Browse > Article

A Study on the Improvement of RAM Objective Considering Method for Weapon System  

Hwang, Kyeong Hwan (Department of Mechanical Systems Engineering, Kumoh National Institute of Technology)
Hur, Jangwook (Department of Mechanical Systems Engineering, Kumoh National Institute of Technology)
Publication Information
Journal of Applied Reliability / v.17, no.2, 2017 , pp. 150-158 More about this Journal
Abstract
Purpose: The RAM objective is a very important factor that has a great effect on the improvement of the operation ration during the operation maintenance and the reduction of the life cycle cost. It is used as a design criterion during the system development, and its sufficiency should be evaluated during its test evaluation. Method: This study analyzed the cases related to RAM objective setting and suggested the improvement measures. Result: The base data for RAM objective is OMS/MP, which needs to be drawn up under the supervision of the requirement military, and a high-accuracy operating availability should be set through ALDT calculation which reflects the military logistics support environment. In addition, data collection necessary for RAM objective and RAM analysis should be made by supplementing the input data of DELIIS. Conclusion: This study suggests improvement of RAM objective considering for the weapon system.
Keywords
Reliability; Availability; Maintainability; Administrative & Logistics Delay Time; Operational Mode Summary/ Mission Profile;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 DAPA (2014). "Weapon System RAM Affairs Guidelines". DAPA, No. 261.
2 USA DoD (2005). "DoD Guide for Achieving Reliability, Availability, and Maintainability". USA DoD Guide Book, pp. 3-22.
3 Park, H. K., Kwon, T. W., Lee, C. H. and Park, T. H. (2013). "A Proposal on Analyzing Operational Mission Summary/Mission Profile and RAM Goal Setting from Operational Concepts on the Next-MILSATCOM". Journal of The Korea Institute of Military Science and Technology, Vol. 16, No. 3, pp. 295-303.   DOI
4 Back, S. H., Kim, K. Y., Lee, Y. S., Jung, J. S. and Moon, S. J. (2009). "A Study on Method of Deciding SHIP RAM Objectives in System Demanding Phase". DTaQ, pp. 59-95.
5 Kim, H. C. and Jo, Y. S. (2004). "A Study on RAM Objective Considering Method of M-SAM System". ADD, pp. 53-74.
6 Song, K. H,, Park, Y. M,, Hong, S. K,, Min,, S. S, and You, J. W. et al. (2015). "A Study on Establishing OMS/MP and Target RAM Values of SONAR Using Field Data of Similarity Equipment". Journal of the Korean Institute of Military Science and Technology, Vol. 18, No. 1, pp. 22-30.   DOI
7 Han, C. H., Shin, G. Y. and Oh, M. H. (2015). "Establishing Target RAM Values of Small Tactical Vehicles Based on OMS/MP and The Repair Record Analysis of Similar Equipments". Military Science Review, Vol. 71, No. 1, pp. 149-170
8 Kim, K. Y. and Bae, S. J. (2009). "Establishing Methods of RAM Objective Considering Combat Readiness and Field Data of Similarity Equipment". Journal of the Society of Industrial Management Systems, Vol. 32, No. 3, pp. 127-134.
9 Kim, Y. J. and Kim, K. Y. (1995). "A Study on Objective Considering Method of The Weapon System RAM Element". National Defense University, pp. 1-40.