• Title/Summary/Keyword: On-site Construction Factory

Search Result 104, Processing Time 0.023 seconds

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

In-situ Production Effect Analysis of Precast Concrete Elements (PC 부재의 현장 생산효과 분석)

  • Lee, Dong-Joo;Oh, Jin-Hyuck;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.52-53
    • /
    • 2021
  • PC (Precast Concrete) method was preferred for reasons such as shortening of construction period, cost reduction, and quality. However, in the case of factory production, precast concrete has a problem in that transportation conditions in the transportation process, damage during transportation, overhead and profit of the factory are required. If work and PC members are produced on site, transportation and installation costs can be reduced. However, research on field production has not been conducted. Therefore, based on the on-site production plan without PC, the cost and quality of factory production and on-site production are compared and analyzed.

  • PDF

A Study on the Productivity Analysis of a Building Automation System (건물구조체(建物構造體) 자동화(自動化) 시스템의 생산성(生產性) 분석(分析)을 위한 기초적(基礎的) 연구(硏究))

  • Kim, Chang-Kyu;Song, In-Shick;Lee, Hyun-Soo;Lim, Sang-Chae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.111-115
    • /
    • 2008
  • The productivity is the one of the primary elements to evaluate the new systems performance for building construction along with the economic efficiency, the safety, and the quality improvement. At present the on-site construction automation systems(we will call it as Construction Factory or CF hereafter) is under the development by research group for construction automation of high-rise building. The system includes many sub-systems such as a robotic crane, a construction factory, bolting robots, a building material management system using RFID and so on. In this study we discuss and propose the method to evaluate for these hybrid on-site automation system fundamentally. In future we devise a framework of evaluation modules for the on-site building automation system on the basis of this discuss.

  • PDF

A Study on the Performance Evaluation System for the Construction Factory System Applied to High-Rise Building Construction in Korea (우리나라 초고층용(超高層用) 건설(建設)팩토리 개발(開發)을 위한 성능평가체계(性能評價體系)에 관(關)한 기초적(基礎的) 연구(硏究))

  • Choi, Won-Jun;Kim, Chang-Kyu;Song, In-Shick;Lim, Sang-Chae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.11a
    • /
    • pp.105-108
    • /
    • 2007
  • This study aims to develop a performance evaluation system for the Construction Factory(CF). The CF is a kind of full automation system for building construction which consists of the lifting system for building materials, the built-up unit for steel structural components, the bolting robots, the control center for the site management, and the site covering system. The CF is developing now as a project of the construction automation and robotics. In this study we firstly reviewed the state-of-the-art of the construction automation and robotics in the foreign and the domestic, and investigated the precedent case of the CF such as the SMART System of Shimizu Co., Japan. We believe that without an objective evaluation of the results there won't be growth in technological R&D. Therefore, this study sees the developing CF as an new technology and method in building construction, and proposes the direction and frame of the appropriate evaluation which can be applied into the CF.

  • PDF

A Study on Safety Validation of Climbing Hydraulic Robot System for Automation in Construction (시공자동화를 위한 크라이밍 유압로봇의 안정성에 관한 연구)

  • Lee, Myung-Do;Choi, Hee-Bok;Lee, Kyu-Won;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.15-19
    • /
    • 2009
  • As robotic technologies have become more actively utilized to automate many construction tasks, they have been able to improve the construction productivity, quality, and workers safety on site. A new system, of which Robot-based Construction Automation (RCA), is currently being developed, and RCA systems consist of Construction Factory(CF), Automated Bolting Robots, and Climbing Hydraulic Robot. Especially. Climbing Hydraulic robot system is very important to RCA systems because of function as lifting the Construction Factory. In this paper, We validate safety of Climbing Hydraulic Robot system before application for real building construction.

  • PDF

Derivation of the Construction Process for Precast Concrete System based on Off-Site Construction (OSC(Off-Site Construction)기반 PC공법의 시공 프로세스 도출)

  • Jun, Young-Hun;Bae, Byung-Yun;Yun, Won-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.289-290
    • /
    • 2021
  • The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.

