• 제목/요약/키워드: Operational Maintenance Cost

검색결과 110건 처리시간 0.025초

A Study of Zero Energy Building Verification with Measuring and Model-based Simulation in Exhibition Building

  • Ha, Ju-wan;Park, Kyung-soon;Kim, Hwan-yong;Song, Young-hak
    • Architectural research
    • /
    • 제20권3호
    • /
    • pp.93-102
    • /
    • 2018
  • With the change in Earth's ecosystems due to climate change, a number of studies on zero energy buildings have been conducted globally, due to the depletion of energy and resources. However, most studies have concentrated on residential and office buildings and the performance predictions were made only in the design phase. This study verifies the zero-energy performance in the operational phase by acquiring and analyzing data after the completion of an exhibition building. This building was a retention building, in which a renewable energy system using a passive house building envelope, solar photovoltaic power generation panels, as well as fuel cells were adopted to minimize the maintenance cost for future energy-zero operations. In addition, the energy performance of the building was predicted through prior simulations, and this was compared with actual measured values to evaluate the energy performance of the actual operational records quantitatively. The energy independence rate during the measurement period of the target building was 123% and the carbon reduction due to the energy production on the site was 408.07 tons. The carbon reduction exceeded the carbon emission (331.5 tons), which verified the carbon zero and zero-energy performances.

장비 설계 시 정비복잡도를 활용한 현실적인 초기 정비시간 및 정비도(MTTR) 예측방법 (A Practical Method for Predicting Initial Maintenance Time To Repair (MTTR) Using Maintenance Complexity in Equipment Design)

  • 신상희;이학재;황성국;김무영;권기상
    • 한국산학기술학회논문지
    • /
    • 제20권9호
    • /
    • pp.247-254
    • /
    • 2019
  • 최근 군수장비를 설계함에 있어 개발 초기부터 장비의 신뢰도, 정비도, 정비시간 등 운용 유지에 대한 많은 관심을 보이고 있다. 그렇기 때문에 사용자 및 개발자 모두 정비시간을 고려한 설계에 대한 중요성을 강조한다. 본 논문에서는 설계 초기에 기존 방식인 MIL-HDBK-470A에서 제공하는 표준 정비 시간이 아닌, 장비의 접근 복잡도등 현실적인 정비시간을 예측하는 것에 대한 구체적인 방법론을 연구하였으며, 정비 복잡도라는 척도를 사용하여 시간변환계수를 적용하였다. 또한, 해당 결과물을 이용하여 기 개발된 장비의 실측 정비시간과 시간변환계수가 적용된 지연시간을 반영한 현실적인 정비시간을 비교/검증하여, 해당 데이터의 신뢰성을 검증해 보았다. 향후 장비 설계 시 정비도 목표값 설정 및 정비도 산출을 위한 연구에서, 초기 실 장비에 대한 정비 시간을 측정하지 못하는 장비의 정비시간을 보다 현실적인 정비시간으로 반영하고, 연구 및 설계반영 활동 등을 통하여 정비시간을 단축하여, 운용 유지 비용 등을 줄일 수 있는 활동 등을 수행할 수 있을 것으로 기대한다.

무기체계 사례 분석을 통한 창정비개발계획안 검증 필요성 연구 (A Study on the Necessity of Verification about depot level maintenance plan through the Weapons System cases analysis)

  • 안정준;김수동
    • 한국산학기술학회논문지
    • /
    • 제20권2호
    • /
    • pp.76-82
    • /
    • 2019
  • 무기체계 획득이후 안정된 운영유지의 책임이 있는 전략적 수준의 군수사의 관점에서 무기체계의 획득과 운영유지 분리에 따른 RISK를 제한적으로 해소하기 위한 방안을 연구하였다. 체계개발 단계에서 검증되지 않는 창정비개발계획안은 체계개발 종료 후 비용분석 등의 별도 검증을 위한 추가적인 인력 및 비용이 수반되고 더 나아가 군의 신뢰가 저하될 RISK를 가지고 있다. 이에 체계개발 단계에서 창정비개발계획안을 연구개발기관이 작성하여 입증 및 확증시험을 통해 검증되어져야 한다. 둘째, 체계개발 단계에서 창정비개발계획안이 작성될 수 있도록 연구개발주관기관의 투입되는 자원이 반영 및 정산될 수 있는 제도적 보완이 필요하다. 셋째, 선행연구 단계에서 창정비 방안에 대한 사업분석과 비용분석을 수행할 수 있어야 한다. 넷째, 소요 및 소요결정 문서에 창정비 개념과 창정비요소를 개발할 수 있는 근거를 반영하여야 한다. 다섯째, 소량의 전력지수가 높은 무기체계는 방위사업법 시행령 제28조 3항과 4항을 실현하기 위해 무기체계 획득단계별 구체화 될 있도록 사업관리를 수행하여야 하겠다.

