• Title/Summary/Keyword: Optimal Maintenance Personnel

Search Result 10, Processing Time 0.031 seconds

A Study on the Optimal Allocation of Maintenance Personnel in the Military Emergency Maintenance System Considering the Property of Impatience (Impatience 특성을 고려한 군 긴급정비시스템 정비인력 최적할당 연구)

  • Kim, Sungwoo
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.24 no.4
    • /
    • pp.449-456
    • /
    • 2021
  • Impatience characteristics are an important factor to be considered in the defense field, which is sensitive to time, but there are not many cases applied. In addition, due to the difficulty of analysis that must consider various probabilistic factors (breakdown/maintenance distribution, impatience characteristics, etc.), military decision makers consider only simple data (number of occurrences per year, maintenance time, etc.) Therefore, in this study, a model capable of analyzing the performance of the emergency maintenance system for determining the appropriate size and organization of military and civilian maintenance personnel was presented in consideration of impatience characteristics and probabilistic factors. And through numerical analysis, the appropriate size of the military and civilian emergency maintenance teams was analyzed. This study is significant in that it can improve readiness of operational power and prevent waste of defense budget through efficient operation of the military's emergency maintenance system.

A Study on the Optimal Allocation of Maintenance Personnel in the Naval Ship Maintenance System (해군 함정 정비체계 최적 정비인력 할당 모형 연구)

  • Kim, Seong-Woo;Yoon, Bong-Kyoo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.3
    • /
    • pp.1853-1862
    • /
    • 2015
  • Naval maintenance system carries out repairs of battle ships. Korean Navy has four maintenance stations to maximize the readiness of the battle ships. Since each station can provide different services according to characteristics(specific size of ships, type of maintenances) and the maintenance ability of stations is predetermined, it has been one of complex problems for the Korean Navy to find the optimal resource allocation. We investigate the operation of the stations from the perspective of the human resource allocation which plays crucial role in the performance of the maintenance stations. Using a queueing model and optimization technique, we present a way to derive the optimal personnel allocation which minimize the waiting number of battle ships at each station, leading to the improvement of the military readiness in the Korean Navy.

Aviation Operators' Response Plan to Overcome the Crisis in the Aviation Industry Caused by COVID-19 (COVID-19로 인한 항공 산업의 위기를 극복하기 위한 항공업계의 대응 방안)

  • Lim, In-kyu
    • Korean journal of aerospace and environmental medicine
    • /
    • v.30 no.3
    • /
    • pp.91-94
    • /
    • 2020
  • The coronavirus infectious disease-19 (COVID-19) pandemic has had a profound impact on the aviation industry. In order to overcome this crisis, airlines have made their efforts in various fields. Therefore, we tried to summarize these efforts of airlines. It is also essential to keep aircraft that have been in landing for a long time in optimal condition. In this paper, we tried to find out about efforts to maintain landing aircraft and maintenance of personnel. Through such constant care, airlines will be able to quickly respond to increasing aviation demand when the infectious disease situation is stabilized in the future. Finally, airlines and passengers must make several efforts to ensure that passengers are free from COVID-19 while traveling by air. These include general precautions to prevent infection, separation of airline personnel and passengers, changes in seat assignments and in-flight services, periodic aircraft disinfection, and prevention of in-flight infections.

Research on optimal cost calculation for efficient maintenance of offshore wind farms (해상풍력단지의 효율적인 유지보수를 위한 최적 비용 산출 연구)

  • Hui-Seok Gu;In-Cheol Kim;Man-Bok Kim;Man-Soo Choi
    • Journal of Wind Energy
    • /
    • v.14 no.3
    • /
    • pp.61-68
    • /
    • 2023
  • This paper aims to perform optimal operation and maintenance with an integrated monitoring system for offshore wind platforms. Based on the wind direction and wind speed data of existing wind farms, a monitoring system was established along with weather and weather data to maximize the operational efficiency of wind farms. Compared to wind power on land, offshore wind power is difficult to maintain due to weather, logistics and geographical limitations. Therefore, economic analysis of actual operation and maintenance is essential for large-scale offshore wind farms. In this paper, the availability of offshore wind farms was analyzed by using personnel resources, parts inventory, Crew Transfer Vessel (CTV) and Specialized service Operation Vessel (SOV) etc. before the actual operation and maintenance of wind farms. A comparative analysis was conducted to determine the optimum operating efficiency and economical maintenance costs.

