• 제목/요약/키워드: Operating schedule

검색결과 156건 처리시간 0.033초

HCF용 스트럿의 개선을 위한 연구 - Motorized Strut & Digital Gage (A Study on the Improvement of the Strut for the HCF - Motorized Strut & Digital Gage)

  • 심형준;한창수
    • 한국공작기계학회:학술대회논문집
    • /
    • 한국공작기계학회 2001년도 추계학술대회(한국공작기계학회)
    • /
    • pp.263-268
    • /
    • 2001
  • Two ways of improvement of the strut for the HCF was made in this paper. The strut for the existing HCF is a passive link, which results the posture of the HCF and related bones. The accuracy of the HCF depends on the accuracy of the strut length. A "digital gage" was proposed to increase the accuracy of the strut by presenting the measuring result as figures in manual mode operation. And a "motorized strut system" was designed for the automated HCF operation. A strut was equipped with a motor, "motorized strut" can be operated manually and automatically. In automatic mode, the HCF operating data is generated by the HCF schedule package in PC and is downloaded to the "motorized strut system" controller. By these two improvements, changes in orthopedic equipments like HCF and other Ilizarov fixators are expected.

  • PDF

점용접 표준시편에 대한 가속내구시험법의 적용 (Application of Accelerated Vibration Testing to Spot-welding Specimen)

  • 김관주;조성신;정진성
    • 한국자동차공학회논문집
    • /
    • 제11권3호
    • /
    • pp.209-213
    • /
    • 2003
  • It is advantage of accelerated vibration testing to compress service exposures to operating vibration into a reduced laboratory test by increasing the amplitude or frequency of the applied input excitations. This paper proposes an accelerated test method to estimate the high-cycle fatigue life under random excitation. The method consists of conducting a test with amplified input excitation and extrapolating linearly the lift in the accelerated condition into the real lift in field condition. The extrapolation is carried out applying the high-cycle irregular excitation fatigue theory including the rainflow counting, Miner’s damage accumulation rule, and Goodman’s mean stress correction. As a verification, those estimated lift is compared with that acquired by experiment f3r the simple case of spot welding specimen with good agreement. This testing procedure will provide an useful scheme that can reduce testing period associated with developing time schedule of new product.

발전기 예방정비계획 전산모형 개발 (Development of Generator Maintenance Scheduling Program)

  • 박종배;정윤원;주행로;이명희;신점구
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.216-217
    • /
    • 2006
  • This paper presents development of program for generator maintenance scheduling. The maintenance scheduling of generating units is a dynamic discrete combinatorial optimization problem with constraints to determine the optimal maintenance periods of each generating units for a given planning periods. The developed program is designed so as to provide the maintenance schedule satisfying the operating reserve margin levelization and the procurement of proper reliability. In order to verify the effectiveness of the developed program, the numerical study has been performed with the practical data in 2005.

  • PDF

경쟁시장에서 발/송전설비 예방정비계획에 관한 연구 (Generation & transmission maintenance scheduling in competitive power markets)

  • 한석만;김경민;박중성;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.798-800
    • /
    • 2005
  • In competitive electricity markets, the System Operator (SO) coordinates the overall maintenance schedules whenever the collective maintenance schedule reported to SO by Gencos & Transco in the pool does not satisfy the specified operating criteria, such as system reliability or supply adequacy. We propose a two-layer mathematical algorithm amenable to maintenance scheduling problem into master problem and sub-problem. The master problem coordinates the scheduling, and sub-problem, DC optimal power flew, checks the adequacy. The proposed algorithm was demonstrated with a case study.

  • PDF

AN FORMULATION OF THE ENERGY MODEL FOR THE KOREAN ENERGY INDUSTRY

  • Kim, Jong Duck
    • 산업경영시스템학회지
    • /
    • 제12권20호
    • /
    • pp.55-61
    • /
    • 1989
  • The main contribution this research is the development of methodology which is capable of solving problems associated with the capacity expansion and operating schedule of energy industries. The principal concern of such industries is the proper allocation of primary energy which are required for the production of sufficient supply of electricity and petroleum products for the Korea`s energy needs. Nonlinear programming models are developed for power generation expansion planning and for the oil refinery industry. In order to deal with uncertainties about future demands for final energy, chance-constrained programming is used to formulate appropriate constraints. The methodology of the model can be used to evaluate Korean energy and expansion planning in the energy industry, especially the electric power generation industry and the refinery industry.

