• Title/Summary/Keyword: Open pit

Search Result 104, Processing Time 0.032 seconds

Design and Implementation of Early Warning Monitoring System for Cross-border Mining in Open-pit Mines (노천광산의 월경 채굴 조기경보 모니터링시스템의 설계 및 구현)

  • Li Ke;Byung-Won Min
    • Journal of Internet of Things and Convergence
    • /
    • v.10 no.2
    • /
    • pp.25-41
    • /
    • 2024
  • For the scenario of open pit mining, at present, manual periodic verification is mainly carried out in China with the help of video surveillance, which requires continuous investment in labor cost and has poor timeliness. In order to solve this difficult problem of early warning and monitoring, this paper researches a spatialized algorithmic model and designs an early warning system for open-pit mine transboundary mining, which is realized by calculating the coordinate information of the mining and extracting equipments and comparing it with the layer coordinates of the approval range of the mines in real time, so as to realize the determination of the transboundary mining behavior of the mines. By taking the Pingxiang area of Jiangxi Province as the research object, after the field experiment, it shows that the system runs stably and reliably, and verifies that the target tracking accuracy of the system is high, which can effectively improve the early warning capability of the open-pit mines' overstepping the boundary, improve the timeliness and accuracy of mine supervision, and reduce the supervision cost.

Creation of Vector Network Data with Considering Terrain Gradient for Analyzing Optimal Haulage Routes of Dump Trucks in Open Pit Mines (노천광산 덤프트럭의 최적 운반경로 분석을 위한 지형경사가 고려된 벡터 네트워크 자료의 생성 방법)

  • Park, Boyoung;Choi, Yosoon;Park, Han-Su
    • Tunnel and Underground Space
    • /
    • v.23 no.5
    • /
    • pp.353-361
    • /
    • 2013
  • Previous studies for analyzing optimal haulage routes of dump trucks in open pit mines mostly used raster data. However, the raster data has several problems in performing optimal route analyses: (1) the jagged appearance of haulage roads according the cell resolution often causes overestimation of the travel cost; (2) it difficult to trace the topological relationships among haulage roads. These problems can be eliminated by using vector network data, however a new method is required to reflect the performance characteristics of a dump truck according to terrain gradient changes. This study presents a new method to create vector network data with the consideration of terrain gradient for analyzing optimal haulage routes of dump trucks in open pit mines. It consists of four procedures: (a) creating digital elevation models, (b) digitizing haulage road networks, (c) calculating the terrain gradient of haulage roads, and (d) calculating the average speed and travel time of a dump truck along haulage roads. A simple case study at the Roto South pit in the Pasir open pit coal mine, Indonesia is also presented to provide proof that the proposed method is easily compatible to ArcGIS Network Analyst software and is effective in finding optimal haulage routes of dump trucks with considering terrain gradient in open pit mines.

Evaluation of Accuracy and Utilization of the Drone Photogrammetry for Open-pit Mine Monitoring (노천광산 모니터링을 위한 드론 사진측량의 정확도 및 활용성 평가)

  • Park, Joon-Kyu;Um, Dae-Yong
    • Journal of Digital Convergence
    • /
    • v.17 no.12
    • /
    • pp.191-196
    • /
    • 2019
  • The development of open-pit mines leads to large-area topographical changes in highland forests and can lead to severe deterioration of forests, requiring continuous monitoring. The drone photogrammetry is performed at a lower altitude than the existing manned aerial photogrammetry, and thus has a relatively high accuracy. The purpose of this study is to construct spatial information of large open pit mine using drone photogrammetry and to evaluate the accuracy and utilization of the results. The accuracy of the drone photogrammetric results was 0.018 ~ 0.063m in the horizontal direction and 0.027m ~ 0.088m in the vertical direction. These results satisfy the permissible accuracy of 1: 1,000 digital topographic map and it can be used for open mine monitoring. The geospatial information of the open pit mine can be used in various ways, and it can be used to monitor the quantitative change of a specific area for time series change through data management by periodic data acquisition. If drone photogrammetry is applied to open-pit mine monitoring in the future, work time and cost can be greatly reduced compared to the conventional GNSS or total station method, and the work efficiency can be greatly improved because more visible data can be generated.

