• Title/Summary/Keyword: Open pit

Search Result 104, Processing Time 0.023 seconds

Designing a Vehicles for Open-Pit Mining with Optimized Scheduling Based on 5G and IoT

  • Alaboudi, Abdulellah A.
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.3
    • /
    • pp.145-152
    • /
    • 2021
  • In the Recent times, various technological enhancements in the field of artificial intelligence and big data has been noticed. This advancement coupled with the evolution of the 5G communication and Internet of Things technologies, has helped in the development in the domain of smart mine construction. The development of unmanned vehicles with enhanced and smart scheduling system for open-pit mine transportation is one such much needed application. Traditional open-pit mining systems, which often cause vehicle delays and congestion, are controlled by human authority. The number of sensors has been used to operate unmanned cars in an open-pit mine. The sensors haves been used to prove the real-time data in large quantity. Using this data, we analyses and create an improved transportation scheduling mechanism so as to optimize the paths for the vehicles. Considering the huge amount the data received and aggregated through various sensors or sources like, the GPS data of the unmanned vehicle, the equipment information, an intelligent, and multi-target, open-pit mine unmanned vehicle schedules model was developed. It is also matched with real open-pit mine product to reduce transport costs, overall unmanned vehicle wait times and fluctuation in ore quality. To resolve the issue of scheduling the transportation, we prefer to use algorithms based on artificial intelligence. To improve the convergence, distribution, and diversity of the classic, rapidly non-dominated genetic trial algorithm, to solve limited high-dimensional multi-objective problems, we propose a decomposition-based restricted genetic algorithm for dominance (DBCDP-NSGA-II).

Database Enhancement for Development of Open-pit Mine Monitoring System in Open Source Environments (오픈 소스 환경의 노천광산 모니터링시스템 개발을 위한 데이터베이스 고도화 방안)

  • Kim, Se-Yul;Yu, Ji-Ho;Yu, Young-Geol;Lee, Hyun-Jik
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.34 no.1
    • /
    • pp.21-32
    • /
    • 2016
  • Open-pit mines are the critical infrastructure for acquiring natural resources. Since it could be endangered by environmental and safety problems during operations, continuous monitoring is required for this type of mine. However, the domestic level management and accumulation of present state data of the topographical alteration are incurred by the development and restoration of open-pit mines relying on digital topographic maps and site surveys. Because of it, other than an expert cannot be viewed easily examines those changes information of open-pit mines in the domestic level. If the efficient management and public access of the open-pit mine is targeted, it is easy to build a web-based three-dimensional monitoring system, utilized in the space information software of open source. Therefore, we purposed on developing an open-pit mine monitoring system to support the development and restoration of the ecology-friendly environment, which could be easily monitored by the general public for those changes within terrain and environments due to operations of the mine.

Establishment of Tailing Disposal Scenario in Open-Pit and Surface Pillar Stability Analysis (노천채굴적 내 광미 적치 시나리오 구축 및 천반 수평필러 안정성 분석)

  • Il-Seok Kang;Jae-Joon Song;Thomas Pabst
    • Tunnel and Underground Space
    • /
    • v.34 no.1
    • /
    • pp.54-70
    • /
    • 2024
  • Utilization of completed open-pit for mining waste disposal is an alternative method of tailing storage facility (TSF), which can minimize the area and cost required for the installation of TSF. However, long-term tailing disposal into open-pit has a potential risk of reducing mechanical stability of surrounding rock mass by acting as an additional load. In this research, a realistic open-pit tailing disposal scenario of 60,400 hours was established based on the case of Marymia gold mine, Australia. Mechanical stability of surface pillar between open-pit and underground stope was analyzed numerically by using Sigma/W, under different stope geometry and rock mass conditions. Simulation results showed that long-term tailing disposal into open-pit can significantly increase the failure probability of surface piller. This result suggests that mechanical stability of mine geometry should be conducted beforehand of open-pit tailing disposal.

