• Title/Summary/Keyword: Owner's Requirement

Search Result 21, Processing Time 0.03 seconds

Requiremental Function Method based Owner's Requirement in VE Process Application at Planning Stage (기획단계 발주자 요구사항 기반 Requiremental Function Method VE 적용)

  • Park, In-Ji;Son, Myung-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.123-125
    • /
    • 2012
  • It is the important accurately to identify the needs of our customers in order to success the project. Requirements in the early stages of business is very abstract or not quantitative, and that will cause problems such as cost or schedule changes. Particularly many people are likely to prefer the early stages of the project, because the time of applying VE related cost savings is important. Owner's requirement analysis for project success in the VE process does not easy, and specific ongoing management of the requirement is difficult. Therefore, the analysis and the application of owner's requirements is limited in project process. The purpose of this study is proposed to the RFM technique to supplement the functional analysis on the basis owner's requirements analysis in planning a building project.

  • PDF

A Study on the optimal Size and Speed of Common Bulk Carrier (일반살화물선의 경제성 평가에 관한 연구 (속력 및 적화톤수를 중심으로))

  • 양시권;손성빈
    • Journal of the Korean Institute of Navigation
    • /
    • v.6 no.1
    • /
    • pp.19-39
    • /
    • 1982
  • There may be a lor of studies on the economic design of ship for the most favorable combination of design basis on the owner's request. However, there are few on the economical ship's size and speed for the ship owner's stand point. This paper describes on the optimal ship's size and speed to the given marine commercial environments for the owner's requirement to the shipyard. As the result of the paper, the criterion curve of bulk carrier will also be used to assess existing ships for their profitability.

  • PDF

Multi-Criteria Decision-Making Model Using Quality Function Deployment (QFD) Method for the Most Suitable Temporary Earth Retaining System

  • Jung, Bae Yu;Byung, Cho Han;Jin, Han Sang;Won, Kwon;Ho, Jo Jae;Youl, Chun Jae
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.620-621
    • /
    • 2015
  • In this study, the multi-criteria decision-making model based on Quality Function Deployment Method is proposed. Multicriteria decision-making is an attempt to link QFD method with the TOPSIS. By this effort, a model that makes client's decision-making more rational and objective in design phase is suggested. The multi-criteria decisionmaking model confirming to the Owner's requirements will improve the productivity of the construction industry and the satisfaction of the customer. Further study extending the range of the requirements, not only the Owner's requirement will be necessary to cover the various factors as much as possible. And then, finally as a flexible platform to achieve a sustainable quality management, web-based multi-criteria decision-making model can be utilized by the relevant stakeholders simultaneously with the feed-back and sharing the necessary informations.

  • PDF

The Study of Designer's Approaching Procedure by Applying Value Evaluation Method to improve Degree of Owner's Satisfactions in Design Phase (설계단계에서 건축주 만족도 증진을 위해 가치평가방법을 활용한 설계자 접근절차에 대한 연구)

  • Lee, Do-Hyung;Park, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.117-122
    • /
    • 2006
  • In spite of various approaching method to satisfy with the owner's requirements in schematic design phase, it is insufficient to evaluate intermediate process of design arithmetically with participating in design process. So the numerous changes of design after completion of design development cause a lot of loss to the design company. The designer arranges owner's requirements to prevent from this loss at the initial stage of schematic design phase systematically and lets owner and stakeholder to evaluate the value of schematic design to satisfy with owner's and stakeholder's requirements. If the evaluated value for schematic design is above a definite value index, the next design phase should be advanced. By this method, the design company can reduce the additional expenses remarkably by preventing with re-design which is occurred by not reflecting owner's intention or by changing owner's intention. Also the designer have the owner to evaluate the result of design and construction. The designer let the owner know whether the owner's requirement should well have been reflected on drawing or not. There is a strong point to be able to minimize the criticism which can be occurred after completion of construction by evaluating for owner's satisfactory degree and by having owner and designer confirm the result of design and construction arithmetically. This paper presents that the loss of design company can be minimized by going over at next step if the value is over a definite value index after evaluating value for each design from design process.

  • PDF

A Study on the Effect of Topside and Interface on Hull in Whole Ship Analysis of Ship Type Offshore Structure (Ship Type 해양 구조물 전선 해석 시 Topside와 Interface가 Hull에 미치는 영향 연구)

  • Seo, Joon-Gyu;Kang, Ho-Yun;Park, Jung-Ki
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.58 no.5
    • /
    • pp.314-321
    • /
    • 2021
  • In the existing whole ship analysis, topside was modeled as mass element. However recently, the topside is modeled as beam element due to the owner's requirement to improve the maturity of the whole ship FE model. To follow the owner'srequirement, detailed information for topside drawing and modeling, which may delay analysis schedule, is needed. However, it is hard to respond effectively to this matter due to the lack of study on the topside from the hull perspective. Therefore in this study, the effect of the topside on the hull is investigated when the topside is modeled as a mass element or beam element respectively. In addition, the interface modeling method is analyzed to verify modeling method used in the existing whole ship analysis. The results indicate that the interface and topside modeling method used in existing whole ship analysis are appropriate. This conclusion will be the technical basis for responding to owner's requirement about the topside modeling method.

