Transactions of the Korean Society of Pressure Vessels and Piping
/
v.7
no.3
/
pp.23-29
/
2011
The renewed global interest in nuclear power has arisen from the need to reduce greenhouse gas emissions and to provide sufficient electricity for a growing global population before the accident at Fukushima Dai-ichi nuclear power plant in Japan. In spite of the safety issues of nuclear power plants raised by the ongoing Japanese nuclear crisis, many countries with nuclear power plants (NPPs) are still implementing license extensions of 10~20 years, and even consideration is being given to the concept of life-beyond-60, a further period of license extension from 60 to 80 years. To solving the materials aging problem is integral to its success. To evaluate the plant aging phenomena, a lot of background information such as materials and environment of the parts of the reactor and plant systems is needed by the experts. Information on degradation mechanisms is also used. In this paper, a materials degradation evaluation program called OnMDE-SYS (On-line Materials Degradation Evaluation System) is introduced. The developed program provides a variety of information on the materials and stressors as well as operational experience to the experts. It is also anticipated that the experts can perform materials degradation assessment on the web directly by referring to domestic and international information about the degradation of a nuclear power plants through OnMDE-SYS.
The Transactions of The Korean Institute of Electrical Engineers
/
v.65
no.5
/
pp.878-882
/
2016
These days, SFCLs are being developed in order to limit fault current. However, the superconducting elements that limit the fault current have such problems as capacity increase and require auxiliary devices including cooling device. If devices that comprise the current power network can withstand fault current for at least one cycle, it is possible to limit the fault current with current limiting elements by bypassing it on the fault line. In this study, the fault current limiter was configured with current transformer, vacuum interrupter, and current limiting element. Through the experience, it was confirmed that the fault current was limited within one cycle. The superconducting element, as a current limiting element, limited the fault current by 80 % within one cycle from fault occurrence, and the passive element limited it more than 95 %. Also, through the comparison between resistance curve and power consumption curve, it was confirmed that the current limiting element using a passive element was more stable than the superconducting element that required capacity increase and other auxiliary devices. It was considered that the FCL proposed in this study could limit fault current stably within one cycle from fault occurrence by using the existing power technologies such as fault current detection and solenoid valve operating circuit.
Journal of The Korea Institute of Healthcare Architecture
/
v.22
no.4
/
pp.87-95
/
2016
Purpose: Recently an experience in the MERS crisis focused on the importance of infection control in hospitals. According to Korean National healthcare-associated Infection Surveillance System (KONIS) of the KSICP, a great number of 498 people, 841 people, and 1021 people were infected by pneumonia, urinary tract infection, and bacteremia respectively from 94 hospital ICUs during the year of 2014. Therefore, the purpose of this study is to investigate the configuration and design guidelines for the ICU rooms to minimize the nosocominal infections. Methods: Based on the several infection control guidelines and revised Medical Law, consequent analyses which classified the planning and operational behavior in the ICUs of seven hospitals, were performed to reduce the cross-infection. Results: The results of this study are offering a space, configuration and design guidelines for effective infection control in the intensive care units through the unit-bed area, the bed-to-bed distance, the isolation room, etc. Implications: It is expected that this study propose the direction of architectural planning and guideline for the ICU room in order to realize the intension of revised Medical Law.
Babilas, Egidijus;Dokucajev, Pavel;Janulevicius, Darius;Markelov, Aleksej;Pabarcius, Raimondas;Rimkevicius, Sigitas;Uspuras, Eugenijus;Vaisnoras, Mindaugas
Nuclear Engineering and Technology
/
v.50
no.3
/
pp.504-511
/
2018
In Lithuania, all spent nuclear fuel (SNF) resulted from the operation of the Ignalina Nuclear Power Plant (INPP), which had two Russian Acronym for "Channelized Large Power Reactor"-type reactors. After the final shutdown, the total amount of SNF at the INPP was approximately 22,000 fuel assemblies. All these assemblies will be stored for about 50 years and disposed of after that. The decision to shut down and decommission both reactors in Lithuania before termination of design period raises a significant challenge for the treatment of accumulated SNF. Therefore, various techniques and technologies for SNF management were developed and justified for that specific case, and a set of special equipment was installed at the INPP, the effectiveness of which was demonstrated during its operation. This article presents unique techniques related to the management of SNF adopted and commissioned at the INPP after its operation shutdown, namely fuel rod cladding leak tightness control system and special equipment for collection of possible spillage during handling of SNF assembly in the hot cell. The operational experience and measurement results of fuel rod cladding leak tightness control system are presented.
Journal of Information Science Theory and Practice
/
v.7
no.3
/
pp.21-30
/
2019
Information about the formation and filling (in 2014 to 2016) of a terminological dictionary on electronics and radioengineering and collective work (in 2017 to 2018) with a data bank "TERMIN" is presented in this article. In purpose of creating an instrument of navigating the modern scientific-technical space a net of terms with set semantic links is described. This set is based on the analysis of terms' definitions (each term is checked for inclusion in the definitions of all other terms; the definitions were borrowed from reputable reference editions: encyclopedias, dictionaries, reference books). The created model of a system that consists of different information sources, in which it (information) is indexed by the terminology of Russian State Rubricator of Scientific and Technical Information rubrics and/or keywords, is described. There is an access for the search in all these sources in the system. Searching inquiries are referred to in the language of these rubrics or formulated by arbitrary terms. The system is to refer to information sources and give out relevant information. In accordance with this model, semantic links of various types, which allow expanding a search at different modalities of query, should be set among data bank terms. Obtained links will have to increase semantic matching, i.e., they can provide actual understanding of the meaning of the information that is being sought.