A Wind Turbine Fault Detection Approach Based on Cluster Analysis and Frequent Pattern Mining

  • Elijorde, Frank;Kim, Sungho;Lee, Jaewan
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제8권2호
    • /
    • pp.664-677
    • /
    • 2014
  • Wind energy has proven its viability by the emergence of countless wind turbines around the world which greatly contribute to the increased electrical generating capacity of wind farm operators. These infrastructures are usually deployed in not easily accessible areas; therefore, maintenance routines should be based on a well-guided decision so as to minimize cost. To aid operators prior to the maintenance process, a condition monitoring system should be able to accurately reflect the actual state of the wind turbine and its major components in order to execute specific preventive measures using as little resources as possible. In this paper, we propose a fault detection approach which combines cluster analysis and frequent pattern mining to accurately reflect the deteriorating condition of a wind turbine and to indicate the components that need attention. Using SCADA data, we extracted operational status patterns and developed a rule repository for monitoring wind turbine systems. Results show that the proposed scheme is able to detect the deteriorating condition of a wind turbine as well as to explicitly identify faulty components.

The Use of Bituminous Subballast on Future High-Speed Lines in Spain: Structural Design and Economical Impact

  • Teixeira, P.F.;Ferreira, P.A.;Pita, A. Lopez;Casas, C.;Bachiller, A.
    • International Journal of Railway
    • /
    • 제2권1호
    • /
    • pp.1-7
    • /
    • 2009
  • The development of structural solutions for high-speed or very high-speed tracks that minimize total life cycle costs of the system is a key issue to improve the operational profitability of new investments. In opposition to conventional ballasted tracks, slab track solutions can be a cost-effective solution, but only in the cases where the benefits due to the increase in track availability and the reduction of track maintenance offsets its much higher construction costs. In the cases where such investment is not feasible, it is worth to evaluate possible structural improvements to ballasted track that allow reducing its maintenance needs without increasing too much its construction costs. This paper evaluates the design requirements and the impact of improving conventional high-speed ballasted tracks by using a bituminous subballast layer. It is divided into two main parts: first the design requirements of the structural solutions with bituminous subballast and its possible benefits on high-speed track deterioration, and secondly the evaluation of the economic impact, in terms of construction costs, of using this structural solution material in future Spanish high-speed lines.

  • PDF

AM600: A New Look at the Nuclear Steam Cycle

  • Field, Robert M.
    • Nuclear Engineering and Technology
    • /
    • 제49권3호
    • /
    • pp.621-631
    • /
    • 2017
  • Many developing countries considering the introduction of nuclear power find that large-scale reactor plants in the range of 1,000 MWe to 1,600 MWe are not grid appropriate for their current circumstance. By contrast, small modular reactors are generally too small to make significant contributions toward rapidly growing electricity demand and to date have not been demonstrated. This paper proposes a radically simplified re-design for the nuclear steam cycle for a medium-sized reactor plant in the range of 600 MWe. Historically, balance of plant designs for units of this size have emphasized reliability and efficiency. It will be demonstrated here that advances over the past 50 years in component design, materials, and fabrication techniques allow both of these goals to be met with a less complex design. A disciplined approach to reduce component count will result in substantial benefits in the life cycle cost of the units. Specifically, fabrication, transportation, construction, operations, and maintenance costs and expenses can all see significant reductions. In addition, the design described here can also be expected to significantly reduce both construction duration and operational requirements for maintenance and inspections.

에이전트 기반 모델링 및 시뮬레이션을 이용한 무기체계 가용도 예측에 관한 연구 (A Study on the Prediction of Weapon System Availability Using Agent Based Modeling and simulation)

  • 이세훈;최명진
    • 디지털산업정보학회논문지
    • /
    • 제17권1호
    • /
    • pp.25-34
    • /
    • 2021
  • Availability is one of the important factor for developing weapon system, because it indicates the mission capability and sustainable life cycle management of weapon system. Recently, as weapon system becomes more advanced and more complex, availability estimation becomes more important to reduce the life cycle cost of weapon system. Modeling and simulation(M&S) is useful method to describe the availability of complex weapon system applying operational environment and maintenance plan. Especially agent based model(ABM) has the strength to describe interactions between agents and environments in complex system. Therefore, this paper presents the availability estimation of weapon system using agent based model. The sample data of part list and reliability analysis is applied to build availability estimation model. User agent and mechanic agent are developed to illustrate the behavior of operation and maintenance using formal specification. Storage reliability is applied to describe failure of each parts. The experimental result shows that this model is quite useful to estimate availability of weapon system. This model may estimate more reasonable availability, if full scale data of weapon system and real field data of operation is provided.