Development Environment for Open-pit Mine Monitoring System using Geospatial Open Platform and Open Source Software (공간정보오픈플랫폼 및 오픈 소스 기반의 노천광산 모니터링시스템 개발을 위한 환경 조성)

  • Lee, Hyun Jik;Kim, Se Yul;You, Ji Ho
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.22 no.4
    • /
    • pp.165-173
    • /
    • 2014
  • Open-pit mining method, is safe relatively work as compared with underground mining. And high yield, low production cost, has the advantage that it can provide a lot of production. But deforestation, tailings and slag deposition, mineral debris, dust, water, noise, land subsidence, sediment runoff discharge, I have internalized environmental disaster predisposing factors, such as landslides. Thus, it may be noted, also by typical environmental regulations. We try to deal with the changes in open pit terrain and environment related issues. Then, use the recovery period and the open pit mine and ecology off the gun, environment-friendly development of accurate monitoring methods, systems of this development is required. The use of open platforms and open source GIS tools have been developed during this period, it needs to develop spatial information environment monitoring system open pit mine construction.

Engineering Approaches and Recent Advances of Slope Optimization in Surface Mines (노천광산에서의 사면 최적화를 위한 공학적 접근 및 최신 동향)

  • Park, Jun-Hyeok
    • Explosives and Blasting
    • /
    • v.39 no.3
    • /
    • pp.35-43
    • /
    • 2021
  • Slope optimization aims to maximize the slope angle in an open pit mine, resulting in subsequent profits from additional ore extraction. The large open pit mines have adopted the advanced technologies to increase slope angle until they ensure the slope stability. This paper introduces a current stage of slope optimization efforts and best practices from the open pit mines.

Activity of the Fushun West Open-pit Mine in China Observed by Sentinel-1 InSAR Coherence Images

  • Jung, Da-woon;Lee, Hoonyol
    • Korean Journal of Remote Sensing
    • /
    • v.38 no.4
    • /
    • pp.365-374
    • /
    • 2022
  • Mining activity causes environmental pollution and geological hazards such as ground subsidence or landslide of which continuous monitoring is necessary. In this study, the activity on the Fushun West Open-Pit Mine (FWOPM), one of the largest open-pit coal mines in Asia located in Fushun, Liaoning Province, China, was analyzed by using a time-series Sentinel-1 InSAR coherence dataset. By using the difference between the two Digital Elevation Models (DEM) of the area, it was possible to confirm that there was a stockpiling activity in the western area of the FWOPM while excavation activity in the eastern area. By using RGB composite images using the yearly-averaged InSAR coherence images, the activity of the mine was confirmed by period, which was confirmed by Google Earth optical images. As a result, it was possible to confirm three landslides and the related activities on the northwest slope and the dumping activity on the west slope of FWOPM.

A Vibration Evaluation and Improvement Scheme for Open Test Blasting (노천시험발파의 진동평가와 개선방안)

  • Kim, Eung-Rok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.1
    • /
    • pp.310-315
    • /
    • 2017
  • Although studies evaluating the effects of the blasting vibration on the adjacent structures from various angles have continued, cases of securing the safety of the adjacent buildings and researching the proper blasting method for the field condition by analyzing the vibration waveform of the measuring field while performing the open pit blasting are poor. Therefore, it is necessary to present a remedy for blasting pattern selection through test blasting that is appropriate for field conditions, and is economical and efficient. In this study, open pit blasting work was conducted based on the separation distance applied according to the standard blasting method by test blasting and the vibration regulation standard in the road expansion construction site to measure the blasting vibration value, and the vibration prediction equation by blasting methods was examined using a regression analysis computer program to calculate K, N, and R of the confidence level 95%. By setting the blasting allowed vibration standard of the test blasting target area to 0.3cm/sec, and the charring weight and blasting method by the separation distances according to the blasting vibration estimation equation of the open pit blasting guideline and the blasting vibration estimation equation of the test blasting were compared/analyzed, it was possible to identify the factors that increased the working expenses. In addition, the measurement and analysis of the adjacent structures during open pit blasting and the blasting vibration were performed after selecting the most adjacent structure to the open pit blasting spot to analyze the problems on the test blasting procedure and analysis method in the open pit blasting design/construction guidelines, which appeared in the process of completing open pit blasting construction, and a remedy is presented.

