• 제목/요약/키워드: PC Girder

검색결과 54건 처리시간 0.026초

Project level에서의 철도 PC Beam교량의 경년열화모델구성 및 유지관리비용 추정 (Time-Dependent Degradation Model and Maintenance Cost of Rail line PC Beam Bridge in Project Level)

  • 권세곤;박미연;도정윤;김두기
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.17-22
    • /
    • 2008
  • Construction project have extremely high risk in the process of construction owing to unexpected event, like as design amendment. As a result, owner have to endure enormous extra-cost to control the risk and continue to the project having more higher uncertainty. Also, if the structure is completed, it is needed that the structure is protected and maintained continuously during life cycle time to satisfying original aim of structure itself. LCC analysis to calculate cost of structure alternatives divides into two stage, one is design_LCC and the other is maintenace_LCC. But two stages all is needed in the transition deterioration model to calculate more reasonable LCC analysis. This paper developed the model using analysis of FMS contents and survey from professional about Prestressed concrete beam girder bridge(PC Beam bridge)in railway. The model is focused in project level of PC beam because any condition state information for element level analysis can not get up. This paper is intended to use the developed model in LCC analysis of PC Beam bridge in railway and constitute the foundation to perform more deep study in the near future.

  • PDF

검측비용을 고려한 PC박스 거더의 신뢰성 분석 (Reliability Analysis of Prestress Concrete Box Girder Bridges Considering Inspection Cost)

  • ;정민철;공정식
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2010년도 정기 학술대회
    • /
    • pp.476-479
    • /
    • 2010
  • In recent years, the deterioration of infrastructures is especially considered. In prestress concrete bridges, one of the important mechanisms of deterioration is the corrosion of the post-tensioned tendon due to environmental agents. In this study, the reliability analysis is performed for a prestress concrete box girder bridge under the pitting corrosion attack with considering the inspection and failure cost. The variation of life-time performance depending on inspection methods have to be quantified. The inspection methods with different accuracy of corrosion detection are presented and applied for model of reliability analysis. The computer program for analysis reliability index of the structure as well as updating process is obtained. An existing bridge is applied for illustrating the influence of inspection cost on the behaviors of structure. Subsequently, the benefit of inspection has shown to predict the time to failure of structure.

  • PDF

철도교용 비대칭 거더의 현장 타설부에서 나타나는 시간에 따른 크립 및 건조수축 평가 (Evaluation of Timependent Creep and Shrinkage of CIP Section in Asymmetric PSC Box Girder for Railroad Bridge)

  • 정치영;박승민;안진희;김상효
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.973-978
    • /
    • 2011
  • In this study, effects due to differences of creep and shrinkage which is caused by material differences such as concrete characteristic and age in an asymmetric PSC box girder were evaluated. For this purpose the prestress distribution, creep and shrinkage were analyzed with the FE analysis program, LUSAS 14.3. As a result of the prestress, the stress distribution was stable. In case of the analysis result which was conducted with 1,000 days response time, the shear stress between PC section and CIP section is satisfied with design shear strength.

  • PDF

합성 PC 보의 하부철근 이음 및 정착방법에 따른 경제성 검토 (Economic Analysis of Connection and Anchorage Methods of Bottom Rebar for Composite Precast Concrete Girder)

  • 조원현;임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.11-12
    • /
    • 2015
  • Green Frame is a Rahmen structure made of composite precast concrete members. According to the concrete design code, a lower rebar of precast concrete girder, should be extended to the inner precast concrete column. However, such extension of lower rebar may sharply reduce its constructability. To satisfy the criteria, the connection and anchorage of beam rebar should be taken into consideration, yet it is difficult to use lapping as it is not easy to ensure enough space when Green Frame method is adopted. To solve this, a new method of lower rebar connection and anchorage was developed, and this study is intended to review economic feasibility prior to applying the method developed onto sites. The study result can be used as basic data for selection of the optimal joint and anchorage method for lower rebar of the green frame construction.

