• Title/Summary/Keyword: Outage Rate

Search Result 189, Processing Time 0.028 seconds

Reliability analysis of the switch installation in the main feeder and in the radial/loop lateral feeders in distribution system (간선 및 분기선의 개폐기 설치 효과 분석(I))

  • Cho, Nam-Hun;O, Jae-Hyeong;Lee, Heung-Ho;Ha, Bok-Nam
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.79-82
    • /
    • 2002
  • The addition of switches to a distribution feeder does, in general, increase reliability by decreasing the duration of the outage of many to the customers on the feeder. To cover its service area so that feeder-level delivery reaches sufficiently close to all customers, feeders typically split their routes many times, in what is often called a lateral feeder. It is interesting to note, however, that the effectiveness of a switch is very much dependent on the types of lateral feeder. The types of lateral are classified into two types. The first is loop lateral feeder that can connect its load to an adjacent feeder through a tie line in case that a fault occurs in its feeder and it is laid out so that every feeder has complete fault backup through re-switching of its loads to other sources like a main feeder. The second is the radial lateral feeder cannot connect its load to an adjacent line, no provision is made for contingency backup of feeders. There are no other circuits in the radial lateral feeder form which to restore power. In this study, we evaluate the effectiveness of a switch installation between on the radial and loop lateral feeders to increase reliability by decreasing the duration of the outage. These results can help power utility to design the switch layouts on the radial and loop lateral feeder system.

  • PDF

Analysis and Countermeasure of Lighting Fault on 765kV Transmission Lines (765kV 송전선로 낙뢰고장 분석 및 대책)

  • Min, Byeong-Wook;Lee, Sung-Hak;Kim, Ho-Ki;Kang, Yeon-Woog;Bang, Hang-Kwon;Park, Jae-Ung
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.337-338
    • /
    • 2008
  • KEPCO has built, for the first time in the world, 765㎸ double circuit transmission lines which use vertically arranged phase conductor, while 765㎸ transmission lines in other countries are single circuit lines and use horizontally arranged phase conductor. System operating voltage, switching overvoltage, and lightning overvoltage were considered in determining the air gap. Recently, however, lightning outage rate of some 765㎸ transmission lines in KOREA shows that it is more than what is expected. Lightning fault of 765㎸ transmission lines is mostly single phase grounding fault which can be reclosed. But it still needs to be carefully managed, for the bulk system like 765㎸ transmission lines have huge effects on whole power system. This paper introduces analysis and countermeasure of KEPCO's 765㎸ transmission line lightning outage.

  • PDF

Analysis of the Switch Installation Criteria by Increasing Operating Capacity in Distribution Line (배전선로 운전용량 상향에 따른 개폐기 설치 기준 분석)

  • Jo, Nam-Hun;Ha, Bok-Nam;Lee, Heung-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.6
    • /
    • pp.290-295
    • /
    • 2002
  • The present assignment in installing the number of switches for distribution line was made on the basis of a normal feeder capacity 7,000kVA in KEPCO(Korea Electric Power Corporation), Korea. But the normal capacity is revised to 10000kVA in 1998. Even increasing limit of the operating capacity of the distribution lines enables us to give some benefit for the operation flexibility and investment cost of the distribution system. It is disadvantageous in the viewpoint of supply reliability. In distribution systems, switches are equipped to improve the reliability of distribution systems by minimizing the outage section due to fault and maintenance. Utility generally improves the reliability by minimizing the length of outage section, which is caused by fault and maintenance, through switch equipment on distribution system. In order to cope with the changes such as operation capacity, it is necessary to study whether the present criteria is reasonable or not, also to confirm whether the present criteria of installing switches in line is improved or not. In this study, we proposes the number of switch per feeder on the basis of present operation capacity in distribution system.

A New Reduction Method of the Uplink Information for an Adaptive Modulation and Coding OFDM/FDD System (다중 사용자를 위한 적응형 OFDM/FDD 시스템의 상향링크 정보 축소 방안)

  • 장일순;유병한;조경록
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.29 no.2A
    • /
    • pp.140-146
    • /
    • 2004
  • In this paper we proposed the reducing method of feedback information for transmitting of adaptable data rate in multi-user OFDMA/FDD systems. In order to transmit downlink channel information to Base-Station(BS) through the limited uplink control channel, the proposed algorithm exploits the channel variation level which describes the similarity among the adjacent clusters and uses just one modulation and coding scheme(MCS) level representing channel information of all clusters'. We investigated the performance in single cell environment. It has a similar overhead for feedback information with conventional algorithm and has better performance in that bandwidth efficiency and outage probability than the conventional algorithms.

