• 제목/요약/키워드: Overseas Construction Project

검색결과 220건 처리시간 0.026초

IEC 규격에 기반한 도시형자기부상열차 열차제어시스템의 시스템보증 및 안전성 평가 활동 (System Assurance and Safety Assessment Activities of Urban Marglev ATC Project based on IEC Standards)

  • 백영구;박희준;구중서;서도석;이기서
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1669-1679
    • /
    • 2010
  • Related to the on-going "Train Control System Project of Pilot Line Construction for Urban MAGLEV Train", activities by each phase shall be conducted to achieve SIL4 level and obtain safety certification from the Independent Safety Assessment(ISA), based on the IEC standards((IEC 62278/62279 and IEC 62425) for the first time in Korea. This thesis describes the introduction of IEC standards, system assurance activities (such as plan, analysis, test, verification and validation) in compliance with requirements management and project life-cycle and relations with the safety assessment activities; and certification activities (such as document reviews and audits) through system RAMS activities, software quality assurance activities and safety assessment, for the purpose of achieving a successful safety certification at the time of completing the project as system assurance activities including software and safety certification activities in order to acquire the safety certification for train control system which does not exist at all in domestic cases. It is believed that overall system safety assurance activities in this project will contribute to develop more upgraded products of the domestic train control system on the quality and safety point of view, find overseas markets and establish a bridgehead in the future.

  • PDF

국내 중재사례를 통한 주요 건설 클레임 예측 방안 (Forecasting the Effects of the Claims in the Korean Construction Industry)

  • 김지혜;임혜경;최재현
    • 한국건설관리학회논문집
    • /
    • 제17권5호
    • /
    • pp.35-44
    • /
    • 2016
  • 건설 프로젝트의 특성 상, 예측하기 어려운 리스크 인자에 노출되기 쉽고, 다양한 이해관계자들이 함께 동일 프로젝트를 수행하는 과정에서 발생하는 분쟁이 주요 리스크 인자로 인식된다. 다양한 분쟁은 주로 클레임 제기, 조정, 중재, 그리고 소송으로 나타나며 막대한 비용과 시간의 손실을 초래할 수 있다. 따라서 국내 건설기업의 건설 프로젝트 수행과정에서 발생하는 클레임, 분쟁의 유형과 원인을 도출하고, 각 원인의 영향도 분석을 통해 클레임, 분쟁관리에 대한 적극적인 대비가 필요하다. 본 연구는 국내 건설프로젝트에서 발생한 클레임, 분쟁 판례를 수집하여 유형과 원인에 따른 빈도와 영향도를 정량화 하고, 중요도 분석을 통해 주요 클레임 원인을 도출하였다. 도출된 주요 클레임 원인은 공사변경, 상대방의 부당한 행위, 공사 지연에 관한 클레임으로 해당 클레임 원인이 발생할 경우 클레임 비용에 대한 예측을 회귀 모형화 하였다. 주요 클레임 원인별 영향도 예측 결과 공사변경의 경우 전체공사비의 16.1%, 상대방의 부당한 행위는 전체공사비의 5.7%, 공사 지연은 전체공사비의 2.7%로 발생하는 것으로 분석되었다. 본 연구결과를 통해 국내 건설산업의 주요 클레임 요인을 도출하고, 클레임 비용을 예측함으로써 보다 적극적인 클레임 대비에 활용 될 수 있도록 하였고, 더 나아가 국내 건설기업의 프로젝트 관리 역량 평가 및 향상에 기여하고자 하였다.

건설산업 환경변화에 따른 건설정보화 개념요소 고찰 (Frameworks of Construction Information Systems under the Changing Industry Paradigms)

  • 주미희;정영수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.115-118
    • /
    • 2010
  • The concept of construction information systems (IS) is very comprehensive and subjective. Acronyms in relation to the construction IS may include BIM, CIC, IT, nD-CAD, ERP, CALS, KM and so on. These terminologies are used in a somewhat mixed way causing possible misunderstandings in research and practice of construction information systems. Moreover, ever-changing construction business environment has widely affected the roles and methods of utilizing construction IS. Examples of these changes are dissemination of alternative project delivery systems, global standardization under highly competitive overseas market, and advancement of information and communication technologies. In this context, the purpose of this paper is to propose a high-level framework for information systems in the construction industry. Several different concepts in the area of construction IS were investigated first in order to identify the major variables of the framework. Trends of research and real-world implementations were then analyzed to support the rationale of the variables. Finally, a framework was proposed by re-arranging the relevant issues. Findings of this paper indicate that different acronyms commonly share many similar concepts in their definitions, however, in each acronym, the motivations and approaches to implementing construction IS are very different. Different approach can provide maximum effectiveness, while overlaps may happen causing practical inefficiency.

