• Title/Summary/Keyword: Optimal Operation

Search Result 2,830, Processing Time 0.034 seconds

Determination of Optimal Operation Water Level of Rain Water Pump Station using Optimization Technique (최적화 기법을 이용한 빗물펌프장 최적 운영수위 결정)

  • Sim, Kyu-Bum;Yoo, Do-Guen;Kim, Eung-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.7
    • /
    • pp.337-342
    • /
    • 2018
  • A rain water pumping station is a structural countermeasure to inland flooding of domestic water generated in a urban watershed. In this study, the optimal operation water level of the pump with the minimum overflow was determined based on the opinions of the person in charge of the operation of the rain water pump station. A GA (Genetic Algorithm), which is an optimization technique, was used to estimate the optimal operation water level of the rain water pump station and was linked with SWMM (Ver.5.1) DLL, which is a rainfall-runoff model of an urban watershed. Considering the time required to maximize the efficiency of the pump, the optimal operating water level was estimated. As a result, the overall water level decreased at a lower operating water level than the existing water level. For most pumps, the lowest operating water level was selected for the operating range of each pump unit. The operation of the initial pump could reduce the amount of overflow, and there was no change in the overflow reduction, even after changing the operation condition of the pump. Internal water flooding reduction was calculated to be 1%~2%, and the overflow occurring in the downstream area was reduced. The operating point of the pump was judged to be an effective operation from a mechanical and practical point of view. A consideration of the operating conditions of the pump in future, will be helpful for improving the efficiency of the pump and to reducing inland flooding.

Optimal design and operation of water transmission system (상수도 송·배수시스템의 최적 설계 및 운영 모형 개발)

  • Choi, Jeongwook;Jeong, Gimoon;Kim, Kangmin;Kang, Doosun
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.12
    • /
    • pp.1171-1180
    • /
    • 2018
  • Korea's water transmission system is operated by the nonpressure flow method that flows from highlands to lowlands due to the nature of Korea with many mountainous areas. In order to store water in the highlands, the water pumps are installed and operated. However, In this process, a lot of electrical energy is consumed. therefore, it is necessary to minimize the energy consumption by optimizing the size and operation schedule of the water pumps. The optimal capacity and operation method of the water pump are affected by the size of the tank (distributing reservoir). Therefore, in order to economically design and operate the water transmission system, it is reasonable to consider both the construction cost of the water pump and the tank and the long-term operation cost of the water pump at the step of determining the scale of the initial facilities. In this study, the optimum design model was developed that can optimize both the optimal size of the water pump and the tank and the operation scheduling of the water pump by using the genetic algorithm (GA). The developed model was verified by applying it to the water transmission systems operated in Korea. It is expected that this study will help to estimate the optimal size of the water pump and the tank in the initial design of the water transmission system.

A Study on Optimal Operation Method of Multiple Microgrid System Considering Line Flow Limits (선로제약을 고려한 복수개의 마이크로그리드 최적운영 기법에 관한 연구)

  • Park, Si-Na;An, Jeong-Yeol
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.7
    • /
    • pp.258-264
    • /
    • 2018
  • This paper presents application of a differential search (DS) meta-heuristic optimization algorithm for optimal operation of a micro grid system. The DS algorithm simulates the Brownian-like random-walk movement used by an organism to migrate. The micro grid system consists of a wind turbine, a diesel generator, a fuel cell, and a photovoltaic system. The wind turbine generator is modeled by considering the characteristics of variable output. Optimization is aimed at minimizing the cost function of the system, including fuel costs and maximizing fuel efficiency to generate electric power. The simulation was applied to a micro grid system only. This study applies the DS algorithm with excellence and efficiency in terms of coding simplicity, fast convergence speed, and accuracy in the optimal operation of micro grids based on renewable energy resources, and we compared its optimum value to other algorithms to prove its superiority.

