• Title/Summary/Keyword: OnBid

Search Result 547, Processing Time 0.027 seconds

A Study on the Evaluation System for Bidders to According to the Best Value Bid System by Technology Proposal Method (기술제안방식의 최고가치낙찰제도 입찰자 평가체계에 관한 연구)

  • Yeo, Sang-Ku;Lee, Gun;Lee, Hyun-Chul;Go, Seong-Seok
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.04a
    • /
    • pp.211-216
    • /
    • 2009
  • Bidding systems in the domestic public construction work have been amended many times since the lowest-bidding system was implemented in 1951. However, this hasn't had much success. Competition in technical development among companies has declined as the contracts for buildings are given to company which submits the lowest price without considering traits of projects. In addition, as the construction market turns to the limitless competition system due to FTA(Free Trade Agreement), advanced techniques are needed to promote the national competitive power. Considering the needs of the times, Korean government announced that "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" are included to 4 existing bidding systems in October 2007. Thus this study aims to suggest devised the evaluation criteria including major items for evaluating bidders, in order to establish and revitalize the best-value bid system successfully.

  • PDF

IMPLEMENTATION OF GOVERNMENT E-PROCUREMENT: A COMPARATIVE STUDY OF THAILAND AND INDONESIAN PRACTICES

  • Budi Hasiholan;Shin-ei TAKANO
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.827-834
    • /
    • 2009
  • In respond to the demand of an open, fair, transparent, and efficient environment for procurement, many governments have incorporated the use of internet in their procurement systems with online procurement (e-procurement). Given the different policies and laws which have to be complied with, the practice of government e-procurement system varies from one country to another. Thus, experiences in running e-procurement will vary as well. The achievements and obstacles of one country's experience will be a constructive reference for other countries in establishing e-procurement system. In this regard, government e-procurement system practices in two Southeast Asia countries i.e., Thailand and Indonesia particularly in public works are consecutively presented and finally compared in this paper. The government of Thailand has applied Online Auctions (e-Auctions) as the national procurement practice since 2005 and performed the e-Auctions in two types: Reverse Auction and Sealed Bid Auction. Contrary to the common practice of e-procurement, the Thai government, with some rationales, runs the bid documents obtaining manually as well as qualification and technical documents submission and holding the e-Auctions at bidding office. Whereas Indonesian government runs Online Sealed Bid Bidding (e-Procurement) and most of the bidding stages are performed electronically except bid evaluation for both technical and financial. The advantages and drawbacks of these two e-procurement practices are discussed as well as improvements that have to be made for successful of e-procurement.

  • PDF

A Study on the International Communication System in International Bidding (국제통신시스템 국제입찰에서의 입찰행태 분석)

  • Hong, Seung-Gee;Hwan, Ho-Yon
    • International Commerce and Information Review
    • /
    • v.7 no.2
    • /
    • pp.25-47
    • /
    • 2005
  • This study wishes to analyze that affect in purchasing decision in Telecommunication operation company's international competitive bidding. When submit a tender laying stress on international competitive bidding of the Telecommunication operation companies among specially various international competitive bidding, I wish to investigate game theory enemy by bid method through access method about bid form affecting in buyer's purchasing decision.

  • PDF

Asset Pricing and the Volume Effect

  • Park, Jin-Woo;Dukas, Stephen
    • The Korean Journal of Financial Studies
    • /
    • v.2 no.1
    • /
    • pp.127-144
    • /
    • 1995
  • Previous literature in financial economics documents the existence of a liquidity premium in expected returns, measured by the bid-ask spread. This study provides a more comprehensive test of the egect of liquidity on common stock returns by including trading volume as an additional liquidity measure. we find that trading volume is a relevant measure of liquidity, and affects expected returns even aher controlling for the effects of systematic risk, firm size, and the relative bid-ask spread. We also find that trading volume complements the bid-ask spread as a liquidity measure, and provides additional information about the liquidity premium. The liquidity effect emerges in non-January months as a volume effect, in addition to the spread effect in January documented by Eleswarapu and Reinganum(1993).

  • PDF

Supply Function Nash Equilibrium Considering Stochastic Demand Function (확률적 수요함수를 고려한 공급함수의 전략변수 내쉬균형 연구)

  • Lee, Kwang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.1
    • /
    • pp.20-24
    • /
    • 2008
  • A bid-based pool(BBP) model is representative of energy market structure in a number of restructured electricity markets. Supply function equilibrium(SFE) models of interaction better match what is explicitly required in the bid formats of typical BBP markets. Many of the results in the SFE literature involve restrictive parametrization of the bid cost functions. In the SFE models, two parameters, intercept and slope, are available for strategic bidding. This paper addresses the realistic competition format that players can choose both parameters arbitrarily. In a fixed demand function, equilibrium conditions for generation company's profit maximization have a degree of freedom, which induces multi-equilibrium. So it is hard to choose a convergent equilibrium. However, consideration of stochastic demand function makes the equilibrium conditions independent each other based on the amount of variance of stochastic demand function. This variance provides the bidding players with incentives to change the slope parameter from an equilibrium for a fixed demand function until the slope parameter equilibrium.