  • PDF

THE INTRODUCTION METHOD OF TECHNOLOGY MANAGEMENT IN THE OIL AND GAS PLANT INDUSTRY

  • Doo Hee Lee;Young Woong Song;Hyoung Chul Lim;Yoon Ki Choi
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.249-258
    • /
    • 2007
  • Recently orders of projects in the field of oil and gas plants have increased due to rising oil prices and consumption. The markets of oil and gas plants are expanding into the Middle East area and all over the world. Because the oil and gas markets have a lot of overseas construction operations, competition among advanced companies is more important. However, companies in the period of growth have not had enough competitive powers of license in the design phase. Therefore, they are faced with difficulty of adopting the technology which is maximizing the effect of investments, and scheduling of a long-range plan. In order to achieve adequate technology management and competitive power, this study considers a long-range plan through an analysis of an appropriate introduction and the strategic planning process of technology management.

  • PDF

한국의 공업화건축 공법 도입활용과정 분석을 통한 3D 프린팅기술 개발 방향성 연구 (Discovering Applicable Lessons for '3D Printing R/D Project' Implementation Through Studying the Process of Adopting Overseas Industrialized Building Production Technological Knowhow in the Korean Context)

  • 이성민;이필원;조후영;이재헌
    • 한국공간구조학회논문집
    • /
    • 제17권4호
    • /
    • pp.59-68
    • /
    • 2017
  • This paper aims at finding some lessons applicable to successful implementation of 'The 3D Printing R/D Project' through both examining the process of adopting overseas industrialized housing production technological knowhow by home builders during the 1970's~1980's period and thereafter until now the various efforts to adjust the technologies efficiently to the Korea's unique situation. Some meaningful lessons can be summarized as follows; I) Deep understanding of 3DP technological know-why along with its inheritance, II) Readjusting of R/D period and goals(cf. Global leader Winsun's 15 years experiment), III) Restructuring for more collaborative R/D B&E system among participating researchers IV) Fostering 3DP expert-engineers and technicians from the early stage, V) Clearing legal barriers in users' adopting 3DP methods necessary, VI) Development of appropriate building material besides concrete. Therefore, it is highly recommended that the above-mentioned 6 lessons positively accepted and applied to the Research Implementation Plan in due course, especially by KICT consortium and KAIA under the guidance of Ministry of Land, Infrastructure and Transport.

철도 인프라 BIM 협업 전략에 관한 연구 - 싱가포르 사례 및 국내 전문가 설문조사를 기반으로 - (A Study on the Building Information Modeling Collaboration Strategy for Railway Infrastructure - Case Study and Survey -)

  • 김성아;김진만;신민호
    • 한국BIM학회 논문집
    • /
    • 제12권4호
    • /
    • pp.116-127
    • /
    • 2022
  • Building Information Modeling, which was applied mainly in the construction sector, is expanding to the road sector, and the government recently recommends preparing individual application guidelines considering the characteristics of detailed fields such as railways, ports, and complexes through BIM implementation guidelines. Compared to general construction projects, a lot of the works such as signals, electricity, and power, and the railway BIM 2030 roadmap has been presented to apply BIM to railway construction projects that require business consultation and work environment review with various local governments, and pilot projects are in operation. Unlike a general building, in which the construction begins after the detailed design is completed, in the railway project, the detailed design of other works proceeds along with the roadbed construction. Because construction and design work together, railways need to coordinate detailed engineering interfaces such as trajectories, signals, and power, and the application of BIM in design interface coordination has the advantage of maximizing the effectiveness of pre-review. Overseas railway construction projects actively used BIM to adjust design interfaces and had a collaboration process to modify BIM models and create construction details from the revised models through regular meetings with suppliers. Therefore, this study aims to derive the factors necessary for establishing a BIM collaboration environment based on a survey of practitioners as a preliminary step for establishing the BIM collaboration process of the railway construction project.

