• Title/Summary/Keyword: Operating unit

Search Result 1,243, Processing Time 0.025 seconds

Single-Phase Self-Excited Induction Generator with Static VAR Compensator Voltage Regulation for Simple and Low Cost Stand-Alone Renewable Energy Utilizations Part I : Analytical Study

  • Ahmed, Tarek;Noro, Osamu;Soshin, Koji;Sato, Shinji;Hiraki, Eiji;Nakaoka, Mutsuo
    • KIEE International Transactions on Power Engineering
    • /
    • v.3A no.1
    • /
    • pp.17-26
    • /
    • 2003
  • In this paper, the comparative steady-state operating performance analysis algorithms of the stand-alone single-phase self-excited induction generator (SEIG) is presented on the basis of the two nodal admittance approaches using the per-unit frequency in addition to a new state variable de-fined by the per-unit slip frequency. The main significant features of the proposed operating circuit analysis with the per-unit slip frequency as a state variable are that the fast effective solution could be achieved with the simple mathematical computation effort. The operating performance results in the simulation of the single-phase SEIG evaluated by using the per-unit slip frequency state variable are compared with those obtained by using the per-unit frequency state variable. The comparative operating performance results provide the close agreements between two steady-state analysis performance algorithms based on the electro-mechanical equivalent circuit of the single-phase SEIG. In addition to these, the single-phase static VAR compensator; SVC composed of the thyristor controlled reactor; TCR in parallel with the fixed excitation capacitor; FC and the thyristor switched capacitor; TSC is ap-plied to regulate the generated terminal voltage of the single-phase SEIG loaded by a variable inductive passive load. The fixed gain PI controller is employed to adjust the equivalent variable excitation capacitor capacitance of the single-phase SVC.

Experimental Study on the Performance Improvement of a Simultaneous Heating and Cooling Heat Pump in the Cooling-main Operating Mode (냉방주체 운전모드에서 동시냉난방 열펌프 성능향상에 관한 실험적 연구)

  • Chung, Hyun-Joon;Joo, Young-Ju;Kang, Hoon;Kim, Yong-Chan;Choi, Jong-Min
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.20 no.5
    • /
    • pp.314-320
    • /
    • 2008
  • The cooling load in winter is significant in buildings and hotels because of the usage of office equipments and the improved wall insulation. Hence, a multi~heat pump is required to cover heating and cooling simultaneously for each indoor unit. In this study, the operating characteristics and performance of a simultaneous heating and cooling heat pump in the cooling-main operating mode were investigated experimentally. The system adopted a variable speed compressor using R410A with four indoor units and one outdoor unit. In the cooling-main mode, the heating capacity decreased due to reduction of flow rate to the indoor unit under heating mode operation. The EEV opening was adjusted to increase flow rate to the indoor unit under heating mode operation. The total capacity and COP in the cooling-main mode increased by 20.5% and 29.2%, respectively, compared with those in the cooling-only mode.

A Study on Profitability of Power Plant for Landfill Gas (매립가스 자원화를 위한 가스엔진 발전의 수익성에 관한 연구)

  • Kim, O-U;Lee, Jeong-Il
    • 한국산학경영학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.147-170
    • /
    • 2006
  • Landfill gas is a mixture of methane and carbon dioxide produced by the bacterial decomposition of organic wastes, and it is considered to produce bad smells and pollute the environment. Economic trials and the developments of landfill gas, as an alternative energy resource, become known at the recent years, Resource development of landfill gas, which is managed by Korea up to now, is for the most part generation using gas engine. Medium BTU and High BTU are considered for the power generation as well. Most income of generation using gas engine is selling charge through a power plant. Expecting to manage the power plant for up to 10 years, the analysis based on revenue and expenditure shows when the unit price is 65.2 Won and the operating rate reaches 90%, it is possible to be into the black in 2012 without considering additional financial expense, It was also analyzed that the profit at a unit price of 85 Won under the anticipated rising unit price by the operating rate of 71% is larger than at the operating rate of 90% under limited unit price of 65.2 Won. It means to manage the power plant at a unit price of 65.2 Won and the operating rate must be higher than 90% for economic logicality. If we assume that the operating rate is 90% and it increases the unit price, the unit price must be higher than 85 Won for the management of a power plant. Analysis of changing a unit price, however, might be expected to have a gradual rise of prices. If there is no price rising and additional income related to CDM(Clean Development Mechanism) and emission trading upon Kyoto protocol, the management of a power plant using gas engine will get financial difficulties because of many operating expenses. However, since landfill gas is considered as a worthy energy resource for the guarantee of sustainable development and for the equity between recent generation and future generation, the development of it must be accomplished by the government's additional supporting and efforts under the interest of all stakeholder who are involved.