Commissioning Model for CM Services Considering Project and owner Properties (프로젝트 및 발주자 특성을 고려한 CM업무 위탁모델)

  • Kang, Hyun-Koo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.632-636
    • /
    • 2007
  • These days, Construction industries are getting bigger, more specialized and complicated. Accordingly, the items of management is increased, also owner's organization is reduced. For this reason, various a method of construction management is introduced in the domestic construction industry. But introduction of construction management have caused increase cost because role duplication of managers. This role duplication is caused by confusion of trial and error, irrationality of system. And every construction project have peculiar properties, also owner's organization of project have various properties. This various properties is not reflected in the construction management , and the regimental method of construction management applied. In order to solving these problems, this study suggested the commissioning model for CM service reflected the properties of project and owner. This study have to selection of the critical service, service item of construction management and definition of owner's role through analysis of the properties of project, owner's capacity and requirement.

  • PDF

THE FEATURE CONSIDERATION AND PLAN FOR DEFINITION SYSTEMATIZATION OF CLIENT'S REQUIREMENT

  • Su-Kyung Cho;Chang-Hyun Shin;Jea-Sauk Lee;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.635-641
    • /
    • 2007
  • The construction starts its business by receiving the order from client and owner. The client presents requirements and related information so that the desired result can come out while the designer and the builder express and implement the building according to set objectives and goals of project based on information on project environment and presented requirements. Because the construction project makes decisions on such objectives at its early stage and previous stage becomes the situation for decision making of next stage as the computation to implement decisions get performed. Accordingly, this study has mentioned necessity of requirement analysis and systematization of construction project, analyzed the work of construction's early stage and resented a plan for objective of construction project requirement definition model in which requirements engineering has been applied and using it while making decisions on designing.

  • PDF

A Study on Developing Systems for Managing Information on Owner's Requirements in the Design Phase (설계단계에서의 발주자 요구사항 관리를 위한 정보관리 시스템 개발에 관한 연구)

  • Yoo, Seung-Yeun;Lee, June-Seong;Park, Jung-Dae;Jun, Joon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.126-135
    • /
    • 2008
  • The purpose of this study is to develop the efficient information system for managing owner's requirement(O/R) throughout the design phases. In order to derive an improvement, current status of O/R management both in domestic and foreign design company has been analyzed. Through the literature reviews and interviews with experts, the Information on design process and detailed activities were investigated. Based on the basic research, inputs, outputs and participants were defined and information flow diagram was drawn. O/R's were categorized according to comprehensive interviews with specialists, and a prototype system was suggested. Conducting systematized O/R management will improve the confidence of owners' role on design, reduce re-work in design tasks, and finally elevate design quality.

The Study of Synthetic Material Bush (Railko Bush) Application on Large Container Vessel (대형 컨테이너 선박의 합성수지계열 RAILKO BUSH 적용 연구)

  • Lim, Jae-Hun;Park, Kun-Woo;Kim, Kyung-Ho
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2008.09a
    • /
    • pp.46-53
    • /
    • 2008
  • Recently, the synthetic material stern tube bush has been applied by ship owner's requirement because the synthetic material has a merit. That is to say, when stern tube seal is damaged and sea water comes into stern tube, it can work without problem because of water lubricating property. However, the material also has a demerit of temperature rise problem when some factors meets on synthetic material, for example, not sufficient lubrication oil supply and not proper shaft alignment and so on. As known in the world, the RAILKO bush is rampant for synthetic material by some ship owner because of the above mentioned reason. However, the bush has several accidents on large container vessel. Unfortunately or fortunately our yard has a chance to apply the RAILKO bush owing to requirement of specific ship owner. Therefore, it is much more required to approach the accurate shaft alignment analysis. In line with this reason, we had a shaft alignment calculation considering hull deformation and hull flexibility (hull stiffness). Also, in the calculation, we had considered dynamic condition which is reflected he propeller thrust forces and moments and oil film stiffness on the shaft alignment calculation. According to he shaft alignment calculation, bearing slope was applied on the tern tube bush and was measured. The RAILKO bush should be applied the running in procedure according to maker's recommendation for performing the oil film on the bush surface. Finally, the vessels were delivered successfully without any problem with AILKO bush as shown on his paper.

  • PDF

Developing Response Plan for the Direct Buying System for SME's Construction Materials based on the Analysis of Material Procurement Management Load: Focused on the Owner Providing Public Apartment Housing (지급자재 조달관리부담 평가에 기초한 중소기업 공사용자재 직접구매제도 대응방안: 공공아파트를 공급하는 발주자를 중심으로)

  • Song, Sang-Hoon;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.4 no.4
    • /
    • pp.425-434
    • /
    • 2013
  • The Small and Medium Business Administration specified 123 construction materials mandatory to purchase directly and forced the public owners to provide the contractors with materials as required by related law. This study extensively reviewed various characteristics and management factors of the owner-providing materials consumed in the public apartment housing under Direct Buying System(DBS) from the public owner's perspective. Subsequently, the major managed materials were identified, and the proper response plan was developed along the material procurement process. The Procurement Management Load Indices (PMLI) of 43 materials were evaluated according to rating criteria with procurement path, project-specified level, user requirement level, supplier's responsibility, on-site work requirement, additional parts, and inspection standards. The tile and aluminum windows were classified in the group needing high-level procurement efforts to reduce the errors and ensure the efficiency. The accurate quantity estimation method, definite purchase details, management activity definition before and after production, additional quantity for rework, interference coordination were defined as the essential activities for effectively responding to DBS.