  • PDF

충격탄성파법을 이용한 PC형교의 그라우트 미충전부 탐사측정 (Investigation for Detecting the Poorly Grouting of a PC Girder Bridge)

  • 이상훈;사가라 유조;엔도 타까오
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2010년도 정기 학술발표대회
    • /
    • pp.40.2-40.2
    • /
    • 2010
  • PC형교에서는 거더의 복부와 하부에 PC강선을 수용하는 쉬이스가 배치되어 있어며, 그 내부에 그라우트를 충전함으로서 PC강선과 콘크리트를 간접적으로 부착시킨다. 그러나, 이 충전이 불충분하면, 쉬이스 내부에 물이 침투하여 PC강선이 부식하거나, 동결융해 작용에 의한 쉬이스 배치 위치에서의 횡방향 균열이 발생한다. 본 연구에서는, 충격탄성파법을 이용하여 실구조물에 대한 그라우트 미충전부 탐사측정을 실시하고, 미충전부로 보여지는 장소를 천공으로 확인함으로서 본 방법의 실용성에 대하여 보고한다.

  • PDF

신뢰성에 기초한 고속철도 교량의 내하력평가 (Reliability-Based Capacity Rating of High-Speed Rail-Road Bridges)

  • 조효남;이승재
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1995년도 봄 학술발표회 논문집
    • /
    • pp.73-81
    • /
    • 1995
  • In Korea, the pilot construction of the first high-speed railroad on the Seoul-Pusan has already started 2 years ago. In the thesis, an attempt is made to develop reliability-based integrity-assessment models for the computer-aided control and maintenance of high-speed railroad bridges. The strength limit state models for PC railroad bridges encompass the bending and shear strengths as well as the strength interaction equations which simultaneously take into the element and system reliablities of the proposed limit states and reliability models. Then, the actual load carrying capacity and the realistic safety of bridges are evaluated using the system reliability-based equivalent strength, and the results are compared with those of the element reliability-based or conventional methods. Various parametric studies are performed for the proposed reliability-based safety and integrity-assessment models using the actual PC box girder bridges used in the pilot construction. And the sensitivity analyses are performed for the basic random variables included in strength limit state models. It is concluded that proposed models may be practically applied for the rational assessment of safety and integrity of high speed railroad bridges.

  • PDF

비부착 압축 프리스트레싱을 도입한 중공박스 거더의 거동 (Behavior of Hollow Box Girder Using Unbonded Compressive Pre-stressing)

  • 김성배;김장호;김태균;어철수
    • 대한토목학회논문집
    • /
    • 제30권3A호
    • /
    • pp.201-209
    • /
    • 2010
  • 일반적으로 PSC 거더 교량은 철근 콘크리트 부재와 달리 전단면을 사용하여 외부하중을 저항한다. 또한 설계와 시공의 용이성, 구조적 안전성, 경제성, 유지관리의 편리성 등의 장점 때문에 30 m 이하의 중/소 경간 교량에 많이 적용되고 있다. 그러나, 최근 전세계적으로 환경, 미관 등에 관심이 높아짐에 따라, 교량의 경간은 점점 길어지는 추세이다. 이러한 추세는 케이블 교량뿐만 아니라 PSC 교량에서도 나타난다. 본 연구는 시대적 흐름에 맞춰 PSC 거더를 50 m 이상의 장경간에 적용하기 위한 연구의 일환으로 상부에 H형 강재가 도입된 중공 박스 합성거더를 개발하였다. 개발된 거더는 타설 전 상부에 H형 강재에 미리 비부착 압축 프리스트레스를 주어 거더의 성능저하 시 프리스트레스력을 제거하여 성능을 회복시키는 방법이다. 개발된 거더는 실제 교량에 사용하기위한 필수적인 정적실험을 3점 재하로 4단계로 구분하여 수행하였다. 1차 하중은 균열발생시점까지로 하였으며, 하중 제거 후 미리 상부강재에 도입된 프리스트레스력을 제거하여 거더의 성능회복력을 확인하였다. 그 후, 거더가 파괴될 때까지 하중을 재하하였다. 실험 결과, 18.7 mm의 잔류변형이 발생하였으나, 상부 강재의 PS 제거에 의해 7.7 mm로 회복되었다. 즉, 상부 H형 강재에 도입된 비부착 압축프리스트레스의 제거에 의한 거더 하연의 추가 압축응력으로 하중 증가에 따른 잔류변형을 약 60%가량 회복시키는 성능향상을 보였다. 상부에 H형 강재를 시공함으로써 추후 보수보강을 용이하게 할 수 있고, 비용도 절감할 수 있다.