  • PDF

Cost Analysis for Periodic Maintenance Policy with Minimal Repair (응급수리를 고려한 정기보전정책의 비용분석)

  • 김재중;김원중
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.34
    • /
    • pp.139-146
    • /
    • 1995
  • This study is concerned with cost analysis in periodic maintenance policy. Generally periodic maintenance policy in which item is repaired periodic interval times. And in the article minimal repair is considered. Minimal repair means that if a unit fails, unit is instantaneously restored to same hazard rate curve as before failure. In the paper periodic maintenance policy with minimal repair is as follows; Operating unit is periodically replaced in periodic maintenance time, if a failure occurs between minimal repair and periodic maintenance time, unit is replaced by a spate until the periodic time comes. Also unit undergoes minimal repair at failures in minimal-repair-for-failure interval. Then total expected cost per unit time is calculated according to maintenance period and scale parameter of failure distribution. Total cost factors ate included operating, fixed, minimal repair, periodic maintenance and replacement cost Numerical example is shown in which failure time of system has erlang distribution.

  • PDF

Cost Analysis Model for Periodic Maintenance Policy with Maintenance Cost Factor (보전비용요소를 고려한 정기보전정책의 비용분석모델)

  • 김재중;김원중
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.36
    • /
    • pp.287-295
    • /
    • 1995
  • This paper is concerned with cost analysis model in periodic maintenance policy. Generally periodic maintenance policy in which item is repaired periodic interval times. And in the article minimal repair is considered. Mimimal repair means that if a unit fails, unit is instantaneously restored to same hazard rate curve as before failure. In the paper periodic maintenance policy with minimal repair is as follows; Operating unit is periodically replaced in periodic maintenance time, if a failure occurs between minimal repair and periodic maintenance time, unit is replaced by a new item until tile periodic maintenance time comes. Also unit undergoes minimal repair at failures in minimal-repair-for-failure interval. Then total expected cost per unit time is calculated according to scale parameter of failure distribution. Maintenance cost factors are included operating, fixed, minimal repair, periodic maintenance and new item replacement cost. Numerical example is shown in which failure time of system has weibull distribution.

  • PDF

Reliability of Power System Included Distributed Generation Considering Operating Strategy (분산전원 도입시 운영전략을 고려한 계통 신뢰도 분석)

  • 김진오;배인수
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.17 no.4
    • /
    • pp.81-86
    • /
    • 2003
  • Using DG for peak-shaving unit could reduce the overall system operating cost, and using DG for standby power unit could improve the reliability of the distribution system The models of peak-shaving unit and standby power unit are different from each other. The Monte-Carlo simulation is suitable for the purpose of the analysis of two DG models. In this paper, the reliability indices are calculated from the time-sequential method, and the merit and defect of the peak-shaving unit and standby power unit are investigated.

Effect of Re-liquefaction System on Operating Expenditure of LNGC in Terms of Fuel Oil Consumption Cost and BOG Combustion Cost (천연가스 운반선의 재액화 장치가 운항비용에 미치는 영향에 관한 연구: 연료비용 및 증발 가스 연소비용 관점에서)

  • You, Youngjun;Lee, Joon Chae
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.57 no.3
    • /
    • pp.152-159
    • /
    • 2020
  • Ship owners had pursued higher benefits by demanding the new design and construction of ships with higher operational efficiency. There was a necessity for shipyards to suggest a more economical design and advanced operation concept in order to meet the demands. Especially, since BOG combustion and activation of the re-liquefaction unit had to be taken into account in ship design in addition to fuel oil and gas consumption, the evaluation of the operating efficiency considering the technological trends was necessary. In this paper, it was aimed to study the design philosophy and operation strategy by considering the effect of fuel oil and gas consumption, BOG combustion, and activation of the re-liquefaction unit on the operating cost for laden voyage according to ship speed, BOR, and activation of the re-liquefaction unit. For this purpose, the costs were acquired by conducting the sailing simulation of an LNGC based on a mathematical model including the maneuvering equations of motion. The design philosophy and operation strategy was reviewed in terms of the operating cost.