플랜트 공사 모듈러 공법 적용 의사결정을 위한 연구 - 모듈러 공법의 장·단점 및 적용 장벽에 대한 고찰 - (A Study for Selecting Modular Construction Method - Focus on Benefits and Barriers of Modular Method -)

  • 박찬영;김현진;원진우;장우식;한승헌
    • 한국건설관리학회논문집
    • /
    • 제17권4호
    • /
    • pp.12-19
    • /
    • 2016
  • 최근 생산성 향상의 필요성과 함께 시장 환경 변화에 따른 극오지 및 격오지 공사 수행의 필요성으로 인하여 플랜트 프로젝트에서의 모듈러 공법 적용이 확대 추세에 있다. 그러나 모듈러에 대한 실질적인 이해부족과 관련 시스템의 부재로 실제 프로젝트의 모듈러 공법 적용은 어려운 상황이다. 따라서, 본 연구에서는 사업 초기단계에 프로젝트의 시공 방식(Stick-Built, Modular) 결정을 지원할 수 있는 의사결정 모델을 제시하고자 하였다. 이를 위해 모듈러 적용의 이점과 장벽에 대한 분석을 실시하였고, 프로젝트 및 모듈러 공법의 특성과 사업초기단계 가용데이터를 고려하여 총 6개의 모듈러 공법 의사결정인자를 이용하는 의사결정 지원 모델을 개발하였다. 본 연구에서 제시하고 있는 의사결정 모델은 사업 초기 단계에서 가지고 모듈러 적용 가능성을 1차적으로 평가하였다는 점에서 기획 단계에서 플랜트 프로젝트의 모듈러 공법 적용을 고려하는 하나의 도구로써 활용이 가능할 것이라판 단된다.

수로의 기계화 시공의 필요성 (The need for mechanization in todays canal building program in korea and overseas)

  • Ha, Gordon P.wkins
    • 한국농공학회지
    • /
    • 제21권2호
    • /
    • pp.21-27
    • /
    • 1979
  • 옛날에는 인력(人力)으로 수로(水路)를 만들었으나 기계(機械)의 발달(發達) 및 임금(賃金)의 상승(上昇)에 따라 기계화(機械化) 시공(施工)이 경제적(經濟的)으로 유리(有利)하게 되었으며 앞으로 이런 현상은 더욱 가속(加速)될 것이다. 수로(水路)의 기계시공(機械施工)은 굴착, 정리(整理), 포장(鋪裝)으로 나누어지며 굴착은 수로(水路)의 단면(斷面)을 대략적인 형태(形態)로 만드는 것이고 정리(整理)는 포장(鋪裝)을 할수 있게 .수로(水路)의 사면(斜面)과 바닥을 정확한 모양으로 다듬는 것이다. 정리(整理)의 정밀도(精密度)에 따라 포장용(鋪裝用) 재료(材料)의 양(量)이 크게 좌우(左右)된다. 자동정리기(自動整理機)는 종래의 것이 $20{\sim}40mm$의 표면(表面) 요철(凹凸)이 생기게 하나 현재(現在)는 ${\pm}6mm$의 정도(程度)까지 가능(可能)하다. 현재(現在)의 자동기계(自動機械)는 1인(人)의 운전원(運轉員)이 1일(日) $1,000{\sim}2,000m^3$까지 굴착 정리(整理)를 할수 있다. 콘크리트 포장(鋪裝)은 인력(人力)비빔으로 할때 1일(日) $2m^3/day$의 양(量)도 어렵고 로타리 믹서를 써도 $20m^3/day$ 정도(程度)이나 콘크리트 뱃치 푸랜트로 하면 $100{\sim}500m^3\day$가 가능하다. 그러나 대형(大型) 포장기(鋪裝機)를 사용(使用)하면 1일(日) 대형(大型) 수로(水路) $300{\sim}1,000m$를 포장(鋪裝)할수 있다. 수로(水路)의 기계시공(機械施工)은 콘크리트 포장(鋪裝) 두께를 균일(均一)하게 하므로써 콘크리트 비용(費用)을 최대(最大)로 절감(節減)하며 포장(鋪裝)의 품질(品質)을 좋게한다. 수로(水路)의 기계시공외(機械施工外)에도 많은 새로운 기계(機械)들이 사용(使用)되고 있으며 이러한 기계(機械)의 활용(活用)이 기술발전(技術發展)에 크게 기여하게 될 것이다.