  • PDF

A Study on Development of Construction Standard Production Rates and Cost Analysis for Off-Site Construction (OSC)-Based PC Structure Construction Costs - Comparison with RC Method - (OSC기반 PC구조 공사비 산정을 위한 품셈개발 및 공사비 분석 - RC공법과 비교 -)

  • Lee, Hansoo;Lee, Chiho;Han, Heesu;Lee, Jeongwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.56-68
    • /
    • 2024
  • A construction standard production rates system for the factory built and on-site installation phases of OSC (Off-Site Construction)-based precast concrete (PC) structures in apartment buildings was recently proposed to establish an objective cost standard (Lee et al., 2021). In addition, the Korean government has taken steps to improve the institutional foundation for the systematic calculation of PC construction costs such as revising construction standard production rates for major components that can be applied to the on-site installation phase of PC method. In this study, we analyzed the results of a field survey of apartment building PC structures and collected expert opinions to develop factory-built and on-site installation standard production rates that can be applied to apartment building PC method. We also propose directions for improving the standard production rates so that they can be applied to the site and component of apartment buildings by comparing them with the current standard production rates. This study also derived the cost characteristics and cost reduction measures of PC construction by calculating the construction costs using the developed rates and comparing the construction costs with the RC methods of apartment buildings of the same scale. The construction standard production rates for PC construction derived in this study are expected to contribute to the spread of PC construction by ensuring the objectivity and consistency of the results of PC methods cost estimation.

A Study of Developing Guides for the Construction Site Quality Control of Porous Concrete (투수콘크리트 현장품질관리 지침서 개발에 관한 연구)

  • Ko, Eun-Jung;Goh, Eun-Joo;Seok, Ho-Joong;Lee, Seung-Hyeok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.3
    • /
    • pp.65-71
    • /
    • 2009
  • General criteria for the quality of porous concrete have not been established yet in Korea. And yet, pavement and construction have been performed. In this paper, guidelines on the construction site quality control of porous concrete were developed in order to establish criteria for resolving the issues and problems of porous concrete, to establish methods for improving poor performance, and to manage porous concrete more systematically. In addition, a guide for the construction site quality control of porous concrete, which was appropriate for reality, was developed by researching several quality control guides and maintenance at construction sites. The guide consists of a total of nine chapters such as Application Range, Overview, the Structure of Porous Concrete, the Design of Package Thickness, Package Materials for Porous Concrete, Construction Methods, Quality Assurance and Inspections, Construction Site Quality Control, and Maintenance. It describes quality control guidelines in all steps such as methods for transporting porous concrete from the factory to the construction site, cautions for construction work at construction sites, maintenance, and management. The Guide for the Construction Site Quality Control of Porous Concrete is expected to ensure the quality of porous concrete, to reduce national costs for quality assurance, and to help ensure the health and safety of Korean people.

AI Smart Factory Model for Integrated Management of Packaging Container Production Process

  • Kim, Chigon;Park, Deawoo
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.13 no.3
    • /
    • pp.148-154
    • /
    • 2021
  • We propose the AI Smart Factory Model for integrated management of production processes in this paper .It is an integrated platform system for the production of food packaging containers, consisting of a platform system for the main producer, one or more production partner platform systems, and one or more raw material partner platform systems while each subsystem of the three systems consists of an integrated storage server platform that can be expanded infinitely with flexible systems that can extend client PCs and main servers according to size and integrated management of overall raw materials and production-related information. The hardware collects production site information in real time by using various equipment such as PLCs, on-site PCs, barcode printers, and wireless APs at the production site. MES and e-SCM data are stored in the cloud database server to ensure security and high availability of data, and accumulated as big data. It was built based on the project focused on dissemination and diffusion of the smart factory construction, advancement, and easy maintenance system promoted by the Ministry of SMEs and Startups to enhance the competitiveness of small and medium-sized enterprises (SMEs) manufacturing sites while we plan to propose this model in the paper to state funding projects for SMEs.

BIM Application Method for the Quality Management of Modular Houses (모듈러주택 품질관리를 위한 BIM 적용 방안)

  • Lee, Dong Gun;Kim, Jin Won;Sohn, Jeong Rak
    • Land and Housing Review
    • /
    • v.10 no.2
    • /
    • pp.59-67
    • /
    • 2019
  • The recent paradigm shift in the construction industry has led to a growing demand for industrial construction. In particular, interest in modular housing, one of the areas of industrialization architecture, is soaring. Modular housing is a construction method for completing a building by transporting factory-built modules to the site and assembling them. However, modular housing in Korea has various problems such as errors in design books, lack of factory drawings, and lack of on-site construction plans. BIM is a tool for accumulating, producing and managing various information through 3D models and is a solution to solve various problems of modular housing. In this study, problems of modular housing and BIM utilization of modular housing were presented as ways to ensure the quality of modular housing. Therefore, this study analyzed the problems that are occurring in the construction process of modular housing. And, to address the problem of modular housing, BIM utilization measures were proposed for each modular process step. However, the application of BIM in domestic modular project is currently being carried out in pilot research project. Because of this, the BIM utilize method for modular housing is limited based on the BIM use for general projects and the examples for some modular pilot projects.