Optimal Measurement System for Weak Rock Slopes in an Open-Pit Mine (노천광 연약 사면에서의 계측시스템 선택을 위한 고찰)

  • SunWoo, Choon;Ryu, Dong-Woo;Jung, Yong-Bok;Park, Do-Hyun
    • The Journal of Engineering Geology
    • /
    • v.22 no.2
    • /
    • pp.157-171
    • /
    • 2012
  • The slope design of an open-pit mine must ensure slope stability and economic feasibility. The overall slope angle of the pit is therefore the main factor of concern because of limited support or reinforcement options available in such a setting. This study examines the optimal measurement system for monitoring the behavior of the slope in an open-pit mine using displacement measurement, data analysis, and numerical simulations for a coal mine at Pasir, Indonesia. The area of slope to be managed is extensive and the maximum displacement, as calculated by numerical analysis, is about 3,000 mm. The displacement data, measured by inclinometer and GPS, were analyzed, and the applicability of SSR (slope stability radar) was reviewed in comparison with other monitoring systems.

Failure Prediction for Weak Rock Slopes in a Large Open-pit Mine by GPS Measurements and Assessment of Landslide Susceptibility (대규모 노천광 연약암반 사면에서의 GPS 계측과 위험도평가에 의한 파괴예측)

  • SunWoo, Choon;Jung, Yong-Bok;Choi, Yo-Soon;Park, Hyeong-Dong
    • The Journal of Engineering Geology
    • /
    • v.20 no.3
    • /
    • pp.243-255
    • /
    • 2010
  • The slope design of an open-pit mine must consider economical efficiency and stability. Thus, the overall slope angle is the principal factor because of limited support or reinforcement options available in such a setting. In this study, slope displacement, as monitored by a GPS system, was analyzed for a coal mine at Pasir, Indonesia. Predictions of failure time by inverse velocity analysis showed good agreement with field observations. Therefore, the failure time of an unstable slope can be roughly estimated prior to failure. A GIS model that combines fuzzy theory and the analytical hierarchy process (AHP) was developed to assess slope instability in open-pit coal mines. This model simultaneously considers seven factors that influence the instability of open-pit slopes (i.e., overall slope gradient, slope height, surface flows, excavation plan, tension cracks, faults, and water body). Application of the proposed method to an open-pit coal mine revealed an enhanced prediction accuracy of failure time and failure site compared with existing methods.

Simulation of Shovel-Truck Haulage Systems in Open-pit Mines by Considering Breakdown of Trucks and Crusher Capacity (트럭 고장 및 파쇄기 처리용량을 고려한 노천광산 쇼밸-트럭 운반 시뮬레이션)

  • Park, Sebeom;Choi, Yosoon;Park, Han-Su
    • Tunnel and Underground Space
    • /
    • v.24 no.1
    • /
    • pp.1-10
    • /
    • 2014
  • This paper presents a case study that performed simulations on shovel-truck haulage systems in an open-pit mine by considering truck's breakdown and crusher's capacity. The SSangyoung limestone open-pit mine in Korea was selected as a study area and investigated to design the simulation algorithms. The GPSS/H simulation language is used to implement the simulation algorithms as a console application(simulator). The values of input parameters for simulator were measured by field investigation in the study area. The simulation results showed that 7 trucks can maximize the daily profit of haulage operations(i.e., 73,775 USD) when considers the frequency of trucks' breakdown as 1/40 $hour^{-1}$. In addition, the crusher capacity of 1300 tph is required to improve the efficiency of shovel-truck haulage systems in the study area.