한국철도에서의 계획단계 동력차 스케줄링 최적화 및 전문가 지원시스템의 프로토타입 프로그램 개발에 관한 연구 (Optimization of Planning-Level Locomotive Scheduling at KNR and Development of Its Implementation Prototype Program)

  • 문대섭;김동오
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1999년도 추계학술대회 논문집
    • /
    • pp.46-53
    • /
    • 1999
  • As of July 1999, i,185 lomocotives(excluding metropolitan area electric locomotives) are in Korean National Railroad(KNR). With this limited number of resources assigning locomotives to each trains of timetable is very important in the entire railway management point of view because schedule can be regarded as goods in transportation industry. On a simple rail network, it is rather easier to assign proper locomotives to trains with the experience of operating experts and get optimal assignment solution. However, as the network is getting bigger and complicated, the number of trains and corresponding locomotives will be dramatically increased to rover all the demands required to service all of the trains in timetable. There will be also numerous operational constraints to be considered. Assigning proper locomotives to trains and building optimal cyclic rotations of locomotive routings will result in increasing efficiency of schedule and giving a guarantee of more profit. The purpose of this study is two fold: (1) we consider a planning-level locomotive scheduling problem with the objective of minimizing the wasting cost under various practical constraints and (2) development of implementation prototype program of its assigning result. Not like other countries, i.e. Canada, Sweden, Korean railroad operates on n daily schedule basis. The objective is to find optimal assignment of locomotives of different types to each trains, which minimize the wasting cost. This problem is defined on a planning stage and therefore, does not consider operational constraints such as maintenance and emergency cases. Due to the large scale of the problem size and complexity, we approach with heuristic methods and column generation to find optimal solution. The locomotive scheduling prototype consists of several modules including database, optimization engine and diagram generator. The optimization engine solves MIP model and provides an optimal locomotive schedule using specified optimization algorithms. A cyclic locomotive route diagram can be generated using this optimal schedule through the diagram generator.

  • PDF

무인운전 열차의 실내설비 및 승객 출입문 설계에 대한 고찰 (The Survey of the Interior facilities and Passenger side door systems for driverless rail vehicle)

  • 박성호;박재홍;염규학
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.135-142
    • /
    • 2007
  • The service running of driverless rail vehicle has been required by various social and commercial issue. Currently, the new domestic line between Bu-san and Gim-hae is plan to be provided the LRV(Light Rail Vehicle) with driverless operation firstly in domestic service. These driverless vehicle have some major properties to make it lower the operating and maintenance cost, however on the other side, it unavoidably raise some potential hazard to make it lower the passenger safety because it is hard to take care immediately in emergency state during vehicle running. Therefore it is highly requested that we should consider various conditions at design stage to manufacture and operate the safest vehicle. Therefore, in this paper, we will survey the design concept of vehicle interior facilities based on the previous experience, (1) The difference of interior facilities between normal and driverless vehicle, (2) design and operational concept of passenger side door function to find out best application for domestic line driverless vehicle.

  • PDF

무기체계 RAM 목표값 설정 관련 개선방안 고찰 (A Study on the Improvement of RAM Objective Considering Method for Weapon System)

  • 황경환;허장욱
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제17권2호
    • /
    • pp.150-158
    • /
    • 2017
  • Purpose: The RAM objective is a very important factor that has a great effect on the improvement of the operation ration during the operation maintenance and the reduction of the life cycle cost. It is used as a design criterion during the system development, and its sufficiency should be evaluated during its test evaluation. Method: This study analyzed the cases related to RAM objective setting and suggested the improvement measures. Result: The base data for RAM objective is OMS/MP, which needs to be drawn up under the supervision of the requirement military, and a high-accuracy operating availability should be set through ALDT calculation which reflects the military logistics support environment. In addition, data collection necessary for RAM objective and RAM analysis should be made by supplementing the input data of DELIIS. Conclusion: This study suggests improvement of RAM objective considering for the weapon system.