A Study on the Location of Bus & Truck Automobile Maintenance Company (상용자동차 정비업체의 입지선정에 관한 연구)

  • Kim, Ju-Yong;Jo, Eun-Hyeon;Lee, Dong-Hyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.4
    • /
    • pp.23-30
    • /
    • 2019
  • Automobiles are largely divided into passenger cars with less than five passengers and commercial vehicles such as construction machines, trucks, mixers, special lorries, and large buses. Automobile maintenance companies are also divided into passenger cars and commercial vehicles. Because commercial vehicles are the livelihood vehicles of individual carriers engaged in cargo transportation, passenger transportation, and construction, fast and accurate maintenance is important. Access to the expressway is also important because the car is large and uses highways. In addition, the time required for troubleshooting is long, so sufficient space must be secured for parking the vehicle, and ease of entry and exit of the vehicle in the maintenance shop should be fully considered. For this reason, commercial vehicle maintenance companies have higher initial investment costs than car maintenance companies, and it is difficult to supply and maintain maintenance personnel. Therefore, it is necessary to carefully examine and analyze various related factors for successful commercial vehicle maintenance company selection. However, most existing commercial vehicle maintenance companies often choose their location based on the empirical judgment of the founder, the customs and the case, without a clear analysis. In this study, we show how to derive the location selection factors to be considered when establishing professional maintenance company for commercial vehicles and to select the optimal location by using AHP (Analytic Hierarchy Process) method.

Optimal inspection frequency to mitigate the risk of building system failure

  • Au-Yong, Cheong Peng;Ali, Azlan Shah;Ahmad, Faizah;Chua, Shirley Jin Lin
    • Structural Engineering and Mechanics
    • /
    • v.64 no.3
    • /
    • pp.347-352
    • /
    • 2017
  • The poor maintenance practice increases the possibility of system failure. Subsequently, the consequences of failure fall on the aspects of output, safety and healthy, environmental integrity, system quality, and customer satisfaction. Conditionbased maintenance is seen as a potential strategy to improve performance. Whereby, the key success factor of this maintenance strategy is identified as the system inspection. This study aims to investigate the association between system breakdown rate and frequency of inspection. A mixed method approach is implemented by distributing questionnaire and interviewing for data collection. Subsequently, descriptive analysis, correlation analysis and regression are adopted to analyse the collected data from 100 respondents and the results are validated with interview data of 10 interviewees. The research result establishes significant relationship between the system breakdown rate and the frequency of inspection. Additionally, the result of regression analysis confirms that the frequency of inspection is the significant predictor of system breakdown rate. Planning of accurate inspection frequency is crucial to secure the system performance. Hence, the research signifies the importance to carry out regular inspection towards the building systems and components. As a recommendation, the maintenance personnel should assess the risk criticality of the building systems. Then, continuously monitor the condition of critical building systems; regularly inspect the condition of non-critical building systems and randomly inspect all of them.

A Study on the Development of Oxygen Cluster Ion Generator for Sterilization of Bio Clean Room(BCR) (Bio Clean Room(BCR)의 멸균을 위한 산소 클러스터이온 발생 장치 개발에 관한 연구)

  • Park, Dong-Il;Chung, Kwang-Seop;Kim, Young-Il;Kim, Sung-Min
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.25 no.1
    • /
    • pp.7-13
    • /
    • 2013
  • Bio Clean Room(BCR) and pharmaceutical product manufacturing facilities require careful assessment of many factors, including HVAC, controls, room finishes, process equipment, room operations, and utilities. Flow of equipment, personnel, and product must also be considered along with system flexibility, redundancy, and maintenance shutdown strategies. It is important to involve designers, operators, commissioning staff, quality control, maintenance, constructors, validation personnel, and the production representative during the conceptual stage of design. Critical variables for room environment and types of controls vary greatly with the clean space's intended purpose. It is particularly important to determine critical parameters with quality assurance to set limits and safety factors for temperature, humidity, room pressure, and other control requirements. In this paper, oxygen cluster ion equipment was utilized in order to enhance the indoor air quality and to prevent the airborne infection of ward in hospital. Moreover, the performance test of the equipment was also performed in order to develop the optimal sterilization system of BCR using the equipment.