Special Issue of the Society of Naval Architects of Korea
/
2015.09a
/
pp.34-40
/
2015
The design, procurement and fabrication of FPSO project ordered by Inpex Browse, Ltd. have been currently carried out by DSME(Daewoo Shipbuilding Marine and Engineering Co.). The unit will be installed and operated in the Ichthys field offshore of North-Western Australia and there are the particular design requirements to do with performance on the environment loads corresponding to max. 10,000 years return period wave. Also, the operational life of FPSO has to be over 40 years. With this background, this paper introduces the structural design procedure of crane pedestal foundation operated in north-western Australia offshore. The design of crane pedestal foundation structure is basically based on international design code (i.e. API Spec. 2C), Classification society's rule and project specifications. The design load cases are mainly divided into the crane normal operating conditions and crane stowed conditions according to environment conditions of the offshore with 1-year, 5-year, 10-year, 200-year and 10,000-year return period wave. This design experience for crane pedestal foundation operated in north-western Australia offshore will be useful to do engineering of other offshore crane structures.
The Journal of Asian Finance, Economics and Business
/
v.8
no.10
/
pp.77-85
/
2021
This study aims to investigate the status quo and identify the challenges and benefits of the digital transformation in the context of small and medium-sized enterprises (SMEs) in Vietnam. The six participating SMEs were purposely contacted, and they were either nominated for, or received the Vietnam Digital Awards in 2018, 2019 and 2020, which were held by the Vietnam Digital Communication Association (http://en.vdca.org.vn/). A qualitative research method is adopted, using a semi-structured interview method and a theoretical triangulation of legitimacy, stakeholder and stewardship theories to facilitate the investigation. This research tries to identify the current challenges and benefits for digital transformation of SMEs in Vietnam, based on perception and experience from business leaders and managers from six SMEs in Vietnam. The findings of this study reveal that besides the recent challenges for digital transformation, participants also experienced and shared their perspectives regarding the benefits received from the digital transformation journey of their organization, which varied from (i) improve operational as well as business functions; (ii) liberate staffs and managers from daily work and allows them to focus on decision-making tasks; (iii) enable solutions to deal with consequences from the COVID-19 pandemic; (iv) enhance value creation process; and (v) help firms to align with the global business standards.
The Journal of Asian Finance, Economics and Business
/
v.8
no.9
/
pp.177-187
/
2021
The purpose of the research to evaluate the efficiency and productivity growth rate of some Vietnamese commercial banks in the period 2008-2020. Using input and output selection theory, the author selected 2 models, estimating the efficiency for model 1 and estimating the yield change for both the models. We have built a model to estimate the efficiency and calculate as well as decompose the productivity growth of Vietnamese commercial banks during the period of active mergers and acquisitions activities in the banking system. Based on the results of the efficiency estimation, TFP shows during mergers and acquisitions, efficiency fluctuates but in an inverted U-shape (increasing from 2008-2011 but decreasing from 2013 to 2020). The estimated results of the impact assessment model show that FDI reduces the efficiency of banks. Productivity analysis shows that 6 out of 23 banks in the study period had positive TFP growth (tfpch > 1) due to technical progress and management efficiency. The findings of this study suggest that Vietnam's commercial banking system has many opportunities to improve operational efficiency in many aspects. In which, there are opportunities to increase credit, improve governance as well as improve the technology level of each bank. In addition, along with traditional products such as deposits and loans, diversification with a wide range of products and services is an important factor to enhance customer experience and demand in commercial banks.
Kim, Jinil;Yeom, Choongsub;Shin, Joonguk;Salim, Shelly
Journal of the Korean Society of Systems Engineering
/
v.14
no.2
/
pp.33-40
/
2018
This paper is based on the interim result of ongoing research and development project to develop a software system which support procurement activities, namely PeMSS (Procurement Engineering Management Support System). PeMSS is a system that enables development requirements for each equipment and help designing equipment meeting the purchase requirements. Procurement at EPC (Engineering Procurement and Construction) and operational stage of a plant is an important area that determines the integrity and profitability of the plant. Procurement of unsuitable equipment due to selection of suppliers that do not meet or omit critical requirements in purchase specification can result in enormous cost increase due to such as delay in EPC project, unsatisfactory performance and reduced plant operation time. In spite of the importance of the procurement engineering, there is a lack of support system for systematic preparation of purchase specification, so development of the procurement specification is basically relying on the experience of the engineers in charge. Accordingly, it is needed to develop the PeMSS to help procurement engineers develop procurement specification based on systems engineering approach. This paper introduces the design of the PeMSS.
Journal of Korean Society of Industrial and Systems Engineering
/
v.43
no.4
/
pp.150-160
/
2020
In this paper, we introduce a pilot's scheduling model which is able to maintain and balance their capabilities for each relevant skill level in military helicopter squadron. Flight scheduler has to consider many factors related pilot's flight information and spends a lot of times and efforts for flight planning without scientific process depending on his/her own capability and experience. This model reflected overall characteristics that include pilot's progression by basis monthly and cumulative flight hours, operational recent flight data and quickly find out a pinpoint areas of concern with respect to their mission subjects etc. There also include essential several constraints, such as personnel qualifications, and Army helicopter training policy's constraints such as regulations and guidelines. We presented binary Integer Programming (IP) mathematical formulation for optimization and demonstrated its effectiveness by comparisons of real schedule versus model's solution to several cases experimental scenarios and greedy random simulation model. The model made the schedule in less than 30 minutes, including the data preprocessing process, and the results of the allocation were more equal than the actual one. This makes it possible to reduce the workload of the scheduler and effectively manages the pilot's skills. We expect to set up and improve better flight planning and combat readiness in Korea Army aviation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.