Optimal Operation Schedule of Semi-Fixed PV System and Its Effect on PV Power Generation Efficiency (반고정식 PV 시스템의 운영 스케줄 도출 및 그에 따른 발전 효율 변화 고찰)

  • Kwak, In-Kyu;Mun, Sun-Hye;Huh, Jung-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.37 no.6
    • /
    • pp.69-77
    • /
    • 2017
  • The amount of solar irradiation obtained by a photovoltaic (PV) solar panel is the major factor determining the power generated by a PV system, and the array tilt angle is critical for maximizing panel radiation acquisition. There are three types of PV systems based on the manner of setting the array tilt angle: fixed, semi-fixed, and tracking systems. A fixed system cannot respond to seasonal solar altitude angle changes, and therefore cannot absorb the maximum available solar radiation. The tracking system continually adjusts the tilt angle to absorb the maximum available radiation, but requires additional cost for equipment, installation, operation, and maintenance. The semi-fixed system is only adjusted periodically (usually seasonally) to obtain more energy than a fixed system at an overall cost that is less than a tracking system. To maximize semi-fixed system efficiency, determining the optimal tilt angle adjustment schedule are required. In this research, we conducted a simulation to derive an optimal operation schedule for a semi-fixed system in Seoul, Korea (latitude $37.5^{\circ}$). We implemented a solar radiation acquisition model and PV genereation model on MATLAB. The optimal operation schedule was derived by changing the number of tilt angle adjustments throughout a year using a Dynamic Algorithm. The results show that adjusting the tilt angle 4 times a year was the most appropriate. and then, generation amount of PV system increased 2.80% compared with the fixed system. This corresponds to 99% compared to daily adjustment model. This increase would be quite valid as the PV system installation area increased.

Optimal Containership Size by Way of Total Shipping Cost Analysis (컨테이너선의 총 운항비용 분석을 통한 노선별 최적선형 도출)

  • Kim Tae-Won;Han Yu-Nam;Nam Ki-Chan;Kwak Kyu-Seok
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.11a
    • /
    • pp.245-251
    • /
    • 2004
  • Determination the optimal containership size is the most important factor for competitiveness if shipping companies. Accordingly, the objective if this research is determining the optimal containership size by service routes. Total shipping cost is calculated at the ground if capital cost, vessel operation costs, voyage costs, port charge and miscellaneous cost for 'Europe-Far East', 'Far East-North America' and 'Europe-Far East-North America' Services. Finally, the optimal containership size was utilized through total shipping cost, slot quantity if containership and average throughput by containership.

  • PDF

A Study on Optimal Electric Load Distribution and Generator Operating Mode Using Dynamic Programming (동적계획법을 이용한 발전기의 운전모드 및 최적부하 배분에 관한 연구)

  • H-H Yoo
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.26 no.3
    • /
    • pp.313-319
    • /
    • 2002
  • Since the oil crisis in 1970, a great deal of effort has been made to develop automatic electric load sharing systems as a part of the efforts to save energy. A large scale electric generating system composes more than two generators whose characteristics may be different. When such a system is operated individually or in parallel, the lagrange multiplier's method has difficulty in achieving optimal load distribution because generators usually have the limitations of the operating range with inequality constraints. Therefore, a suitable operating mode of generators has to be decided according to the selection of the generators to meet electric power requirements at the minimum cost. In this study, a method which solves the optimal electric load distribution problem using the dynamic programming technique is proposed. This study also shows that the dynamic programming method has an advantage in dealing with the optimal load distribution problem under the limitations of the operating range with inequality constraints including generator operation mode. In this study, generator operating cost curve of second order equation by shop trial test results of diesel generators are used. The results indicate that the proposed method can be applied to the ship's electric generating system.

An Optimal Energy Storage Operation Scheduling Algorithm for a Smart Home Considering Life Cost of Energy Storage System

  • Yan, Luo;Baek, Min-Kyu;Park, Jong-Bae;Park, Yong-Gi;Roh, Jae Hyung
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.4
    • /
    • pp.1369-1375
    • /
    • 2017
  • This paper presents an optimal operation scheduling algorithm for a smart home with energy storage system, electric vehicle and distributed generation. The proposed algorithm provides the optimal charge and discharge schedule of the EV and the ESS. In minimizing the electricity costs of the smart home, it considers not only the cost of energy purchase from the grid but also the life cost of batteries. The life costs of batteries are calculated based on the relation between the depth of discharge and life time of battery. As the life time of battery depends on the charge and discharge pattern, optimal charge and discharge schedule should consider the life cost of batteries especially when there is more than one battery with different technical characteristics. The proposed algorithm can also be used for optimal selection of size and type of battery for a smart home.

