• 제목/요약/키워드: Overseas Construction Project

검색결과 220건 처리시간 0.03초

건설 프로젝트 생산성 정보 플랫폼 구축방안 기초연구 (A preliminary study of the construction project productivity data platform development)

  • 강고운;이규;이교선
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.296-297
    • /
    • 2018
  • Due to the decrease in infrastructure investment and stagnation of overseas construction, it is concerned the instability of the construction market. Enhancing the Korean construction competitiveness, productivity improvement could be the breakthrough. In addition, defining construction contents utilizing virtual reality technology is drawing attention along with the trend of the fourth industrial revolution technology development toward the labor productivity improvement. This study conducted a survey to figure out the present state of the productivity management in field and comprehend the factors influence on construction productivity for further Korean construction productivity data platform.

  • PDF

BAT Korea Factory 건설 프로젝트의 CM 적용사례 연구 - Cost Management 사례를 중심으로 - (A Study Of the Construction Management Applied to BAT Korea Factory Construction Project in Korea)

  • 김덕곤;권오경;김종훈
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.48-57
    • /
    • 2003
  • BAT 공장 건설 프로젝트는 외국 발주자에게 한국 CM업체의 관리능력을 입증한 대표적인 프로젝트라고 한 수 있다. 본 프로젝트는 CM 사의 전문적인 관리를 통하여 외국의 공장건설에 비하여 $15\%$ 절감된 금액으로 공사를 완공할 수 있었으며, 철저한 공정관리로 공기를 단축하는 한편 준공 후 1개월도 안되어 생산이 이루어지는 성공적인 결과를 달성할 수 있었다. 본 프로젝트의 성공요인(Key Success Factors)은 CM사의 탁월한 관리능력이라고 할 수 있으나 더욱 중요한 성공요인은 사업관리의 모든 권한을 CM사에 위임하는 발주자의 신뢰에서 기인되었다고 할 수 있다. 본 연구는 "One Stop Shop" 개념의 CM 적용을 통하여 사업의 전단계에 걸친 전문적인 관리활동과 발주자와 CM사간의 신뢰의 중요성을 입증한 프로젝트에 적용된 Cost Management, Contract Management, Value Engineering 등의 활동을 고찰하였다. 본 연구를 통하여 민간시장의 CM활성화에 비하여 적용에 어려움을 주고 있는 공공시장에도 CM이 활성화 될 수 있는 계기를 되기를 바란다.

  • PDF

공공건설공사의 분쟁해결조항 개선방안 연구 (Proposal of Improvement Devices for Construction Dispute Resolution System in Public Works)

  • 이지연;신규철;이재섭
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.437-441
    • /
    • 2004
  • 선진국에서는 건설분쟁을 소송 외 분쟁해결방법(ADR)에 의한 해결이 보편화 되어 있다. 최근 우리나라에서도 공공건설공사에서의 계약상대자간의 클레임이 증가하는 추세이다. 그러나 현행 공공공사 도급계약의 분쟁해결 조항은 분쟁 해결절차가 명시되지 않아 적시의 클레임 제기에 어려움이 있고, 소송과 중재를 동시에 규정한 선택적 중재조항으로 되어있어 중재에 의한 분쟁해결의 걸림돌이 되고 있다. 이에 국내외의 분쟁해결제도 및 절차를 검토하고 판례를 연구하여 선택적 중재조항에 대한 해설방법을 고찰하여 공사계약일반조건 분쟁해결조항의 개선방안을 제시하고자 한다.

  • PDF

COMPARATIVE ANALYSIS OF BIM ADOPTION IN KOREAN CONSTRUCTION INDUSTRY AND OTHER COUNTRIES

  • Jongsung Won;Ghang Lee;Chijoo Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.587-592
    • /
    • 2009
  • Construction companies in Korea have shown interest in BIM (Building Information Modeling) even if late, adopted it, and applied it to several projects. But, it is hard to figure out the status of BIM implementation. Thus, this study is to figure out the status of BIM implementation in Korea by surveying major construction companies in Korea and comparing with similar surveys abroad. The survey result shows that only 11 companies in Korean construction industry adopted BIM. The clash check (73%) was mostly used among various BIM functions and other functions were used less than 30%. As of 2008, only 8 construction companies have used BIM in 27 projects and thus, Korean companies are in the BIM introduction period. Therefore, successful introduction of BIM is required by benchmarking the BIM introduction process of overseas construction industries

  • PDF

A Comparative Analysis of Korean and Central African Construction Laborers Job Consciousness

  • Bulunda, Mbale Michael;Bitamba, Bauma Frigeant;Jean, jihoon;An, Sung-Hoon
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.748-749
    • /
    • 2015
  • Recently Korean construction companies have started launching into the world beyond the Middle East to Southeast Asia. Launching into Central Africa has emerged as the blue chips; therefore, it is needed to study the local people and culture of Central Africa. However, launching Korean construction companies into Central Africa may cause some problems between Korean and African construction laborers' thinking. Therefore this comparative analysis of Korean and Central African construction laborers' job consciousness can provide to Korean companies a minimum understanding of these kinds of problems to expect while launching into Central Africa and so using this analysis as a basic data to supply them.

