• Title/Summary/Keyword: Owner-CM

Search Result 60, Processing Time 0.026 seconds

A STUDY ON CONSTRUCTION CONTRACTS AND PAYMENT METHODS IN CM AT RISK SYSTEM -APPROACH WITH ESTABLISHING CONTEXT OF GMP-CM SYSTEM -

  • JeaSauk Lee;JaeYoul Chun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1002-1006
    • /
    • 2005
  • When we compare CM system with Design Bid Build system, we can see two striking features in CM system. First, CMr participates in construction team along with Owner, Designer and Constructor. The newcomer can change boundaries of function and responsibility. Second, Compatibility through each phase and Objectivity of decision-making become more important, because relation among stakeholders changes from a rectilinear to a network. However, it is not clear how the risk of completion is reasonably treated. So we have to think about the relations between Owner and CMr, CMr and Specialist Contractor from a point of trade risk. This paper covers them.

  • PDF

A Review of the Improvement of Construction Management (CM) System and the CM Policy for the Public Construction Works (공공사업의 CM제도 개선 및 정책방향)

  • Jang Kie-Chang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.207-212
    • /
    • 2002
  • The Construction Management(CM) System in Korea is systematized both in name and reality by being prescribed in Construction Industry Act('97) and Construction Management Act('01) through various discussions considering reformation of construction industry structure and enhancement of construction technology competitiveness. Specially in the public construction works, CM Pilot Project is promoted by central government for the activation of CM system introduced for efficiency of public construction project. The promotion of Pilot Project is not only the settlement and activation of CM system but also the process to embody and diversify the CM system. Now we should develop various CM application type such as Owner type, PM type and type for private capital project in doing so. And with this efforts, we could expect that CM system should play an important role to enhance the efficiency of public construction works and should affect private construction sector.

  • PDF

A Study of CM(Construction Management) application method for exhibition facilities. (전시시설 건립을 위한 CM 적용방법에 관한 연구)

  • 문종승;임채진
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2001.05a
    • /
    • pp.39-44
    • /
    • 2001
  • An instance of domestic exhibition facility building case, the shortage of managing personal in construction resulted serious issue on expenses, times, quality, and safty with no satisfaction on its process and result. According to subject's speciality the CM's application methods are varied and because of its speciality, overall process of building an exhibition facility operating by its owner. This study intends to exam a application possibility of CM on exhibition facility construction to make smooth communication among varied area that following to exhibition facility construction.

  • PDF

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.

Efficient Application of Multi-Trade Contract Method to Public Construction Project (공공건설사업 직할시공제 적용의 문제점 및 효율적 적용 방안)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.35-44
    • /
    • 2013
  • Multi-trade Contract Method was introduced as a means of cutting down construction cost of public housing for low income people. Before a specific project delivery method is applied to large public construction project, it is necessary to discuss all the issues raised up from all the parties in construction industry and all the issues which can impact project performance. Thus the interviews were conducted with industrial professionals from diverse organizations and previous studies were investigated to figure out how this newly introduced project delivery method may impact owner's role and responsibility and project performance in terms of cost, schedule, quality and risk. Under the Multi-trade Contract Method, project owner's management tasks will be highly increased, so it should be checked out if the owner can do its role and responsibility. Public owner's organization also needs to be changed and proper project management procedure and system need to be established. In addition, for efficient application of Multi-trade Contract Method, public owner should consider diverse management approach to deliver the project, and how to select and maintain qualified specialty trades.

Survey of Korean CM Contracts for Current Status and Future Direction: Based on 1997 to 2013 Statistics

  • Ha, Jiwon;Park, Jongsoon;Jung, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.440-444
    • /
    • 2015
  • As domestic construction investment has been gradually reduced, expanding overseas construction is one of the most important issues for Korean construction companies. Among these issues, strategies for overseas CM services have widely been discussed, because the CM services have features of high growth potential and value-added area when compared with other construction sectors. Therefore, recent efforts focus on further development in advanced CM capabilities and expansion to overseas market. However, there has been lack of quantitative research to investigate current status and future direction of CM industry. In this sense, this research investigated what CM has achieved for the past 17years (between 1997 and 2013) and what CM should accomplish for future strategies. The purpose of this research is to statistically analyze total of 2,983 CM service contracts over the past 17 years published in KISCON (Knowledge Information System of Construction Industry) in order to examine current status of CM industry in terms of market type, contract size, commodity type, and owner's type. Based on this research, it is expected to suggest for future strategies and development directions from the CM industry perspective that could provide quantitative analyses, improve current CM statistics systems and strengthen the competitiveness in international CM market.

