• Title/Summary/Keyword: Outfitting

Search Result 75, Processing Time 0.02 seconds

Test Platform Development of Vessel's Power Management System Using Hardware-in-the-Loop Simulation Technique

  • Lee, Sang-Jung;Kwak, Sang-Kyu;Kim, Sang-Hyun;Jeon, Hyung-Jun;Jung, Jee-Hoon
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.6
    • /
    • pp.2298-2306
    • /
    • 2017
  • A PMS (Power Management System) controls vessel's power systems to improve the system efficiency and to protect a blackout condition. The PMS should be developed with considering the type and the capacity of the vessel's power system. It is necessary to test the PMS functions developed for vessel's safe operations under various sailing situations. Therefore, the function tests in cooperation with practical power systems are required in the PMS development. In this paper, a hardware-in-the-loop (HIL) simulator is developed for the purposes of the PMS function tests. The HIL simulator can be more cost-effective, more time-saved, easier to reproduce, and safer beyond the normal operating range than conventional off-line simulators, especially at early stages in development processes or during fault tests. Vessel's power system model is developed by using a MATLAB/SIMULINK software and by communicating between an OPAL-RT's OP5600 simulator. The PMS uses a Modbus communication protocol implemented using LabVIEW software. Representative tests of the PMS functions are performed to verify the validity of the proposed HIL-based test platform.

A Study on the Development and Strength Evaluation of the Mooring Fittings with Big Capacity (선박용 대형 계류장비의 개발과 강도 평가)

  • Kim, Young-sig;Kim, Ul-nyeon;Kim, Mi-hee;Kim, Kyoung-youn
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2017.10a
    • /
    • pp.1-7
    • /
    • 2017
  • It has been developed large mooring fittings having the capacity of 160 tons and 180 tons installed on 170K LNG FSRU. The finite element analysis for the mooring fittings was carried out in order to check the structural integrity and to confirm satisfaction of the rule requirements. The 3 kinds of mooring fittings such as chock, bollard and universal fairlead are selected for FE analysis and load test. According to the FE analysis results, all the stress levels satisfied the acceptance criteria guided by the IACS UR A2, ISO standard, ship rules and OCIMF. As test results under design load, no structural defects were found.

  • PDF

Third Wave of Gas Management System in LNG Carrier - VaCo System (LNG 운반선에서의 신개념 증발 가스 처리 시스템 - VaCo 시스템)

  • Choi, Jung-Ho;Yoo, Hong-Sung;Yoo, Kyung-Nam;Heo, An;Lee, Dou-Yeong;Lyy, Sung-Kak
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2007.09a
    • /
    • pp.89-93
    • /
    • 2007
  • The Boil-off gas (BOG) generation during the voyage is inevitable since Natural Gas (NG) in normally liquefied below -160 degree C in atmosphere condition and small heat ingress due to relatively hot outside keeps evaporating continuously. The one of major issue in LNG carriers is to handle generated BOG from cargo tank. The generated BOG affects to increase the cargo tank pressure and Gas Management System (GMS) for LNG carriers is closely related to cargo tank pressure maintenance. Economically, BOG is generally used as fuel in LNG carrier. Newly developed GMS for LNG carrier in boiler propulsion system, VaCo System, not only accomplish automatic control in GMS but also ensure safer operation.

  • PDF

A Study on the Implementation of Coexistent Reality Technology for Ship Outfitting Inspection (선박 의장 검사를 위한 공존현실 기술 적용에 관한 연구)

  • Ha, Yeon-Chul;Kim, Jin-Woo;Kim, Goo;Shin, Hyun-Shil
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.21 no.1
    • /
    • pp.13-20
    • /
    • 2020
  • In shipyards, internal materials are assembled after designing and manufacturing each ship's block. Internal material assembly means the installation of parts and equipment except ship's body. In this process, if the assembly of pipes and equipment existing in the block is not done correctly during the assembly between blocks, this causes a lot of costs. In addition, even if the assembly of the internal materials already completed, the production efficiency of the ship is reduced due to rework when problems such as space arrangement of the internal materials occurs. Therefore, this study introduces space arrangement and inspection system before and after hull outfitting work based on coexistence reality technology using 3D design drawing to solve these problems. The various coexistence reality algorithms and inspection systems developed and introduced in this study are based on AR service, which has never been introduced in Korea. So it will be widely applicable to various manufacturing industries using design drawings such as automobiles and architectures as well as ship building process.

Optimizing Design for Rudder Horn (Rudder Horn 최적화 설계 방안)

  • Park, Sung-Geun
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2006.09a
    • /
    • pp.77-80
    • /
    • 2006
  • In recent booming up of the ship building market, the supplying of large scale casting is difficult to keep the delivery schedule for ship yard because of the restrict manufacturer in Korea. And also, it is main cause to rise-up the cost of castings. This paper describes the outline of guidance of optimizing design for Rudder Horn Casting to reduce the risk of the delivery problem to ship yard.

