully completed.

  • PDF

Feasibility Analysis of the Use of Architectural PC for Improving the Productivity in Apartment Housing Projects (공동주택 공사에서의 생산성 향상을 위한 건축 외관용 PC의 적용 타당성 분석)

  • Lee, Hyun-Seok;Sohn, Young-Jin;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.118-125
    • /
    • 2008
  • In Korea, five days per week system, duration reduction bidding system, and post sale system have recently stimulated an interest in productivity improvement in construction project. However, analysis result of productivity in Korean construction industry found that the productivity is too low. APC (Architectural PC) is alternative of reveal wall and parapet in apartment housing prcjects and is used abroad broadly because of duration reduction for productivity improving. APC is used as external curtain wall in Dubai, North America, and Southeast Asia. Therefore, it is proposed that necessary to Introduce APC in Korea. The objective of this study is to draw up introduction of APC in apartment housing projects. We analysed the feasibility of the use of APC. The survey results reported that APC would be able to improve the productivity in the eight productivity factors.

A Study of Prestressed Concrete Pile Stiffness for Structural Analysis of Condominium Remodeling with Vertical Story Extension (수직증축형 공동주택 리모델링 구조해석을 위한 PC말뚝 강성에 관한 연구)

  • Choi, Changho;Lee, Hyunjee;Choi, Kisun;You, Youngchan;Kim, Jinyoung
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.12
    • /
    • pp.81-92
    • /
    • 2017
  • According to the revision of the Housing Act in 2013, it has been possible to carry out an apartment remodeling project involving two to three floor vertical extension. The remodeling project with vertical extension requires foundation reinforcement because structural safety due to additional load and enhanced seismic criteria must be met. In this case, structural analysis is performed to analyze the load distributed to existing PC pile and reinforced additional pile. The vertical stiffness ($K_v$) of the pile is required for structural analysis, but the research on the 20~30 year old PC pile stiffness is very limited. In this paper, the stiffness of the PC pile in accordance with the change of diameter and length was analyzed by examining the results of 38 field pile load tests performed during the construction of the apartments in the 1990's. As a result of the analysis, the pile stiffness decreases with the increase of the length-diameter ratio (L/D). In addition, the results of on-site pile load test are compared with the coefficient 'a' for estimating pile stiffness proposed in Korea Highway Bridge Design Standard (2008) and the Pile Foundation Design Guideline of Korea Railroad Corporation (2012). It shows that 'a' obtained through the estimation of the literature is very similar to the field test results in the range of 10