A Practical Method for Predicting Initial Maintenance Time To Repair (MTTR) Using Maintenance Complexity in Equipment Design |
Shin, Sang-Hee
(LIGNex1 Co. Ltd)
Lee, Hak-Jae (LIGNex1 Co. Ltd) Hwang, Seong-Guk (LIGNex1 Co. Ltd) Kim, Moo-Young (LIGNex1 Co. Ltd) Kwon, Ki-Sang (LIGNex1 Co. Ltd) |
1 | Thomas Pyzdek, Paul Keller, " 6 SIGMA HANDBOOK, 2009".McGraw Hill Professional, New york, USA |
2 | MIL-HDBK-470A, DESIGNING AND DEVELOPING MAINTAINABLE PRODUCTS AND SYSTEMSDepartment of Defense. USA |
3 | S. H. Shin, "Calculating Maintenance Time Considering Maintenance Complexity" (KIIE:Korean Institute of Industrial Engineers) 2016.11. 2,402-2,411 (10 pages) DOI: http://jkiie.org/ |