• 제목/요약/키워드: Optimal maintenance method

검색결과 290건 처리시간 0.037초

Bayesian Method for Sequential Preventive Maintenance Policy

  • Kim Hee Soo;Kwon Young Sub;Park Dong Ho
    • 한국신뢰성학회:학술대회논문집
    • /
    • 한국신뢰성학회 2005년도 학술발표대회 논문집
    • /
    • pp.131-137
    • /
    • 2005
  • In this paper, we propose a Bayesian approach to determine the adaptive preventive maintenance(PM) policy for a general sequential imperfect PM model proposed by Lin, Zuo and Yam(2000) that PM not only reduces the effective age of the system but also changes the hazard rate function. Assuming that the failure times follow Weibull distribution, we adopt a Bayesian approach to update unknown parameters and determine the Bayesian optimal sequential PM policies. Finally, numerical examples of the optimal adaptive PM policy are presented for illustrative purposes.

  • PDF

LNG-FPSO Topside 장비를 위한 보전시스템 개발을 위한 사례 연구 (Case Study for Development of Maintenance System for Equipment of LNG-FPSO Topside)

  • 이순섭;김종왕
    • 한국해양공학회지
    • /
    • 제28권6호
    • /
    • pp.533-539
    • /
    • 2014
  • A maintenance system for an offshore plant uses an optimal maintenance method, process, and period based on operation information data and economic evaluation techniques. Maintenance is performed after one or more indicators show that equipment is going to fail or that equipment performance is deteriorating. A maintenance system is based on the use of real-time data to prioritize and optimize the LNG-FPSO topside equipment resources.

고속철도차량 1차 구동장치에 대한 완전분해정비의 최적 주기 평가 (Evaluation of Optimal Time Between Overhaul Period of the First Driving Devices for High-Speed Railway Vehicle)

  • 정진태;김철수
    • 한국산학기술학회논문지
    • /
    • 제16권12호
    • /
    • pp.8700-8706
    • /
    • 2015
  • 고속철도차량 동력대차의 1차 구동장치는 모터 감속기와 견인전동기로 구성한다. 모터 감속기와 견인전동기는 기계적으로 일체형 결합 구조이지만, 상이한 기술 요구사항으로 인하여 이들의 완전 분해정비 주기는 서로 다르다(모터 감속기의 완전 분해정비 주기: $1.8{\times}10^6km$, 견인전동기의 완전 분해정비 주기: $2.5{\times}10^6km$). 따라서 불필요한 정비 횟수를 감소하기 위하여 신뢰성 중심 유지보수 관점에서 최적의 완전 분해정비 주기의 산정이 중요하다. 본 연구에서는 실제 유지보수 정비이력으로부터 두 구성품들에 대한 고장 결함나무 분석을 수행하고 각 하부부품들의 치명도를 고려한 고장률을 각각 평가하였다. 두 구성품에 대한 최적의 동일한 완전분해 정비주기는 기존의 총 예방정비 비용을 감소하기 위하여 유전자 알고리즘으로 부터 얻었다. 이 알고리즘에서 각 개체를 구성하는 유전자는 최소 예방 정비주기이며, 이의 조합으로 구성된 세대별 개체의 적합도함수는 총 정비비용의 역수로 공식화하여 얻는다. 최소공배수에 의한 방법은 기존 대비 4%만 감소하지만, 유전자 알고리즘에 의한 최적의 동일 완전분해 정비주기는 225만km로서 기존 방법의 총비용과 비교하여 약 14% 감소하였다.

Optimal Software Release Policy for Random Cost Model

  • Kim, Hee-Soo;Shin, Mi-Young;Park, Dong-Ho
    • Communications for Statistical Applications and Methods
    • /
    • 제12권3호
    • /
    • pp.673-682
    • /
    • 2005
  • In this paper, we generalize the software reliability growth model by assuming that the testing cost and maintenance cost are random and adopt the Bayesian approach to determine the optimal software release time. Numerical examples are provided to illustrate the Bayesian method for certain parametric models.