  • PDF

A Study on the Total, Particle Size-Selective Mass Concentration of Airborne Manganese, and Blood Manganese Concentration of Welders in a Shipbuilding Yard (조선업 용접작업자의 공기 중 총 망간 및 입경별 망간 농도와 혈중 망간농도에 관한 연구)

  • Park, Jong Su;Kim, Pan Gyi;Jeong, Jee Yeon
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.25 no.4
    • /
    • pp.472-481
    • /
    • 2015
  • Objectives: Welding is a major task in shipbuilding yards that generates welding fumes. A significant amount of welding in shipbuilding yards is done on steel. Inevitably, manganese is present in the base metals being joined and the filler wire being used and, consequently, in the fumes to which workers are exposed. The objective of this work was to characterize manganese exposure associated with work area, total and particle size-selective mass concentration, and compare the mass concentrations obtained using a three-piece cassette sampler, size-selective impactor sampler and blood manganese concentrations. Materials: All samples were collected from the main work areas at one shipbuilding yard. We used a three piece cassette sampler and the eight stage cascade impactor sampler for the airborne manganese mass concentration of total and all size fractions, respectively. In addition, we used the results of health examination of workers sampled for airborne manganese. Results: The oder of high concentration of airborne manganese in shipbuilding processes was as follows; block assembly, block erection, outfitting installation, steel cutting, and outfitting preparation. The percentages of samples that exceeded the OES of the ministry of employment and labor by the cassette sampling method was 12.5%, however 59.1% of sampled workers by the impactor sampling method exceeded the TLV of the ACGIH. Conclusions: Even though the manganese concentrations in blood of workers exposed to higher airborne manganese concentration were higher than among those exposed to lower concentrations, there was no difference in blood manganese concentrations among work duration. The data analyzed here by characterizing size-selective mass concentrations indicates that the inhaled manganese of welders in shipbuilding yards could be mostly manganese-containing respirable particle sizes.

A Study on the Structural Characteristics and Shape of Outfitting Equipment Support in a 300K DWT Crude Oil Tanker

  • Jeong, Kwang-Woon;Chung, Han-Shik;Jeong, Hyo-Min;Ji, Myoung-Kuk;Kim, Jeong-Tae
    • Journal of Power System Engineering
    • /
    • v.18 no.6
    • /
    • pp.180-185
    • /
    • 2014
  • Due to the larger and high-speed vessels recently constructed, output and speed of the engines for propulsion or power generation is increasing. These high-power and high-speed engine of the ship is becoming as a major contributor causing excessive noise and vibration. Other fittings as well as equipment installed on board, it makes equipment failure or other defect by resonance. This causes a lot of M/H(Man Hour) for repairs and the reliability of the company is invading even be negative because the clients give much comment. Thus, it's being studied for any fittings installed on board to maintain the safe operation and to prevent any problem during the performance in any operating conditions. In this study, it was investigated to solve these problems for the supports of the various fittings for easy installation-related support that each type of intensity and shape and manufacturing method using structural analysis program(DNV Nauticus Hull 3D Beam). Namely, it would be applied to the very large crude carriers in consideration of mechanics of materials of the support equipment by providing the fact that dynamics analysis of the structural characteristics of the equipment and the support of the production installation is easy and productivity can be high standards for geometry and thereby to simplify the analysis task to design changes at the same time and to minimize the reinforcement for the supports.

Integration of multi-functional system using relational database and graphical user interface (관계형데이타베이스와 그래픽사용자 인터페이스를 이용한 설계시스템의 통합화)

  • 이종갑;서승완;김준호
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1994.04a
    • /
    • pp.519-526
    • /
    • 1994
  • In the large and multifunctional engineering system, the heterogeneous computer system situation is inevitable. Accordingly a lot of integration efforts are being made to comply with the industrial requirement of productivity. In this paper, a practical concept of integration is introduced through the development of a prototype system for ship outfitting design which is a typical example of large/multi-functional application system. On the development of the prototype system, three points are considered as a practical concept-which are integration of database, integration of application programs, and system-user interface. The relation model based commercial database management system(RDBMS) is used to build the project integrated database, and the graphical user interface tool(OSF/Motif) on X-window system is used for the integration of application programs and the user interface.

Automation System for the Outfitting Hole (의장홀 자동화 시스템)

  • Ruy, Won-Sun;Ko, Dae-Eun;Yu, Yun-Sik
    • Proceedings of the KAIS Fall Conference
    • /
    • 2011.12b
    • /
    • pp.375-378
    • /
    • 2011
  • 본 논문에서는 선체 설계 시에 의장 장비의 설치를 위해서 시공되는 의장홀이 생성되는 과정 및 이에 관련해 업무부서 간에 발생되는 각종 프로세스에 관해서 알아본다. 의장홀의 설계는 설치되어야 하는 의장 장비와 이미 설계되어 있는 선체 구조물을 바탕으로 의장 부서에서 이루어지지만, 선체 구조물에 직접 시공은 각종 제한 조건의 검토가 필수적이며 충분한 고려 후에 선체 부서에서 수행된다. 의장 설비의 특성상 해당 작업은 설계 및 생산과정에서 빈번하고 반복적으로 발생되고 선체 설계에 있어서 큰 병목현상을 발생시킨다. 본 논문에서는 의장홀 시공에 필요한 다양한 프로세스와 정보의 흐름을 자동화하여 조선 설계 및 생산의 효율성을 향상시키는데 기여 하고자 한다.

  • PDF