선로 이송 가설공법을 적용한 철도판형교 유도상화 (An experimental construction of railway steel plate girder strengthen adding ballast system by transport equipment)

  • 민지홍;서종원;장형식;박준원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.707-716
    • /
    • 2011
  • It has been applied using cranes or insertion methods to install heavy structures to strengthen existing railway bridges. These methods are uneconomical because of two reasons. The first one is it is required to construct approach roads for heavy equipment and/or working yard. The second one is the electric lines shall be cutoff during construction. Both require additional construction cost and duration. In this study, new transport equipment was developed which can be applied to heavy structures up to 100 ton. Using this method, the heavy structure can be loaded into the new transport equipment at working yard and transported to the working site. This method can be applied, but not limited to railway bridge or roadbed rehabilitation. It was found that the precious construction can be achieved to install heavy structure using this method. The experimental construction to make non-ballast girder bridge composite with new pc deck slab using this method was carried out for Jewon bridge. The example bridge is in extreme condition because it locates above national road #38 within extreme transition curve and has 10 ‰ slope and skew. The experimental construction results were satisfactory both for safety and construction precision.

  • PDF

Structural health monitoring of a high-speed railway bridge: five years review and lessons learned

  • Ding, Youliang;Ren, Pu;Zhao, Hanwei;Miao, Changqing
    • Smart Structures and Systems
    • /
    • 제21권5호
    • /
    • pp.695-703
    • /
    • 2018
  • Based on monitoring data collected from the Nanjing Dashengguan Bridge over the last five years, this paper systematically investigates the effects of temperature field and train loadings on the structural responses of this long-span high-speed railway bridge, and establishes the early warning thresholds for various structural responses. Then, some lessons drawn from the structural health monitoring system of this bridge are summarized. The main context includes: (1) Polynomial regression models are established for monitoring temperature effects on modal frequencies of the main girder and hangers, longitudinal displacements of the bearings, and static strains of the truss members; (2) The correlation between structural vibration accelerations and train speeds is investigated, focusing on the resonance characteristics of the bridge at the specific train speeds; (3) With regard to various static and dynamic responses of the bridge, early warning thresholds are established by using mean control chart analysis and probabilistic analysis; (4) Two lessons are drawn from the experiences in the bridge operation, which involves the lacks of the health monitoring for telescopic devices on the beam-end and bolt fractures in key members of the main truss.

프리캐스트 프리스트레스트 콘크리트(PC) 박스거더 교량의 정착부 거동 및 해석 (Anchorage Zone Behavior and Analysis of Precast Prestressed Concrete Box-Girder Bridges)

  • 오병환;임동환;이명규;백신원
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1994년도 봄 학술발표회 논문집
    • /
    • pp.36-41
    • /
    • 1994
  • 프리캐스트 프리스트레스트 콘크리트 상자형 교량의 정착부에 프리스트레스 힘이 도입되면, 과다한 국부집중 하중으로 인하여 균열이 발행할 수 있으며, 최근 이러한 교량의 건설시 텐던을 따라가며 심각한 균열이 발생한 경우가 있다. 본 논문은 프리캐스트 프리스트레스트 콘크리트 상자형 교량의 정착부에 발생하는 국부집중 응력의 분포 특성을 규명하고, 이를 토대로 파괴기구 고찰함에 목적이 있다. 이를 위하여 정착부 파괴에 직접적인 영향을 미치는 단면의 형상, 텐던의 배치상태, 국부보강 철근의 형태 및 구조보강 철근량 등을 변수로 하는 역학적 거동 실험 및 해석 연구가 수행되었다. 위의 실험 및 해석연구결과 정착부 파괴양상이 규명되었으며, 프리스트레스 정착부의 새로운 파괴기구 개념이 제시되어, 정착부 파괴과정을 적절히 설명하고 있다.

  • PDF