A Control Algorithm for Highly Efficient Operation of Auxiliary Power Unit in a Series Hybrid Electric Bus (직렬형 하이브리드 버스에서 보조동력장치의 고효율 작동을 위한 제어 알고리즘)

  • 함윤영;송승호;민병문;노태수;이재왕;이현동;김철수
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.11 no.5
    • /
    • pp.170-175
    • /
    • 2003
  • A control algorithm is developed for highly efficient operation of auxiliary power unit (APU) that consists of a diesel engine and a directly coupled induction generator in series hybrid electric Bus (SHEB). In a series hybrid configuration the APU supplies the electric power needed for maintaining the state of charge (SOC) of the battery unit in various conditions of vehicle operation. As the rotational speed of generator does not depend on the vehicle speed, an optimized operation of engine-generator unit based on the efficiency map of each component can be achieved. The output torque of diesel engine can be controlled by the amount of fuel injection, and the power converted from mechanical to electrical energy can be adjusted by generate control unit (GCU) using the decoupling vector control of torque and flux. As for the given reference of the generating power, the multiply of speed and torque, many combinations of operating speed and torque are possible. The algorithm decides the new operating point based on the engine efficiency map and generator characteristic curve. During the transition of operating points, the speed controller saturation is avoided using variable limit and filtering of generator torque reference. A test rig and SHEB consist of a 1.5L diesel engine and a 30kw induction generator are constructed by Hyundai Motor Company.

EP Based PSO Method for Solving Multi Area Unit Commitment Problem with Import and Export Constraints

  • Venkatesan, K.;Selvakumar, G.;Rajan, C. Christober Asir
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.2
    • /
    • pp.415-422
    • /
    • 2014
  • This paper presents a new approach to solve the multi area unit commitment problem (MAUCP) using an evolutionary programming based particle swarm optimization (EPPSO) method. The objective of this paper is to determine the optimal or near optimal commitment schedule for generating units located in multiple areas that are interconnected via tie lines. The evolutionary programming based particle swarm optimization method is used to solve multi area unit commitment problem, allocated generation for each area and find the operating cost of generation for each hour. Joint operation of generation resources can result in significant operational cost savings. Power transfer between the areas through the tie lines depends upon the operating cost of generation at each hour and tie line transfer limits. Case study of four areas with different load pattern each containing 7 units (NTPS) and 26 units connected via tie lines have been taken for analysis. Numerical results showed comparing the operating cost using evolutionary programming-based particle swarm optimization method with conventional dynamic programming (DP), evolutionary programming (EP), and particle swarm optimization (PSO) method. Experimental results show that the application of this evolutionary programming based particle swarm optimization method has the potential to solve multi area unit commitment problem with lesser computation time.

Unit Response Optimizer mode Design of Ultra Super Critical Coal-Fired Power Plant based on Fuzzy logic & Model Predictive Controller (퍼지 로직 및 모델 예측 제어기 적용을 통한 초초임계압 화력발전소 부하 응답 최적화 운전 방법 설계)

  • Oh, Ki-Yong;Kim, Ho-Yol
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.12
    • /
    • pp.2285-2290
    • /
    • 2008
  • Even though efficiency of coal-fired power plant is proportional to operating temperature, increasement of operating temperature is limited by a technological level of each power plant component. It is an alternative plan to increase operating pressure up to ultra super critical point for efficiency enhancement. It is difficult to control process of power plant in ultra super critical point because that point has highly nonlinear characteristics. In this paper, new control logic, Unit Response Optimizer Controller(URO Controller) which is based on Fuzzy logic and Model Predictive Controller, is introduced for better performance. Then its performance is tested and analyzed with design guideline.