A Study on Application of Kuz-Ram model to Domestic Open-pit Limestone Mine (국내 석회석 노천광산에 대한 Kuz-Ram 모델의 적용성에 관한 연구)

  • Lee, Seung-Joong;Kim, Byung-Ryeol;Choi, Sung-Oong;Jin, Yeon-Ho;Jung, Min-Su;Min, Hyung-Dong
    • Tunnel and Underground Space
    • /
    • v.26 no.2
    • /
    • pp.120-130
    • /
    • 2016
  • Considering the applicability of Kuz-Ram model, which has been used extensively for predicting rock fragmentation size distribution by blasting, to domestic open-pit limestone mine, a total of 21 blasting tests have been executed at an open-pit limestone mine in eastern Gangwon of South Korea. A comparative analysis of field measured value and Kuz-Ram predicted value showed that there are a considerable amount of error in the predicted values regardless of application of various correction parameters for rock factor and uniformity factor; up to 56.45% in mean fragmentation size and 37.52% in uniformity index. Also the problem of applying different correction parameters has been derived even though a similar blasting pattern has been adopted for a same blasting bench. The authors therefore suggest that Kuz-Ram model needs to be modified for a proper application to domestic open-pit limestone mine.

Development of a Windows-based Simulation Program for Selecting Equipments in Open-pit Shovel-Truck Haulage Systems (노천광산 쇼밸-트럭 운반 시스템의 장비선택을 위한 Windows용 시뮬레이션 프로그램 개발)

  • Park, Sebeom;Lee, Sungjae;Choi, Yosoon;Park, Han-Su
    • Tunnel and Underground Space
    • /
    • v.24 no.2
    • /
    • pp.111-119
    • /
    • 2014
  • This study developed a Windows-based simulation program for selecting equipments in open-pit shovel-truck haulage systems. Visual Basic.NET 2012 was used to develop the graphic user interface (GUI) and the GPSS/H simulation language was utilized to implement the simulation engine of program. When users establish simulation parameters through the GUI, the program calls the simulation engine to perform the simulations repeatedly. Then, it finds the optimal fleet of equipments required for operating the open-pit shovel-truck haulage systems efficiently. Application of the program to the Ssangyong open-pit limestone mine, Gangwon-do, Korea, showed that the daily average profit of shovel-truck haulage operation can be maximized (i.e. 88,552 USD) under following conditions: (a) 4 trucks are dispatched into each loading point and (b) a crusher with capacity of 1,500tph is utilized.

Optimal Routes Analysis of Vehicles for Auxiliary Operations in Open-pit Mines using a Heuristic Algorithm for the Traveling Salesman Problem (휴리스틱 외판원 문제 알고리즘을 이용한 노천광산 보조 작업 차량의 최적 이동경로 분석)

  • Park, Boyoung;Choi, Yosoon;Park, Han-Su
    • Tunnel and Underground Space
    • /
    • v.24 no.1
    • /
    • pp.11-20
    • /
    • 2014
  • This study analyzed the optimal routes of auxiliary vehicles in an open-pit mine that need to traverse the entire mine through many working points. Unlike previous studies which usually used the Dijkstra's algorithm, this study utilized a heuristic algorithm for the Traveling Salesman Problem(TSP). Thus, the optimal routes of auxiliary vehicles could be determined by considering the visiting order of multiple working points. A case study at the Pasir open-pit coal mine, Indonesia was conducted to analyze the travel route of an auxiliary vehicle that monitors the working condition by traversing the entire mine without stopping. As a result, we could know that the heuristic TSP algorithm is more efficient than intuitive judgment in determining the optimal travel route; 20 minutes can be shortened when the auxiliary vehicle traverses the entire mine through 25 working points according to the route determined by the heuristic TSP algorithm. It is expected that the results of this study can be utilized as a basis to set the direction of future research for the system optimization of auxiliary vehicles in open-pit mines.