  • PDF

기동정지계획을 고려한 직접부하제어에 관한 연구 (Research of Direct Load Control Considering Unit Commitment)

  • 이범;김용하;김형중;문혁기;정현성;이영길;최상규
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 춘계학술대회 논문집 전력기술부문
    • /
    • pp.220-222
    • /
    • 2001
  • This paper describes the optimizing method of direct load control (DLC) considering unit commitment which is based on dynamic programming. To consider the unit commitment on DLC, 3-Dimensional dynamic programming as a new unit commitment method is developed. And, this method is applied to DLC. As a result, optimization of operating schedule with DLC is possible. This method is applied to the test system, and usefulness of the method is verified.

  • PDF

발전용 보일러 전열 튜브 유로내 온도분포 불균일 개선기법 (The improvement method for power plant boiler temperature nonuniformity of heat transfer tube bank flow path)

  • 정훈;김범신;장석원;안연식;박건복;황정보
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 추계학술대회논문집B
    • /
    • pp.837-841
    • /
    • 2001
  • Almost all power plant boiler has temperature distribution nonuniformity problem in heat transfer tube flow path. It can cause hot spot damage of superheated or reheated heat transfer section and reduce maintenance schedule when nonuniformity is severe. There are two solutions for improvement temperature nonuniformity. one is change of gas flow distribution of gas path and the other is contorl steam flow in tube bank. Of course, first method is very difficulty to apply but second method is'nt. In this paper, control steam flow is used to solve temperature nonuniformity of power plant boiler.

  • PDF

어린이집 실외놀이 운영실태 및 교사의 인식 - 제주지역을 중심으로- (A study on Out Door Play of Day Care Centers in Jeju)

  • 강승희;김창숙;황순영
    • 수산해양교육연구
    • /
    • 제20권2호
    • /
    • pp.309-322
    • /
    • 2008
  • The purpose of this study is to investigate actual environment and operation of outdoor play at day care centers in Jeju area and differences in recognition of outdoor play among teachers and provide basic data to develop an outdoor play program for infants. For this purpose, data were collected from 207 teachers form about 100 day care centers in Jeju area. The results of this study can be summarized as follows: first, there were statistically significant differences in the actual environment of outdoor play mostly by the types of establishment and national, public, or corporate centers had better environment than private ones did. Second, the majority of day care centers in Jeju area were including and operating outdoor play in a daily schedule. Third, there were no significant differences in recognition of outdoor play among teachers.

건설현장에서 발생하는 유압식 항타진동의 특성에 관한 연구 (A Study on the Characteristics of Piling Vibration by Oil Pressure Method in Construction Field)

  • 박재영;곽광수;윤해동;김재수
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2000년도 춘계학술대회논문집
    • /
    • pp.921-926
    • /
    • 2000
  • Recently, in construction field, large construction equipment are used to reduce the construction schedule and labor cost. Therefore, construction vibration has caused much annoyance and that induced from operating of large construction equipment, has become a major problem for a number of dwellers in nearby construction field and it has become a very serious issue in our living environment. In this point, this study attempts to survey on the characteristics of piling vibration by oil pressure method in construction field. And this study intends to get the basic data to establish a standard about construction vibration.

  • PDF

고압유도전동기의 회전자 결함요인 분석에 관한 연구 (A Study on Analysis of Defects cause for Rotor in the High Voltage Induction Motors)

  • 이은춘;변두균;채지석;변일환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.655-656
    • /
    • 2015
  • In this paper, diagnosis for 85 high voltage induction motors which have operated for more than 20 years in 18 wide area water supply offices were applied and the results of diagnosis were analysed. Furthermore, main factors that would be affecting rotor defects were selected and correlations between dependent variables which was magnitude for sideband frequency on current during operation and independent variables such as starting characteristic, operating time, number of operation, load factor, maker, rotation speed, capacity were analysed. It was clear that factors including starting characteristic, number of operation, maker, rotation speed caused break by correlation analysis. From this, regression equation was deduced through regression analysis. Based on suggested regression equation, it is applied usefully that we can estimate the condition of rotor without onsite diagnosis and plan the schedule of diagnosis.

  • PDF