• Title/Summary/Keyword: Operation Scheduling

Search Result 521, Processing Time 0.027 seconds

A Study on Critical Ratio Scheduling for Determining the Relative Priority (상대적(相對的) 작업우선순위(作業優先順位) 결정(決定)을 위한 긴급율법(緊急率法)에 관한 사례연구(事例硏究))

  • Choe, Chang-Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.15 no.2
    • /
    • pp.74-81
    • /
    • 1987
  • The purpose of this paper is to find out the relative priority among the queueing products for next operation. Critical ratio scheduling is a technique for use in production scheduling to establish and maintain relative priority among the jobs. The relative priority is based on a ratio of when the completed job is required and how much time is required to complete it. A numerical example of "D" company is solved. Jobs are classified into 3 categories; the behind scheduling jobs, the on time jobs and the ahead scheduling jobs.

  • PDF

A Genetic Algorithm for Dynamic Job Shop Scheduling (동적 Job Shop 일정계획을 위한 유전 알고리즘)

  • 박병주;최형림;김현수;이상완
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.27 no.2
    • /
    • pp.97-109
    • /
    • 2002
  • Manufacturing environments in the real world are subject to many sources of change and uncertainty, such as new job releases, job cancellations, a chance in the processing time or start time of some operation. Thus, the realistic scheduling method should Properly reflect these dynamic environment. Based on the release times of jobs, JSSP (Job Shoe Scheduling Problem) can be classified as static and dynamic scheduling problem. In this research, we mainly consider the dynamic JSSP with continually arriving jobs. The goal of this research is to develop an efficient scheduling method based on GA (Genetic Algorithm) to address dynamic JSSP. we designed scheduling method based on SGA (Sing1e Genetic Algorithm) and PGA (Parallel Genetic Algorithm) The scheduling method based on GA is extended to address dynamic JSSP. Then, This algorithms are tested for scheduling and rescheduling in dynamic JSSP. The results is compared with dispatching rule. In comparison to dispatching rule, the GA approach produces better scheduling performance.

Decision-making Problems for the Operation of Container Terminals (컨테이너터미널 운영을 위한 의사결정문제의 소개)

  • Kim, Kap Hwan
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.3
    • /
    • pp.290-302
    • /
    • 2007
  • This paper introduces several decision-making problems that need to be solved in order to facilitate the efficient operation of container terminals. These decision-making problems include the berth planning problem, the quay crane scheduling problem, the unload/load sequencing problem, the yard allocation problem, and the short-term scheduling of transporters and yard cranes. These problems can be classified into strategic decision problems, tactical decision problems, and real time operational decision problems. This paper proposes definitions of the problems that can be used to develop mathematical models for the problems.

Dynamic NAND Operation Scheduling for Flash Storage Controller Systems (플래시 저장장치 컨트롤러 시스템을 위한 동적 낸드 오퍼레이션 스케줄링)

  • Jeong, Jaehyeong;Song, Yong Ho
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.50 no.6
    • /
    • pp.188-198
    • /
    • 2013
  • In order to increase its performance, NAND flash memory-based storage is composed of data buses that are shared by a number of flash memories and uses a parallel technique that can carry out multiple flash memory operations simultaneously. Since the storage performance is strongly influenced by the performance of each data bus, it is important to improve the utilization of the bus by ensuring effective scheduling of operations by the storage controller. However, this is difficult because of dynamic changes in buses due to the unique characteristics of each operation with different timing, cost, and usage by each bus. Furthermore, the scheduling technique for increasing bus utilization may cause unanticipated operation delay and wastage of storage resource. In this study, we suggest various dynamic operation scheduling techniques that consider data bus performance and storage resource efficiency. The proposed techniques divide each operation into three different stages and schedule each stage depending on the characteristics of the operation and the dynamic status of the data bus. We applied the suggested techniques to the controller and verified them on the FPGA platform, and found that program operation decreased by 1.9% in comparison to that achieved by a static scheduling technique, and bus utilization and throughput was approximately 4-7% and 4-19% higher, respectively.

SCHEDULING TECHNIQUE FOR CONTROL STEP (스케듈링 기법 연구)

  • JeongYoungSong;NamWooBack
    • Journal of the Korean Geophysical Society
    • /
    • v.4 no.3
    • /
    • pp.163-173
    • /
    • 2001
  • This paper deals with scheduling problems which are the most important subtask in High-Level Synthesis. Especially, we have concentrated our attentions on the data-path scheduling which can get the structural informaion trom the behavioral algorithm as a first step in synthesis procedure. Suggest Forward scheduling methode is executed the ASAP and ALAP scheduling to use the fifth - order elliptic wave filter of a standard benchmark moedl, and then it is drawing up T.N matrix table by the number resource and control-step, using the table extract of the simple than down-limit value of the control-step for the number of given resource th use this table. All of existing list scheduling techniques determine the priority function first, and then do the operation scheduling, But, the suggested forward scheduling technique does the schedule first, and determines the priority functions if needed in scheduling process.