Optimal maintenance scheduling of pumps in thermal power stations through reliability analysis based on few data

  • Nakamura, Masatoshi;Kumarawadu, Priyantha;Yoshida, Akinori;Hatazaki, Hironori
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1996년도 Proceedings of the Korea Automatic Control Conference, 11th (KACC); Pohang, Korea; 24-26 Oct. 1996
    • /
    • pp.271-274
    • /
    • 1996
  • In this paper we made a reliability analysis of power system pumps by using the dimensional reduction method which over comes the problem due to unavailability of enpugh data in the actual systems under many different operational environments. Hence a resonable method was proposed to determine the optimum maintenance interval of given pump in thermal power stations. This analysis was based on an actual data set of pumps for over ten years in thermal power stations belonged to Kyushu Electric Power Company, Japan.

  • PDF

퍼지집합이론을 이용한 발전기보수유지계획수립 (Maintenance Scheduling of Generation System by Fuzzy Set Theory)

  • 박정제;최재석;백웅기;차준민
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.127_128
    • /
    • 2009
  • A new technique using a search method which is based on fuzzy multi-criteria function is proposed for GMS(generator maintenance scheduling) in order to consider multi-objective function. Not only minimization of probabilistic production cost but also maximization of system reliability level are considered for fuzzy multi-criteria function. To obtain an optimal solution for generator maintenance scheduling under fuzzy environment, fuzzy multi-criteria relaxation method(fuzzy search method) is used. The practicality and effectiveness of the proposed approach are demonstrated by simulation studies for a real size power system model in Korea in 2010.

  • PDF

퍼지이론을 이용한 유연한 발전기보수유지계획 수립에 관한 연구 (A Study on the Flexible Generator Maintenance Scheduling using Fuzzy Theory)

  • 김홍식;문승필;최재석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 C
    • /
    • pp.1104-1107
    • /
    • 1999
  • A new technique using search method based on fuzzy multi-criteria function is proposed fur flexible generator maintenance scheduling. Minimization of probabilistic production cost, maximization of system reliability level and air pollution are considered fur fuzzy multi-criteria function. To obtain an optimal solution for generator maintenance scheduling under fuzzy environment fuzzy multi-criteria relaxation method(fuzzy search method) is used. The practicality and effectiveness of the proposed approach are demonstrated by the simulation results of the real size model system of KEPCO-1997 SYSTEM.

  • PDF

외부 프리스트레싱을 이용한 RC 중공슬래브교의 최적보강 (Optimal Strengthening in RC Hollow Slab Bridges Using External Prestressing)

  • 박경식;최세휴
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제13권6호통권58호
    • /
    • pp.204-211
    • /
    • 2009
  • 본 연구에서는 RC 중공슬래브 교량의 내하력을 향상시키기 위해 외부 프리스트레싱을 이용한 보강방법을 제시하였다. 효과적인 보강을 위해 Queen-post 형식과 King-post 형식이 고려되었으며, 축차무제 약 최소화 기법(SUMT)를 이용하여 목표 내하율을 달성하기 위한 최적의 형상과 긴장력을 구하였다. 최적보강을 위한 목적함수는 재료비용을 무차원화한 비용함수로 구성하였으며, 제약조건은 시방서 규정과 내하율을 고려하여 형성하였다. RC 중공슬래브 교량의 보강을 실행한 후 그 결과를 분석하여 제안된 방법의 타당성을 제시하였다.

최적경로탐색문제를 위한 인공신경회로망 (An Artificial Neural Network for the Optimal Path Planning)

  • 김욱;박영문
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1991년도 하계학술대회 논문집
    • /
    • pp.333-336
    • /
    • 1991
  • In this paper, Hopfield & Tank model-like artificial neural network structure is proposed, which can be used for the optimal path planning problems such as the unit commitment problems or the maintenance scheduling problems which have been solved by the dynamic programming method or the branch and bound method. To construct the structure of the neural network, an energy function is defined, of which the global minimum means the optimal path of the problem. To avoid falling into one of the local minima during the optimization process, the simulated annealing method is applied via making the slope of the sigmoid transfer functions steeper gradually while the process progresses. As a result, computer(IBM 386-AT 34MHz) simulations can finish the optimal unit commitment problem with 10 power units and 24 hour periods (1 hour factor) in 5 minites. Furthermore, if the full parallel neural network hardware is contructed, the optimization time will be reduced remarkably.

  • PDF

성능보증제도를 적용한 일반국도 유지보수공사 시범사업 (Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance)

  • 임재규;김용주;김명일;이재준
    • 한국도로학회논문집
    • /
    • 제20권1호
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.