Optimal Cutting Condition of Tool Life in the High Speed Machining by Taguchi Design of Experiments (다구찌 실험 계획법을 이용한 고속가공에서 공구수명 조건의 최적화)

  • Lim, Pyo;Yang, Gyun-Eui
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.5 no.4
    • /
    • pp.59-64
    • /
    • 2006
  • High Speed Machining(HSM) reduces machining time and improves surface accuracy because of the high cutting speed and feedrate. Development of HSM makes it allowable to machine difficult-to-cut material and use small-size-endmill. It is however limited to cutting condition and tool material. In the machining operation, it is important to check main parameter of tool life and select optimal cutting condition because tool breakage can interrupt progression of operation. In this study, cutting parameters are determined to 3 factors and 3 levels which are a spindle speed, a feedrate and a width of cut. Experiment is designed to orthogonal array table for L9 with 3 outer array using Taguchi method. Also, it is proposed to inspect significance of the optimal factors and levels by ANOVA using average of SN ratio for tool life. Finally, estimated value of SN ratio in the optimal cutting condition is compared with measured one in the floor shop and reduction of loss is predicted.

  • PDF

Optimal Dispatch and Reserve Pricing Reflecting Opportunity Cost (기회비용을 반영한 최적급전과 예비력 가격설정)

  • Kim, Jong-Deoc;Bae, In-Su;Kim, Jin-O
    • Journal of Energy Engineering
    • /
    • v.15 no.4 s.48
    • /
    • pp.229-234
    • /
    • 2006
  • Electric energy is too difficult to manage realtime for irregular change of load because of non-storage. In specially, operation of reserve is ancillary service to supply stably to defend large troubles in electric power system. But whole of electric power system brings to economical loss because of reserve operation. Therefore optimal reserve quantity and optimal reserve price are necessary in order to minimize loss. In this paper, we have presents optimal dispatch and reserve price consideration of opportunity cost.

An Optimal Conjunctive Operation of Water Transmission Systems from Multiple Sources with applying EPAnet and KModSim Model (KModSim 모형(模型)에 의한 도시지역(都市地域) 다중수원(多衆水源) 송수관망간(送水管網間) 최적(最適) 연계(連繫) 운영(運營) 연구(硏究))

  • Ryu, Tae-Sang;Cheong, Tae-Sung;Ko, Ick-Hwan;Ha, Sung-Ryong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.500-504
    • /
    • 2008
  • The objective of this paper is to evaluate the feasibility of using an optimization model as a effective way to search conjunctive operation scheme to meet two conditions; one is to minimize the electric cost for pumping and another is to meet the water demand for satisfying customers. The feasibility is confirmed as comparing the best combinations of pumps between multi-regional water supply networks from multiple sources which are obtained through an optimization modeling and EPAnet modeling. KModsim model, a network optimization model, was used to determine conjunctive operation scheme in the pipe system. KModsim, based on Lagrangian Relaxation algorithm, is useful for modeling network system and obtaining simultaneously pump combination and water allocation with given input option such as energy unit cost supplying from a source into a consumer, operating pumping combination. This study develops the procedure of determining optimal conjunctive operation scheme with using KModsim model. As a study region, the water supplying systems of the Geojae-city in the Geongsang Namdo Province was selected and investigated. The EPAnet hydraulic simulation result(Ryu et al, 2007, KSWW) gave input data for optimization model; energy unit price(won/$m^3$), water service available area etc.. It was assured that the combination of pump operation through optimum conjunctive operation is to be optimum scheme to obtain the best economic water allocation with comparison to the hydraulic simulation result such as electric cost and pump combination cases. The results obtained through the study are as follows. First, It was found that a well-allocated water supply scheme, the best combination of pump operation through optimum joint operation, promises to save the electric cost and satisfy all operational goals such as stability and revenues during the period. Second, an application of KModSim, a network model, gave the amount of water allocation from each source to a consumer with consideration of economic supply. Finally, in a service area available to supply through conjunctive operation of existing inter-regional water supply networks within short distance, a conjunctive operation is useful for determining each transmission pipeline's service area and maximizing the effectiveness of optimizations in pumping operation time.

  • PDF