• Title/Summary/Keyword: Operation Capacity

Search Result 2,148, Processing Time 0.03 seconds

A Study on the operating of building equipment in apartment building - With reference to heating equipment and water-supply facilities - (고층 아파트의 건축설비 운용실태에 관한 연구 - 난방설비 및 급수설비를 중심으로 -)

  • 안창환
    • Journal of the Korean housing association
    • /
    • v.2 no.2
    • /
    • pp.35-40
    • /
    • 1991
  • In this study, the operation(heating) period of heat source(boiler) machineries in apartment building for periodic heat load analysis has been established by investigating their heat source machineries actural operation period, energy consumption, the capacity of heat source machineries, and their building element. Thus, the purpose of this paper is at bring up the various pre-estimate expression for energy conservatiove, efficient operation and amount of water supplied.

  • PDF

New Communication Method using Pulse Width Information for Power Converter Parallel Operation (전력변환기 병렬운전을 위한 펄스폭 정보를 이용한 새로운 통신방식)

  • Dong-Whan Kim;Seong-Cheol Choi;Tuan-Vu Le;Sung-Jun Park;Seong-Mi Park
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.6_2
    • /
    • pp.1097-1108
    • /
    • 2023
  • Recently, demand for technology for energy economy and stable supply is increasing due to the increase in power demand of loads. The amount of DC power generation using new and renewable energy is noticeably increasing, and the use of DC power supplies is also increasing due to the increase in electric vehicles and digital loads. During parallel operation to increase the capacity of the power converter, the module bus method or the method using Can communication and serial communication has significant difficulties in smooth operation due to communication time delay for information sharing. Synchronization of information sharing of each power converter is essential for smooth parallel operation, and minimization of communication time delay is urgently needed as a way to overcome this problem. In this paper, a new communication method using pulse width information is proposed as a communication method specialized for parallel operation of power converters to compensate for the disadvantage of communication transmission delay in the existing system. The proposed communication method has the advantage of being easily implemented using the PWM and Capture function of the microcomputer. In addition, the DC/DC converter for DC distribution was verified through simulation and experiment, and it has the advantage of easy capacity expansion when applied to parallel operation of various types of power converters as well as DC/DC converters.

DISCRETE EVENT SYSTEM SIMULATION APPROACH FOR AN OPERATION ANALYSIS OF A HEADEND PROCESS FACILITY

  • Lee, Hyo-Jik;Kim, Sung-Hyun;Park, Byung-Suk
    • Nuclear Engineering and Technology
    • /
    • v.41 no.5
    • /
    • pp.739-746
    • /
    • 2009
  • This paper introduces facility operation modeling and simulation based primarily on a discrete event system modeling scheme. Many modern industrial facilities are so complex that their operational status cannot be estimated by simple calculations. In general, a facility can consist of many processes and transfers of material between processes that may be modeled as a discrete event system. This paper introduces the current status of studies on operation modeling and simulation for typical nuclear facilities, along with some examples. In addition, this paper provides insights about how a discrete event system can be applied to a model for a nuclear facility. A headend facility is chosen for operation modeling and the simulation, and detailed procedure is thoroughly described from modeling to an analysis of discrete event results. These kinds of modeling and simulation are very important because they can contribute to facility design and operation in terms of prediction of system behavior, quantification of facility capacity, bottleneck identification and efficient operation scheduling.

Analysis of Hybrid Converter with Wide Voltage Range Operation

  • Lin, Bor-Ren
    • Journal of Power Electronics
    • /
    • v.19 no.5
    • /
    • pp.1099-1107
    • /
    • 2019
  • A soft switching converter with wide voltage range operation is investigated in this paper. A series resonant converter is implemented to achieve a high circuit efficiency with soft switching characteristics on power switches and rectifier diodes. To improve the weakness of the narrow voltage range in LLC converters, an alternating current (ac) power switch is used on the primary side to select a half-bridge or full-bridge resonant circuit to implement 4:1 voltage range operation. On the secondary-side, another ac power switch is adopted to select a full-wave rectifier or voltage-doubler rectifier to achiever an additional 2:1 output voltage range. Therefore, the proposed resonant converter has the capacity for 8:1 (320V~40V) wide output voltage operation. A single-stage hybrid resonant converter is employed in the study circuit instead of a two-stage dc converter to achiever wide voltage range operation. As a result, the study converter has better converter efficiency. The theoretical analysis and circuit characteristics are verified by experiments with a prototype circuit.

Optimization of Earthwork Operation for Energy-saving using Discrete Event Simulation

  • Yi, Chang-Yong;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.537-539
    • /
    • 2015
  • considerate operation is a major issue in the equipment-intensive operation. Identifying an optimal equipment combination is important to achieve low-energy operations. An Earthwork operation planning system, which measures the energy consumption of construction operations by taking into account construction equipments' engineering attributes (e.g., weight, capacity, energy consumption rate, etc.) and operation conditions (e.g., road condition, attributes of materials to be moved, geometric information, etc.), is essential to achieve the low-energy consumption. This study develops an automated computerized system which identifies an optimal earthmoving equipment fleet minimizing the energy consumption. The system imports a standard template of earthmoving operation model and compares numerous scenarios using alternative equipment allocation plans. It finds the fleet that minimizes the energy consumption by enumerating all cases using sensitivity analysis. A case study is presented to verify the validity of the system.