국가지하수 관측소의 장기수위관측자료를 활용한 관측주기 결정 연구

  • 김규범;김정우;원종호;이명재;이진용;이강근
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2003.09a
    • /
    • pp.199-201
    • /
    • 2003
  • The monitoring effectiveness not only depends on the effectiveness of the network, but also the costs of the network. Generally the costs of the monitoring network are mainly on the equipment and personnel; the implementation and maintenance; the observation and sample connection; the sample analysis; and the data storage and processing. The cost of the monitoring network can be expressed as a function of monitoring frequency because the monitoring method can be an automatic or a manual measurement. To determine the sampling frequency of subsidiary groundwater monitoring stations, time series data of national groundwater monitoring stations were used. The proposed optimal sampling frequency for subsidiary groundwater monitoring station is about 7 to 20 days and the average frequency is about 2 weeks.

  • PDF

A Study on the Optimum Operating Cost of Driveless LRT System (무인운전 경량전철의 최적 운영비 산출에 대한 연구)

  • Chung, Su-Young;Lee, Jong-Seong;Cho, Jin-Hwan;Ahn, Young-Hwan;Baek, Seung-Heon
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.2051-2057
    • /
    • 2008
  • This paper is a feasibility study on the calculation of operating cost in regards to the overall operation following the completion of a number of LRT lines currently in progress. Owing to the absence of operating experience in driveless LRT system at home, the difficulties lie in the assumption of the optimal operating budget applying domestic real situation. Nevertheless, with 34 years of accumulated operating experience in heavy rail transit system, Seoul Metro, the nation's biggest urban rail transit operator, performs O&M consultancy services for several on-going projects along with every effort to acquire know-how where the appropriateness of the cost estimation as a required deliverable is reviewed and a more efficient way is provided. The main focus of this study is to seek a method to calculate the optimal amount of operating expenses as well as a cost-effective alternative for possible weaknesses from the standpoint of the operator. The body of this paper discusses the five issues such as personnel cost, overhead, maintenance cost, additional purchase price, alternative investment fee from a more macroscopic point of view, and the conclusion deals with the adequacy of the reason for selection of institutions with various operating know-how.

  • PDF

Evaluation of Primary Coolant pH Operation Methods for the Domestic PWRs (국내 PWR의 일차냉각재 pH 운전방법의 평가)

  • Paek, Seung-Woo;Na, Jung-Won;Kim, Yong-Eak;Bae, Jae-Heum
    • Nuclear Engineering and Technology
    • /
    • v.24 no.1
    • /
    • pp.52-62
    • /
    • 1992
  • Radioactive nuclides deposited on out-of-core surface after the radiation in the core by the transport of corrosion products (CRUD) through the primary coolant system in PWR which is the major plant type in Korea, are leading sources of radiation exposure to plant maintenance personnel. Thus, the optimal chemistry operation method is required for the reduction of radiation exposure by the corrosion products. This study analysed the actual water chemistry operation data of four operating domestic PWRs. And in order to evaluate the coolant chemistry operation data, a computer code which can calculate the activity buildup in the various chemistry conditions of PWR coolant was employed. Through the analysis of comparison between the activity buildup of actual water chemistry operation mode and that of assumed Elevated Li operation mode calculated by the computer code, it was found that the out-of core radioactivity can be reduced by diminishing the deposition of corrosion products on the core in case that the Elevated Li operation mode is applied to the coolant chemistry operation of PWR. And the higher coolant pH operation was shown to have the advantage of the reduction of out-of-core activity buildup if the integrity of system structural materials and fuel cladding is guaranteed.

  • PDF