  • PDF

해외 건설공사 공기지연사건의 합리적 대응을 위한 계약조건 리스크 평가 방법 (Risk Assessment Model for the Delay Protocol in the Conditions of Contract of International Construction Projects)

  • 이황구;신동우;김경래;차희성;김영재
    • 한국건설관리학회논문집
    • /
    • 제18권6호
    • /
    • pp.65-77
    • /
    • 2017
  • 최근 대형 건설회사의 해외시장 비중 확대와 함께 해외 프로젝트에서의 공기지연에 따른 경영 손실에 대한 이슈가 지속적으로 제기되고 있다. 일반적으로 대형 프로젝트의 수행 과정에서 변경은 필연적으로 발생한다. 대부분의 변경은 공기지연과 연결되기 때문에 변경으로 인하여 공기연장이 필요한 경우 건설사는 계약에서 정한 기준에 따라 공기지연을 관리해야 공기지연에 따른 리스크에 효과적으로 대응할 수 있다. 공기지연을 유발하는 변경에 대한 계약적 대응이 부족할 경우 클레임이 해결되지 않고 분쟁으로 확대되는 경우가 많다. 프로젝트 초기 단계에 계약에서 요구하는 공기지연 관리 절차와 방법을 분석하는 것이 중요하나 이에 대한 방법 및 도구를 제시하지 못하고 있었다. 본 논문에서는 국내 주요 건설사들의 공정관리 실무 및 해외 공사에서의 클레임 및 분쟁사례에 대한 고찰을 통해 문제를 제시하고 해외 건설 계약조건상에 포함된 공기지연 관리 리스크를 평가할 수 있는 방법을 제시하였다. 공기지연의 합리적 대응과 관련된 계약조건상의 리스크 평가 틀을 제시하기 위하여 FIDIC Red Book(1999), PSSCOC(2014) 및 SIA 9th Edition(2010) 등 국제 표준 계약조건 뿐만 아니라 ARAMCO 및 QP를 포함한 해외 대형 발주자의 표준계약조건에 나타나 있는 공기지연 관리 요건 및 수준을 검토하여 전체 7개 영역, 62개 항목으로 구성된 계약조건 리스크 평가모델을 제안하였다. 계약조건 리스크 평가 모델은 계약조건상의 공기지연리스크 확인을 위한 구조적 틀을 제공하며 개별 리스크 항목별 표준적인 수준을 제시함으로써 해당 프로젝트의 리스크 수준을 확인하고 이에 효과적으로 대응할 수 있는 단초를 제공한다. 제안된 모델의 유효성 검증을 위하여 실제 제안한 모델을 실제 프로젝트에 적용하여 그 효과를 입증하였다.

자산담보부 단기사채를 활용한 해외발전사업 수주확대방안 (Business Growth Strategy with Asset Backed Short Term Bond for Overseas IPP Opportunities)

  • 김준호;문윤재;이재헌
    • 플랜트 저널
    • /
    • 제11권1호
    • /
    • pp.30-38
    • /
    • 2015
  • 본 연구는 최근 도입된 단기사채를 통해 한국수출입은행의 대외채무보증과 연계하여 자산유동화 구조에 접목한 자산담보부 단기사채의 금리를 추정하고 해외 투자개발형 민자발전사업의 수주 확대를 위한 프로젝트파이낸스의 한 방안으로 이용할 수 있는지에 대한 것이다. 회사채 신용등급 AA-부터 BBB+까지 건설사 자산담보부 단기사채와 비교한 결과, 자산 유동화 구조와 접목한 한국수출입은행의 대외채무보증부 자산담보부 단기사채는 금리 경쟁력이 있고, 프로젝트의 자기자본수익률이 개선됨을 확인할 수 있었다. 특히, 본 금융구조는 회사채 등급이 낮은 시공사에 적용할수록 더 높은 자기자본수익률 확보가 가능함을 알 수 있었다. 이를 통해, 경쟁력 있는 자산담보부 단기사채 금융조건은 수요 창출 및 수익성 확보는 물론 우리기업의 해외 투자개발형 민자발전사업 수주확대에 기여할 것으로 기대된다.

  • PDF