  • PDF

Design of Optimal Capacity Coefficients of Flow Control Valves in the Hoist Hydraulic System Using the Complex Method (콤플렉스법에 의한 호이스트 유압회로 유량제어밸브의 최적유량계수 설계)

  • Lee, S.R.
    • Transactions of The Korea Fluid Power Systems Society
    • /
    • v.4 no.1
    • /
    • pp.1-6
    • /
    • 2007
  • The typical hydraulic system of hoist is composed of a hydraulic supply unit, a directional control valve, two pilot operated check valves, two flow control valves. The capacity coefficients of flow control valves should be adjusted for the hoist to operate at moderate speed and minimize the hydraulic energy loss. However, it is difficult to adjust the four capacity coefficients of flow control valves by trial and error for optimal operation. The steady state model of the hoist hydraulic system is derived and the optimal capacity coefficients of flow control valves are obtained using the complex method that is one kind of constrained direct search method.

  • PDF

Impact of Temporary Link Blockage on Ergodic Capacity of FSO System

  • Petkovic, Milica I.;Djordjevic, Goran T.
    • ETRI Journal
    • /
    • v.40 no.3
    • /
    • pp.330-336
    • /
    • 2018
  • Free-space optical (FSO) systems have attracted much attention from both research and application perspectives owing to their many benefits, such as license-free operation, low-cost, and high data rates. This paper investigates the ergodic capacity of FSO systems, which is an important metric of system performance. The stochastic temporary laser-beam blockage, pointing errors, and atmospheric turbulence are simultaneously considered. The results illustrate that the link blockage causes a decreased ergodic capacity. We show that to maximize the ergodic capacity, there is an optimal value of the laser-beam radius at the waist, which largely depends on pointing errors; however, it is independent of the atmospheric turbulence and the probability of link blockage.

A Study on the Uncertainty of Additional Generating Capacity in Long Term Electricity Plan (전력수급기본계획에서 발전소 준공 불확실성에 대한 고찰)

  • Kim, C.S.;Rhee, C.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.843-845
    • /
    • 2005
  • The uncertainty of long term electricity plan consists of the uncertainty of demand forecast and additional generating capacity. Demand forecast is clearly improved the accuracy than the past through improving forecasting methods. However, the uncertainty of additional generating capacity is increased due to the change of market environment. In an operation by a sole utility, additional generating capacity would be possible by the regulation of government. Currently the generation companies have spined off from KEPCO and some IPPs participate the electricity market. It increases the uncertainty due to weakened regulation. Also the environment movement by NGOs and occurrence of civil affairs cause the increase of uncertainty. This research would analyze the current situation on the uncertainty of additional generating capacity and construction delays. Furthermore this research would present the plan to reflecting it in long term electricity plan.

  • PDF

A study on heat capacity of oxide and nitride nuclear fuels by using Einstein-Debye approximation

  • Eser, E.;Duyuran, B.;Bolukdemir, M.H.;Koc, H.
    • Nuclear Engineering and Technology
    • /
    • v.52 no.6
    • /
    • pp.1208-1212
    • /
    • 2020
  • Knowledge on fuel enthalpy and its temperature derivative, the heat capacity, are important quantities in determination of fuel behavior in normal reactor operation and reactor transients. The aim of this study is to compare the heat capacity of oxide and nitrite fuels by using Einstein-Debye approximation. A simple analytical expression was performed to calculate the heat capacity of fuels. To test the validity and reliability, the calculated formulas were compared to published results for various nuclear fuels including UO2, ThO2, PuO2 and UN. Calculated formulas yielded results in consistent with literature.

Production-distribution Planning in Supply Chain Management Considering Processing Times and Capacity Using Simulation and Optimization Model (시간과 능력을 고려한 공급사슬 경영에서의 생산-분배 계획을 위한 시뮬레이션과 최적화모델의 적용)

  • Sook Han Kim;Young Hae Lee
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2000.11a
    • /
    • pp.165-173
    • /
    • 2000
  • Analytic models have been developed to solve integrated production-distribution problems in supply chain management (SCM). As one of major constraints in analytic models, capacity, which is the total operation time in this paper has mostly been known or disregarded assuming infinite capacity. Also, as major factors, machine processing time to fabricate or assemble a part or product at a certain machine center in production system and vehicle processing time to deliver a product to a customer by a certain vehicle in distribution system have been fixed and regarded as a static factor, But in the real systems significant differences exit between capacity and the required time to achieve the production-distribution plan and between processing time and consumed time to process a part or product. In this paper, capacity and processing times in the analytic model are considered as dynamic factors and adjusted by the results from independently developed simulation model, which includes general production-distribution characteristics. Through experiments, we obtain the more realistic solutions reflecting stochastic natures by performing the iterative analytic-simulation procedure.

  • PDF