  • PDF

경량전철 차량시스템 생명주기와 시스템엔지니어링 적용기술개발에 관한 고찰 (Study on life cycle of LRT systems and technology development applied system engineering)

  • 이성권;전서탁;정계용;김재진;정수영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.1629-1635
    • /
    • 2011
  • Because LRT project is large infrastructure projects investing enormous budget and required continuous maintenance after construction, it is the global trend to perform business in terms of life-cycle from the initial construction, operation to disposal. It is very important LRT to manage interfaces efficiently and to integrate vehicle, civil, track, electricity, communications, signals, operations, facilities organically. Global companies of the railway developed countries including Europe are getting orders a large rail project and preempting the world market based on engineering technology. But, domestic LRT systems engineering is the subcontracting level to the lack of practical skills and experience. Thus, technology securement is very urgent for the independence of systems engineering technology and overseas advance based turnkey. In this paper, we are going to study applicable systems engineering technology focusing on LRT system based on international standard ISO/IEC 15288.

  • PDF

IPA 기반의 공적개발원조 건설사업 역량 분석 (Analyzing the ODA Construction Project Competence based on IPA)

  • 김화랑;정민철;장현승
    • 한국건설관리학회논문집
    • /
    • 제22권5호
    • /
    • pp.66-72
    • /
    • 2021
  • 우리나라 중소건설기업의 해외건설시장 진출 활성화 방안으로 공적개발원조(ODA) 건설사업 참여를 제안할 수 있다. 이를 위해 해당 사업수행 시 필요한 역량 항목을 도출하였으며 이에 관한 설문조사 수행과 중요도-현재 역량 분석을 수행하였다. 총 32개의 역량 항목 중 24개 항목이 중요도 대비 현재 역량 수준이 낮은 것으로 분석되어 향후 원활한 관련 사업수행을 위한 기업 차원의 역량 강화가 시급한 것으로 나타났다. 세부적으로는 '건축 관련 기본법, 계약관리 방법, 국제경영협상' 등 계약관리 관련 항목에 관한 우선적 역량 강화방안 수립의 모색이 필요할 것으로 판단된다.

Fundamental Investigation of Knowledge Management System for a Plant

  • Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.375-380
    • /
    • 2009
  • Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.

  • PDF

Development of a Collaboration Recommendation Model between Global Consulting Firms using Link Prediction

  • Yu, Young-su;Koo, Bon-sang
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.381-386
    • /
    • 2020
  • Global construction and engineering consulting (E&C) firms are actively seeking entry into overseas markets based on loan projects from multilateral development banks to provide a basis for entry into overseas markets and sustainable growth. Bids on these projects are competitive between global top firms in terms of the technical level and price due to the limited number of projects; thus, developing a successful partnership to complement competence has become an essential element to win bids. In this regard, many studies have analyzed enterprises through characteristic analyses or the derivation of influential factors from the past social networks based on social network analysis (SNA). However, few studies have been conducted to reflect the process of changes to analyze collaborative relationships. Thus, this study aims to identify dynamic changes in past social networks and develop a model that can predict changes in the relationships between E&C firms based on similarities or differences between firms, presenting a methodology to target firms for appropriate collaboration. The analysis results demonstrate that the sensitivity of the developed prediction model was 70.26%, which could accurately predict 163 out of 232 actual cooperative cases.

  • PDF

해외 대형건설공사 공기지연클레임의 공기연장기간 입증방법 (A Study on Substantiation Methodology for Extension of Time in International Mega-Project Claims)

  • 김영재;김태경;조덕상;이황구
    • 한국건설관리학회논문집
    • /
    • 제16권3호
    • /
    • pp.165-176
    • /
    • 2015
  • 국내 건설산업의 침체가 장기화됨에 따라 대형 건설업체를 중심으로 국내사업 비중이 줄고 상대적으로 해외사업의 비중이 증가되고 있으며, 중견 건설업체 및 특수기술을 가지고 있는 전문건설업체의 해외프로젝트 수행이 확대되고 있다. 이러한 해외건설공사 수행의 중요성이 부각되고 있는 최근 상황에서 해외 대형건설공사에서 일반적으로 발생되고 있는 공기지연에 대한 적극적 대응이 성공적 프로젝트관리의 중요한 이슈로 제기되고 있다. 본 연구에서는 해외 대형프로젝트의 공기지연 클레임의 공기연장기간을 입증하는데 활용되는 기존 공기연장기간 분석방법의 실무적 적용상의 문제점을 제기하였다. 제시된 문제점을 해결하기 위한 개선방법으로 1)클레임의 명확성을 확보하기 위해 지연영향력 분석이전에 주요지연(dominant delay)를 선정하는 절차를 갖는 개선개념과 2)Time Impact Analysis을 시행을 위한 분석구간의 설정방법에 대한 개선개념을 제시하였다. 본 연구에서 제시한 공기연장기간 분석방법을 실제 해외 대형건설공사의 공기지연 클레임 사례에 적용함으로써, 제안한 개선안의 실무적용에 대한 유효성을 입증하였다. 국내의 해외 대형공사 공기지연 클레임을 담당하고 있는 기술자들이 본 연구에서 제안한 방법들을 공기지연 클레임 추진 및 관련자 협상 등과 같은 실무 추진에 참고하고 활용함을 통해, 공기연장기간 입증관련 클레임의 협상실패로 인한 리스크와 후속적인 분쟁 및 회사의 경영손실 리스크를 최소화 하는데 도움이 될 것이라고 사료된다.