• Title/Summary/Keyword: On-Line Test

Search Result 3,389, Processing Time 0.033 seconds

A Result Analysis on Field Test for Localization Development of Axle Counter System (Axle Counter System 국산화 개발을 위한 현장시험 결과분석)

  • Ko, Joon-Young;Park, Jae-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.6214-6220
    • /
    • 2015
  • A track circuit has used stably more than 100 years for detecting train position, but solution of track circuit sort circuit incapacity due to a rust is necessary for side line in station yard, coast line and level crossing for conventional line in rural line. Domestically, Axle Counter System(ACS) has partially used for Hot Box System for high speed line and turnout for CBTC system. In contrast, most of countries has used ACS not only trunk line but also rural line and its application has increased for metro, electric car and industrial railway. In this paper, we has verified the operating status of ACS which installed with existing track circuit through log analsis to implement pilot application in mail track and turnout in station yard. And interface test with interlocking system has conducted at Obong shunting yard, as well as Cheongju station and has analyzed test result. Based on a test result, we made fail safe design, manufacturing skill and established system requirement specification for the smooth operation and maintenance.

Trend in Off-Line PD Monitoring with HVAC Testing (배전반 설비의 온라인 모니터링 및 진단의 동향)

  • Yun, Ju-Ho;Hong, Chang-Il;Hwang, Jong-Sun;Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2007.06a
    • /
    • pp.529-530
    • /
    • 2007
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

Assessment of the Electrical Environmental Characteristics to Decide Optimal Bundle Type for HVDC ${\pm}500kV$ Overhead Transmission Lines (HVDC ${\pm}500kV$ 가공 송전선로의 최적 도체방식 선정을 위한 전기환경특성 평가)

  • Ju, Mun-No;Kil, Gyung-Suk;Yang, Kwang-Ho;Lee, Sung-Doo;Hwang, Gi-Hyun
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.55 no.11
    • /
    • pp.520-526
    • /
    • 2006
  • Corona interferences, such as radio noise, audible noise and television noise, need to be taken into account in the design of HVDC transmission line conductor configuration. Therefore the line designer requires data from which to estimate the corona performance of any set of conductors. To get a sufficiently complete set of design data, it is necessary to examine the corona test of a large number of conductor geometries. This paper presents the results of corona cage test among three types of candidate conductors. It is quite clear from test results that the conductor geometries play an important role in establishing the magnitude of corona noise. Corona noise data from corona cage test are expressed as a statistical distribution of results obtained over long periods of time and various weather conditions. Therefore we can determine an environmentally-friendly conductor bundle for HVDC overhead transmission line. Based on this finding results, various simulations about HVDC line configurations, such as pole space and pole height, will be conducted. And then finally an optimal configuration for HVDC transmission line will be decided.

A Case Study on Failure and Analysis of Air Over Hydraulic Brake Line (공기 유압식 브레이크 라인 파손 사례 및 파손 분석 연구)

  • Park, Jeongman;Park, Jongjin
    • Journal of Auto-vehicle Safety Association
    • /
    • v.12 no.2
    • /
    • pp.47-55
    • /
    • 2020
  • In this case study, the brake line failure of air over hydraulic(AOH) brake system is described. AOH brake system is applied to commercial vehicles between 5 to 8 tons. It consists of a hydraulic system using compressed air and operates the air master to form hydraulic pressure to transfer braking power to the wheels. When the brake lines of the system applied to vehicles with high load capacity are damaged, the braking force of one shaft is lost, and the braking distance increases rapidly, leading to a big accident. Failure of the brake line occurs due to various causes such as road surface fragmentation, corrosion of the line, and aged deterioration of air brake hose. The braking force could be decreased even when a very small break in the form of a pin-hole occurs. However, it is difficult to find a part where the thickness of the line is thin due to stone pecking or corrosion generated in the pin-hole formed on the brake line located under the lower part of the vehicle by the sensory evaluation or the conventional braking force test. Accordingly, it is necessary to analyze the condition and cause of the failure of the brake line more precisely when the accident investigation of the heavy vehicles, and also to examine the necessity of the advanced test for the aged brake line.

A Study on the Interface between a G7 Pantograph and a KTX Catenary System in Preparation for G7 On-line Tests in the Korea High Speed Test Track (고속 시험선 구간에서의 G7 본선 시운전에 대비한 G7 팬터그래프와 KTX 가선계와의 인터페이스 연구)

  • Cho, Yong-Hyeon;Kyung, Jin-Ho;Hur, Shin;Choe, Kang-youn;Kim, Ki-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.557-570
    • /
    • 2000
  • It is necessary to perform a study on the interrace between a G7 pantograph and a KTX catenary system prior to G7 on-line tests in the Korea High Speed Test Track in order to predict how high current collection quality can be obtained during the on-line tests and check if safety problems shall be caused b)Y the tests or not. According to the simulation results, current collection quality of the G7 pantograph at 350km/h is lower than that of a GPU pantograph at 300km/h, but the contact wire uplifts and average contact forces are within the safe-zone. In addition, the ratio of running speed (350km/h) to safe running. Therefore, the G7 on-line tests at 350km/h in the Korea High Speed Test Track is expected not to cause the safety problem.