Model test on slope deformation and failure caused by transition from open-pit to underground mining

  • Zhang, Bin;Wang, Hanxun;Huang, Jie;Xu, Nengxiong
    • Geomechanics and Engineering
    • /
    • v.19 no.2
    • /
    • pp.167-178
    • /
    • 2019
  • Open-pit (OP) and underground (UG) mining are usually used to exploit shallow and deep ore deposits, respectively. When mine deposit starts from shallow subsurface and extends to a great depth, sequential use of OP and UG mining is an efficient and economical way to maintain mining productivity. However, a transition from OP to UG mining could induce significant rock movements that cause the slope instability of the open pit. Based on Yanqianshan Iron Mine, which was in the transition from OP to UG mining, a large-scale two-dimensional (2D) model test was built according to the similar theory. Thereafter, the UG mining was carried out to mimic the process of transition from OP to UG mining to disclose the triggered rock movement as well as to assess the associated slope instability. By jointly using three-dimensional (3D) laser scanning, distributed fiber optics, and digital photogrammetry measurement, the deformations, movements and strains of the rock slope during mining were monitored. The obtained data showed that the transition from OP to UG mining led to significant slope movements and deformations that can trigger catastrophic slope failure. The progressive movement of the slope could be divided into three stages: onset of micro-fracture, propagation of tensile cracks, and the overturning and/or sliding of slopes. The failure mode depended on the orientation of structural joints of the rock mass as well as the formation of tension cracks. This study also proved that these non-contact monitoring technologies were valid methods to acquire the interior strain and external deformation with high precision.

Some Suggestions to Reduce Environmental Hazards from Open Pit Mining and to Revise Related Regulations for Limestone Mines (석회석 자원의 노천채굴에 따른 환경 오염원의 저감 및 관련 제도의 개선방안)

  • 임한욱;백환조
    • Tunnel and Underground Space
    • /
    • v.9 no.3
    • /
    • pp.230-237
    • /
    • 1999
  • Production of limestone for cement in Kangwon and Chungbuk areas reaches over 80 million tonnes per year. However, many regulatory activities for preservation of the environment against potential hazardous impacts from the open pit mining make it difficult for the industry. With recent improvement of the mining methods and working conditions, the regulations related to the quarrying of limestone may need to be revised. Methods for reducing environmental hazards are proposed in this paper, with some suggestions concerning the revision of related regulations. This study is expected to serve as a practical solution for the cement industry in balance of preservation and development.

  • PDF

Ecological Restoration Monitoring of Open-Pit Mines using Airborne Laser Scanning (항공레이저측량 데이터를 이용한 노천광산 생태복원 모니터링)

  • Lee, Hyun-Jik;Yang, Seung-Ryong;Lee, Kyu-Man
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.16 no.4
    • /
    • pp.101-107
    • /
    • 2008
  • Due to increased interest in environmental friendly ecological development and restoration, civil appeals concerning various environmental and landscape problems are continuously being lodged in cases where open-pit limestone mines are situated in places with eminent natural landscape. In this study, with the open-pit limestone mines located in the Baekdu mountain range as a study area, intends to contribute in recognition of various environmental problems and in the promotion of a reasonable restoration plan through high quality geo-spatial information. And it is planning to establish a method for sustained monitoring of the limestone mining by building intelligent national land information of the study area through combining Airborne Laser Scanning and Terrestrial LiDAR based surveying.

  • PDF

Construction of 3D Geospatial Information for Development and Safety Management of Open-pit Mine (노천광산 개발 및 안전관리를 위한 3차원 지형정보 구축 및 정확도 분석)

  • Park, Joon Kyu;Jung, Kap Yong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.38 no.1
    • /
    • pp.43-48
    • /
    • 2020
  • Open pit mines for limestone mining require rapid development of technologies and efforts to prevent safety accidents due to rapid deterioration of the slope due to deforestation and rapid changes in the topography. Accurate three-dimensional spatial information on the terrain should be the basis for reducing environmental degradation and safe development of open pit mines. Therefore, this study constructed spatial information about open pit mine using UAV(Unmanned Aerial Vehicle) and analyzed its utility. images and 3D laser scan data were acquired using UAV, and digital surface model, digital elevation model and ortho image were generated through data processing. DSM(Digital Surface Model) and ortho image were constructed using image obtained from UAV. Trees were removed using 3D laser scan data and numerical elevation models were produced. As a result of the accuracy analysis compared with the check points, the accuracy of the digital surface model and the digital elevation model was about 11cm and 8cm, respectively. The use of three-dimensional geospatial information in the mineral resource development field will greatly contribute to effective mine management and prevention of safety accidents.