Distributed Multi-Hop Multicast Transmission Scheme for Low-Power and Low-Complexity Wireless Devices (저 전력 저 복잡도 무선 기기를 위한 분산적인 다중 홉 멀티 캐스트 중계 기법)

  • Ko, Byung Hoon;Jeon, Ki-Jun;Lee, Seong Ro;Kim, Kwang Soon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.40 no.5
    • /
    • pp.931-937
    • /
    • 2015
  • Distributed relay scheme for wireless ad hoc multi-hop multicast network composed of low-power and low-complexity wireless devices with high density is proposed. The proposed relay scheme is shown to be better than flooding, which is the distributed relay scheme applied to ZigBee, in the outage probability and the multicast transmission rate by simulations.

Evaluation of Optimal Transfer Capability in the Haenam-Jeju HVDC System Based on Cost Optimization

  • Son Hyun-Il;Kim Jin-O;Lee Hyo-Sang;Shin Dong-Joon
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.3
    • /
    • pp.303-308
    • /
    • 2005
  • The restructure of the electrical power industry is accompanied by the extension of the electrical power exchange. One of the key pieces of information used to determine how much power can be transferred through the network is known as available transfer capability (ATC). The traditional ATC deterministic approach is based on the severest case and it involves a complex procedure. Therefore, a novel approach for A TC calculation is proposed using cost optimization in this paper. The Jeju Island interconnected HVDC system has inland KEPCO (Korean Electric Power Corporation) systems, and its demand is increasing at the rate of about $\10[%]$ annually. To supply this increasing demand, the capability of the HVDC system must be enlarged. This paper proposes the optimal transfer capability of the HVDC system between Haenam in the inland and Jeju in Cheju Island through cost optimization. The cost optimization is based on generating cost in Jeju Island, transfer cost through Jeju-Haenam HVDC system and outage cost with one depth (N-1 contingency).

On the Performance of All-optical Amplify-and-forward Relaying with a Backup Radio-frequency Link Over Strong Atmospheric Turbulence and Misalignment Fading

  • Altubaishi, Essam Saleh
    • Current Optics and Photonics
    • /
    • v.5 no.2
    • /
    • pp.114-120
    • /
    • 2021
  • Free-space optical (FSO) communication is considered to be a potential solution to congestion in the radio-frequency spectrum and last-mile-access bottleneck issues in future cellular communication networks, such as 5G and beyond. However, FSO link performance may degrade significantly due to irradiance fluctuations and random temporal fluctuations from atmospheric turbulence. Therefore, in this work the main objective is to reduce the effect of the atmospheric turbulence by considering a multihop FSO communication system with amplify-and-forward relaying supported by a radio-frequency (RF) link, which form a hybrid FSO/RF communication system. The FSO link is assumed to follow the gamma-gamma fading model, which represents strong turbulence. Also, the RF link is modeled by a Rayleigh distribution. The performance of the considered system, in terms of the outage probability and average bit-error rate (BER), is investigated and analyzed under various weather conditions and pointing errors. Furthermore, the effect of the number of employed relay nodes on the performance of the system is investigated. The results indicate that the considered system reduces outage probability and average BER significantly, especially for low channel quality. Finally, the closed-form expressions derived in this work are compared to the results of Monte Carlo simulations, for verification.

A Study on the Application and Verification of Statistical Techniques for Calculating the Life of Electric Power Facilities (전력설비의 수명계산을 위한 통계적 분석기법의 활용 및 검증에 대한 연구)

  • Lee, Onyou;Kim, Kang-Sik;Lee, Hongseok;Cho, Chongeun;Kim, Sang-Bong;Park, Gi-Hun
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.1
    • /
    • pp.9-14
    • /
    • 2022
  • Social infrastructure facilities such as production, transportation, gas and electricity facilities may experience poor performance depending on time, load, temperature, etc. and may require maintenance, repair and management as they are used. In particular, in the case of transformers, the process of managing them for the purpose of preventing them from failing is necessary because a failure can cause enormous social damage. The management of transformers should consider both technical and economic aspects and strategic aspects at the same time. Thus, it applies the Asset Management concept, which is widely used in the financial industry as an advanced method of transformer management techniques worldwide. In this paper, the operation and power outage data were secured for the asset management of the transformer for distribution, and the asset status was analyzed. Analysis of asset status using actual operation and power outage data is essential for assessing the statistical life and failure rate of the facility. Through this paper, the status of transformer assets for arbitrary A group distribution was analyzed, and the end of life and replacement life were calculated.

Reliability Analysis of AC traction System Substation by using Bayes' Theory (베이즈 이론을 이용한 교류전철변전소의 신뢰도 분석)

  • Kim, Yong-Hyun;Koo, Bon-Hui;Cha, Jun-Min;Kim, Hyung-Chul
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.445-450
    • /
    • 2008
  • The primary role of traction power systems is to provide reliable and continuous electrical energy to satisfy traction loads. AC traction substation transforms power from generation company and supply the power to the electric railway power line. Forced outage rate(FOR) of the equipment of substation should be used in the evaluation. This paper proposes the fast and easy way to evaluate by using Bayes' theory when a new equipment is added to the existing substation facility.

  • PDF