  • PDF

Effectiveness of a Training Program Based on Stress Management on NEDSA Staff and Line Staff

  • Azad, Esfandiar;Hassanvand, Bagher;Eskandari, Mohsen
    • Safety and Health at Work
    • /
    • v.13 no.2
    • /
    • pp.235-239
    • /
    • 2022
  • Background: The purpose of present study was to determine the effectiveness of training program based on job stress management in NEDSA and line staff. Methods: The study method of this study was quantitative and quasi-experimental research Methods: From the statistical population (all employees of the NEDSA and line staff in 2020-2021), 30 of these people were selected by judgmental sampling method and considering the inclusion and exclusion criteria. The participants were first matched based on age and education and were randomly divided into experimental and control groups. First, pre-test was taken from both groups (Job Stress Questionnaire). The experimental group was presented with a job stress management training package and no protocol was presented in the control group. After the sessions, post-test was received from both groups (experimental and control). After two months, a follow-up test was performed. Results: The results were entered into SPSS-24 software and analyzed. The results of repeated measure showed high effectiveness of the job stress management package (researcher-made). The results showed that the job stress management training package showed 67.5% effectiveness and also the training effect of job stress management training was stable for two months (follow-up). Conclusion: Based on these results, Training program based on stress management can be effective in military staff.

Experimental Study on Firing Test of LPI Engine Using Gasoline Fuel for Improving the Production Process at End of line (엔진 착화 라인의 생산성 향상을 위한 LPI 엔진 가솔린 연료 적용성에 대한 실험적 연구)

  • Hwang, In-Goo;Choi, Seong-Won;Myung, Cha-Lee;Park, Sim-Soo;Lee, Jong-Soo
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.15 no.3
    • /
    • pp.133-140
    • /
    • 2007
  • The purpose of this study was to evaluate the effects of gasoline fuel to the LPI engine. Firing test bench was used in order to assess the effect on gasoline-injected LPI engine. Gasoline fuel was supplied into the reverse direction(3-4-2-1 cylinder) at 3.0 bar with commercial gasoline fuel pump. Engine test was performed using the firing test mode at end of line. The deviations of excess air ratio of each cylinder and maximum combustion pressure using gasoline fuel were within 0.1 and $1{\sim}2\;bar$. Engine start time was measured with changing coolant temperature at $20^{\circ}C,\;40^{\circ}C,\;80^{\circ}C$, respectively. Residual gasoline volume in the fuel line was measured about 32 cc after firing test and it was less than 2 cc within 10 seconds purging. To simulate the end of line, the residual gasoline in the fuel line was purged during 5 and 10 seconds. Start time of LPI engine with LPG fuel were 0.61 and 0.58 seconds. This work showed that severe problems such as misfiring and liner scuffing were not occurred applying gasoline fuel to LPI engine.

Comparison between test and simulation results of vibration for Korean High Speed Train (한국형 고속전철의 주행시험과 이론해석 결과의 비교분석)

  • 박찬경;김석원;김영국;목진용
    • Proceedings of the KSR Conference
    • /
    • 2003.10a
    • /
    • pp.210-215
    • /
    • 2003
  • Korean High Speed Train (KHST) has been tested on high speed line in JungBu site since it was developed in 2002. The KHST figured 7 cars was modeled for dynamic simulation with Vampire program. and the data acquisition system was used to test successfully the on-line test for proving the dynamic performance of KHST. The comparison between test and simulation results for dynamic behavior of KHST was tried in this paper and it was very difficult because the environmental conditions and running conditions have an effect on the test results and these conditions are unable to be modeled for dynamic analysis. Also the parameters for data acquisition system for test are usually not same to simulation conditions. Therefor, in this paper the acceleration data after filtering with low pass filter below 1Hz were used to compare between test and simulation results because the low frequency range is useful to evaluate the dynamic performance for railway vehicle system, so as steady state curving acceleration. The results show that both are similar in low frequency range.

  • PDF

A Case Study of On-line PD Measuring System on the Stator Winding for High Voltage Rotating Machine (고전압회전기 고정자권선 운전중 부분방전진단시스템의 현장적용사례 연구)

  • Oh, Bong-Keun;Kang, Dong-Sik;Lim, Kee-Joe
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2010.06a
    • /
    • pp.109-109
    • /
    • 2010
  • On-line partial discharge(PD) diagnostic system is the most prominent systems to diagnose insulation condition for the high voltage rotating machines. Partial discharge measuring system(PDMS) series with ceramic coupler(PD detecting sensor) installed hydro generator and high voltage motor have been measured the PD data for many years. The trend of PD magnitude in the on-line PD system increased for some machines. These machines showed a same result in the conventional off-line PD test and PD magnitude decreased after stator winding insulation cleaning. This case study show that PDMS has been proved to be good results by comparing PD magnitude with on-line and off-line PD test and it is important to plan the maintenance project for the hydro generator stator winding because PD value was decreased after insulation cleaning.

  • PDF

Development and Evaluation of the e-learning Orientation Program for Nursing Student's Adapting to Clinical Practicum (임상실습 적응을 위한 e-learning 오리엔테이션 프로그램 개발 및 평가)

  • Yi, Yeo Jin
    • Korean Journal of Adult Nursing
    • /
    • v.19 no.4
    • /
    • pp.593-602
    • /
    • 2007
  • Purpose: The purpose of this study was to develop an e-learning orientation program for nursing students(junior), to evaluate the program, and to find out its effects on adapting to clinical practicum. Methods: The e-learning orientation program was developed according to ADDIE model(analysis, design, develop, implement, evaluate) using an Active Tutor Program. Twelve nursing professionals and 31 nursing students(learners) evaluated the e-learning orientation program. Thirty one nursing students participated in the e-learning orientation program both on-line and off-line. Results: The e-learning orientation program consisted of 5 parts including 'Taking a lesson in gastrointestinal tract', 'Fundamental nursing skill and reading a medical chart', 'Taking a ward orientation by head nurse', 'Clinical practice with preceptors', and 'Writing for case report'. Adapting scores to clinical practicum were significantly different between pre-test and post-test(t=-5.76, p=.000). Conclusion: The e-learning orientation program of on-line and off-line has an effect on adapting to clinical practicum for nursing students.

  • PDF