  • PDF

A Study on the Decision Method for CM Organization of Skyscraper Projects in Korea using the Pugh-Matrix (의사결정 매트릭스를 활용한 국내 초고층 프로젝트의 CM 조직 구성 결정방법에 관한 연구)

  • Lim, Jae-Bok;Choi, Won-Cheol;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.2
    • /
    • pp.39-47
    • /
    • 2010
  • In this study, there should be a debation on the methods, such as considerations on the CM organization of skyscraper project for the client's side, process and impact factors need to be taken, and suggesting the evaluation and selection criteria, which may lead strategic decision-making by the client. Owner of the CM organizational decision to establish a variety of alternatives, the range of CM performance characteristics of the project, considering the weight and also by evaluating the effectiveness of appropriate alternative is selected. Domestic skyscraper project, decisions about the CM organization for 'S Tower' prior to the proposed decision and the criteria was applied. As a result, domestic CM/PM companies and overseas CM/PM companies were doing business as J/V, Supervision of the integration work order types showed the highest performance levels. when they ordered CM services. The project cost reduced and organizational improvements, the results of applying alternative way, improve on-site construction plans, sharing key technologies, process improvement plan could benefit from such expectations.

A study on the Ethics Characteristics according to Service and Practice of Construction Manager (건설사업관리자의 업무수행에 따른 윤리 특성 고찰)

  • Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.97-106
    • /
    • 2011
  • Construction Management is the overall management of the project as construction manager and the owner are united together. Construction manager's role is to conduct the overall or partial construction administration in the 'design, bid, build' process, in the owner's interests with maintaining technical neutrality. Construction manager is becoming one of new professionals in the building process and the contract defines their roles and the range of services, so high level of ethnics are required. This study suggests the legal status of the construction manager and the ethnic standards and the ethnic's characteristics. In conclusion, firstly, the legal characteristics of the administration of construction management are the delegations contract, the responsibility of negligence and the duty of due diligence, abided by the contract that ties between the owner and the construction manger. Secondly, the administerial characteristics of the construction management are the role of mediator, the service of professional technology, accountability to the owner and publicness. Thirdly, due to these characteristics, as a professional, the standard of ethnic assessment for the construction project manager are intention, act and result, so with the relation to that, morality, deontology and consequentialism have been suggested in this study.

Policies and Tasks for Improving Korean CM Industry (CM 산업 발전을 위한 정책 및 과제 추진 방안)

  • Kang, Seunghee;Jung, Youngsoo;Kim, Namjoon;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.71-81
    • /
    • 2014
  • As domestic construction investment has been gradually reduced, the issue of expanding overseas CM market has increased. Strengthening CM capability from the view point of project life-cycle is required in overseas CM market. However, current regulations institutionally force public CM services to focus on the construction phase. Therefore, Korean CM firms can hardly have the opportunities for accumulating technical competitiveness especially for pre-construction phase. Result of this study shows that the total efforts in terms of man-hours for the construction phase is found to be more than 78 percent in domestic public CM projects. In this context, this study proposes the policies and tasks for improving 'rigid man-hour placement', 'unreasonable CM fee standards', 'CM firm selection method', 'unreasonable business scope decision', and 'evaluation of owner's project management capability' in order to improve domestic CM Industry as well as to expand overseas CM market successfully.

CM Market Revitalization Strategies in Domestic Public Construction Projects based on Questionaries and Delphi Techniques (델파이기법을 이용한 국내 공공공사 용역형 CM 시장의 활성화 전략)

  • Oh, Se-Wook;Han, Seung-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.131-142
    • /
    • 2012
  • Since CM for Fee has been introduced in domestic market of construction industry, Construction Management(CM) has been familiar with one of the established delivery systems in Korea. However, CM(CM for Fee) construction market has been stagnant consistently due to recent economic recessions. The fundamental causes of the current depression of CM construction market are highly related to the social/environmental factors(such as owner's negative perception about CM services, exclusive formation of the CM markets, unfeasible fee and limitations on technology developments in CM services) and the shortage of institutions associated with CM. Accordingly, fundamental improvements on the CM environment are required. This study suggests the feasible methods for improvement on CM system based on fundamental analysis of problems related to the environmental factors by conducting a delphi technique with professional personnels on various positions in CM markets.