The Impact of Design-Bid-Build Procurement Methods on Project Performance in Libya

  • Ghadamsi, Alaeddin;Braimah, Nuhu
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.16-23
    • /
    • 2016
  • The use of inappropriate procurement methods to deliver construction projects has long been acknowledged as a major source of poor project performance and is particularly problematic for the Libyan Construction Industry. Poor procurement method selection has been recognised as a major contributory factor to frequent time and cost overruns. This paper offers a way of selecting specific procurement methods to maximize successful project performance. The methodology involves an intensive review of relevant literature, followed by a semi-structured questionnaire survey. The key findings of the study reveal that 11 out of its 12 common selection criteria exhibit a significant contribution to one or more project performance criteria (time, cost and quality). Project clients should therefore prioritise these criteria when selecting a design-bid-build method. Knowledge of the criteria that contribute positively to project performance will also enable clients to work out, prior to and during construction, the best measures and provisions for successful project outcomes.

A Study of Durability Design in the Subway Concrete Box Structure (지하철 콘크리트 BOX구조물의 내구성설계에 대한 연구)

  • Kwon Young-Chan;Kim Eun-Kyum
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.940-956
    • /
    • 2004
  • In the course of studying the design of securing the 100-year-long durability of 100 years the subway structure according to the requested service by the Seoul Metropolitan Subway Construction Headquarters, we analyzed 14 construction sites adopting the durability design in subway line No. 9 and concluded as follows: 1. When comparing with 158, the environment index presented for securing 100-year-long durability of subway structure in subway line No. 9, the index of durability was verified as 159.7$\~$179.8 2. When examining the increase value of durability index, we verified that the constructors didn't make various choices in method but they employed the uniformly selected system. 3. Under consideration of the bid form, the construction under bid contract in bulk gave the impacts on the construction cost with attention to selection of the durability index, while the construction under alternative contract in bid adopted uniformly the standard presented by the ordering party.

  • PDF

Study on the Effective management plan of Technical proposal bid.Business (기술제안입찰의 효율적 운영방안에 관한 연구 - 공공건설공사를 중심으로 -)

  • Choi, Hyun-Snag;Cho, Yong;Cho, Sung;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.107-111
    • /
    • 2009
  • This research provided the technology for the proposed bids to the efficient operation conditions for the application of the existing system of bids and bid proposal, the current technology of the institutional, problems were analyzed. The results of the technical proposal, the current bidding system has been exposed very early points, as ways to overcome these problems and to suggest effective operating plan was to define the details.

  • PDF

A Study on the Time Series Analysis of the Actual Unit Cost based on the Bid Prices (시계열을 이용한 실적단가 예측방안에 관한 연구)

  • Park, Won-Young;Seo, Jong-Won;Kang, Sang-Hyeok;Choi, Bong-Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.50-57
    • /
    • 2009
  • The Korea Standard of Estimate which has been used as the only basis of Cost estimate of public construction projects is failed to reflect the fluctuation of current construction cost. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004 and to reduce the use of Korean Standard of Estimate. This paper presents a series of process and the methodology for computing Actual Cost and analyzing the fluctuation patterns based on not only previous contract prices which made a successful bid but also all of the other bid prices. Also, this paper mainly handles a device for extracting strategic bid price such as low price bid for assuring reliable data and for predicting the construction cost which is built by Wavelet Analysis of Time series Analysis data and Neural Network. It is anticipated that the effective use of the proposed process for estimating actual unit cost would make the cost estimation more current and reasonable.

To Bid or Not to Bid? - Keyword Selection in Paid Search Advertising

  • Ma, Yingying;Sun, Luping
    • Asia Marketing Journal
    • /
    • v.16 no.3
    • /
    • pp.23-33
    • /
    • 2014
  • The selection of keywords for bidding is a critical component of paid search advertising. When the number of possible keywords is enormous, it becomes difficult to choose the best keywords for advertising and then subsequently to assess their effect. To this end, we propose an ultrahigh dimensional keyword selection approach that not only reduces the dimension for selections, but also generates the top listed keywords for profits. An empirical analysis using a unique panel dataset from a large online clothes retailer that advertises on the largest search engine in China (i.e., Baidu) is presented to illustrate the usefulness of our approach.