  • PDF

Scheduling Technique for Control Step (제어구간에 의한 스케듈링 기법)

  • Song, Jeong-Young;Back, Nam-Woo
    • The Journal of Engineering Research
    • /
    • v.4 no.1
    • /
    • pp.35-45
    • /
    • 2002
  • This paper deals with the scheduling problems which are the most important subtask in High-Level Synthesis. Especially, we have concentrated our attentions on the data-path scheduling which can get the structural informations from the behavioral algorithm as a first step in synthesis procedure. Suggest Forward scheduling methode is executed the ASAP and ALAP scheduling to use the fifth – order elliptic wave filter of a standard benchmark model, and then it is drawing up T.N matrix table by the number of resource and control-step, using the table extract of the simple than down-limit value of the control-step for the number of given resource to use this table. All of existing list scheduling techniques determine the priority functions first, and then do the operation scheduling, But, the suggested forward scheduling technique does the schedule first, and determines the priority functions if needed in scheduling process.

  • PDF

Genetic Algorithms for Tire Mixing Process Scheduling (타이어 정련 공정 스케줄링을 위한 유전자 알고리즘)

  • Ahn, Euikoog;Park, Sang Chul
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.2
    • /
    • pp.129-137
    • /
    • 2013
  • This paper proposed the scheduling method for tire mixing processes using the genetic algorithm. The characteristics of tire mixing process have the manufacturing routing, operation machine and operation time by compound types. Therefore, the production scheduling has to consider characteristics of the tire mixing process. For the reflection of the characteristics, we reviewed tire mixing processes. Also, this paper introduces the genetic algorithm using the crossover and elitist preserving selection strategy. Fitness is measured by the makespan. The proposed genetic algorithm has been implemented and tested with two examples. Experimental results showed that the proposed algorithm is superior to conventional heuristic algorithm.

Group Building Based Power Consumption Scheduling for the Electricity Cost Minimization with Peak Load Reduction

  • Oh, Eunsung;Park, Jong-Bae;Son, Sung-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.6
    • /
    • pp.1843-1850
    • /
    • 2014
  • In this paper, we investigate a group building based power consumption scheduling to minimize the electricity cost. We consider the demand shift to reduce the peak load and suggest the compensation function reflecting the relationship between the change of the building demand and the occupants' comfort. Using that, the electricity cost minimization problem satisfied the convexity is formulated, and the optimal power consumption scheduling algorithm is proposed based on the iterative method. Extensive simulations show that the proposed algorithm achieves the group management gain compared to the individual building operation by increasing the degree of freedom for the operation.

Development of heuristic method for job shop scheduling with alternative machines (대안기계를 갖는 Jop Shop scheduling을 위한 발견적기법의 개발)

  • 최동순;정병희
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.10a
    • /
    • pp.303-306
    • /
    • 1996
  • This paper proposes a heuristic method for job shop scheduling with alternative machines. Our heuristic suggests four machine-selecting rules and two priority dispatching rules for modifying existent ones considering alternative machines, and then it extends existing nondelay/active job shop schedule generation. This heuristic provides good criteria(rules) in the selection of a proper machine among those performing a specific operation and for the dispatch of an operation to a selected machine and thus these rules permit the efficient job shop scheduling with alternative machines. The performances of our four machine-selecting rules in addition to the two priority dispatching rules, applied together with the existing 17 rules, are experimented and evaluated, respectively.

  • PDF

A Heuristic Method for Job Shop Scheduling Considering Alternative Machines (대안기계를 고려한 Job Shop Scheduling의 발견적 기법)

  • 최동순;정병희
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.43
    • /
    • pp.127-137
    • /
    • 1997
  • This paper proposes a heuristic method for job shop scheduling with alternative machines. Our heuristic suggests two machine-selecting rules and two priority dispatching rules for modifying existent ones considering alternative machines, and then it extends existing nondelay/active job shop schedule generation. This heuristic provides good criteria(rules) in the selection of a proper machine among those performing a specific operation and for the dispatch of an operation to a selected machine and thus these rules permit the efficient job shop scheduling with alternative machines. The performances of our two machine-selecting rules in addition to the two priority dispatching rules, applied together with the existing 17 rules, are experimented and evaluated, respectively.

  • PDF