• Title/Summary/Keyword: Offshore plant

Search Result 403, Processing Time 0.028 seconds

A Study on Effects of Partial Shading on PV System applied to the Offshore Plant

  • Lee, Ji Young;Yang, Hyang Kweon;Oh, Jin Seok
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.39 no.2
    • /
    • pp.152-158
    • /
    • 2015
  • Unlike photovoltaic systems installed on land, photovoltaic systems applied to the offshore plant have the characteristic that is installed in a limited space. For single point mooring plant, it is advantageous in terms of a reliable power supply to be installed in different directions of photovoltaic panels, because it is not possible to identify the position of the sun by rotation of the plant itself. Differences of installation angle between photovoltaic panels make a difference of the intensity of radiation irradiated on each photovoltaic panel, and it brings loss of generation quantity due to the partial shading. In order to provide a photovoltaic system suitable for offshore plant, the modeling which contains multiple photovoltaic panels controlled by single controller is performed. Then, it was examined how the output characteristics of the photovoltaic system change about the difference of the intensity of radiation that varies depending on the altitude of the sun. Finally, through the simulation, a development model of the photovoltaic system which is suitable for offshore plant is suggested.

Multi-floor Layout Model for Topsides of Floating Offshore Plant using the Optimization Technique (최적화 기법을 이용한 부유식 해양 플랜트 상부 구조의 다층 배치 모델)

  • Jeong, Se-Yong;Roh, Myung-Il;Shin, Hyunkyoung
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.52 no.1
    • /
    • pp.77-87
    • /
    • 2015
  • For a floating offshore plant such as FPSO(Floating, Production, Storage, and Off-loading unit), various equipment should be installed in the restricted space, as compared with an onshore plant. The requirement for an optimal layout method of the plant has been increased in these days. Thus, a layout method of the floating offshore plant was proposed in this study. For this, an optimization problem for layout design was mathematically formulated, and then an optimization algorithm based on the genetic algorithm was implemented with C++ language in order to solve it. Finally, the proposed method was applied to an example of FPSO topsides. As a result, it was shown that the proposed method can be applied to layout design of the floating offshore plant such as FPSO.

A Study on the Ballast Control System for Offshore Plant (Offshore Plant용 발라스트 제어 시스템에 관한 연구)

  • Oh, Jin Seok
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.17 no.12
    • /
    • pp.2944-2951
    • /
    • 2013
  • Recently, the offshore plant has been revived by rise in oil prices and energy consumption. Due to the external environmental impact, the ballast system is essential for an offshore plant. The ballast system for the existing offshore plant, consist of pump 6EA and Ballast tank 4EA, is performed by the tilt control. However, this system is vulnerable to a failure due to the fact that a lot of equipment needs to be installed within the system. In this paper, a new concept of ballast system and the control algorithm based on IT is proposed. Simulator has been created to test the proposed system and algorithm, and as a result, it has proven that it is controlled stably.

A Study on Improving the Efficiency of the Survival Rate for the Offshore Accommodation Barge Resident Using Fire Dynamic Simulation (화재시뮬레이션을 이용한 해양플랜트 전용생활부선 거주자의 생존율 향상에 대한 연구)

  • Kim, Won-Ouk;Lee, Chang-Hee
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.21 no.6
    • /
    • pp.689-695
    • /
    • 2015
  • The offshore plant crews that were commissioned in the commercial startup phase boarded the offshore plant in two shifts until the end of the project. The crews who were hired by the owner side stayed in the original offshore plant during the project. However, most of the offshore plant commissioned members who were dispatched from the shipyard were accommodated in the offshore accommodation barge. For this reason, they were exposed to many accidents since there are a lot of people staying in a small space. This study suggested a method for improving survival rate at offshore accommodation barge in terms of life safety. It is assumed that the fire accident among unfortunate events which take place in the offshore accommodation barge mainly occurred. So, this study analyzed the safety evacuation for offshore plant employees using fire simulation model based on both domestic and international law criteria. In particular, When fire occurs in the offshore accommodation barge, the periodically well trained crews are followed safety evacuation procedure. whereas many employees who have different background such as various occupations, cultural differences, races and nationality can be commissioned with improper evacuation behaviors. As a result, the risk will be greater than normal situation due to these inappropriate behaviors. Therefore, This study analyzed the Required Safe Escape Time (RSET) and Available Safe Escape Time (ASET). Also it was suggested the improvement of structure design and additional arrangement of safety equipment to improve the survival rate of the residents in offshore accommodation barge.

Establishment of Construction Procedure on the Off Shore Piping Work of a LNG Unloading Project (LNG 하역 플랜트의 Off Shore 배관시공절차 확립에 관한 연구)

  • Kim, Yong-Tan;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.4
    • /
    • pp.80-85
    • /
    • 2009
  • LNG stevedoring plant offshore pipelines requires human power and the longest construction period in constructing LNG storing terminal and influences on the success of the project absolutely. In this paper, the constructing procedures of LNG stevedoring plant offshore pipeline was established. Establishment of constructing procedures of LNG stevedoring plant offshore pipeline includes procurement of main equipments, iron frame and pipelines. To predict any expectable problems, that may occur by the stage of construction the application to the field works with a base of theoretical and practical contents for the constructing procedures of LNG stevedoring plant offshore pipelines can be established.

  • PDF

A Study on the Trends and Development Plans for the trainee who completed BOSIET course -Focusing on the STCW and OPITO Safety Training- (해양플랜트 기초안전교육에 참여하는 교육생의 동향 분석 및 개선 방안에 대한 연구 -STCW 협약교육과 OPITO 교육 중심-)

  • WOO, Young-Jin;LEE, Chang-Hee
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.27 no.4
    • /
    • pp.938-947
    • /
    • 2015
  • As many offshore plants are built domestically, many workers get various jobs in the offshore plants directly or indirectly. But workers(including seaman and non-seaman) still have hard time to getting the job in offshore plants because they still rely on personal contacts and limitation of adaptable positions. Now people who want to work at offshore plants have to get safety training under the regulation and request of IMO/STCW and OPITO. Recently OPITO reinforced offshore safety training and discussed the mutual agreement between IMO/STCW and OPITO. Therefore this study searched legal standards for offshore plant work and the trend of offshore safety training. Base on a survey among domestic delegates who completed BOSIET course from 2010, we now understand the actual situations in finding an effective way on how to advance domestic workers in the offshore plant industry.

A study on entry into the offshore service market through slack model (해양플랜트 서비스 시장에의 진입 방안 연구 -슬랙모델을 이용하여-)

  • Oh, Jin-Seok;Kim, Gil-Soo;Merdas, Reza;Jang, Jae-Hee
    • Journal of Navigation and Port Research
    • /
    • v.38 no.2
    • /
    • pp.163-170
    • /
    • 2014
  • Domestic offshore business is oriented toward building drill-ships, FPSOs(Floating Production Storage and Off loading). But the equipments needed for offshore platforms are not so developed in Korea because the equipments can not be verified in Korean territory where the offshore platforms are not stationed. This study aims at finding some methods on entering into OSI for the maintenance and disassembly of fixed offshore platforms. Slack model is adopted to find out how slack assets could play a role in penetrating foreign markets. Firstly, entry into the South East Asian market is recommended. Secondly, forming a consortium is suggested by which taking part in offshore market can be easier. Finally, strategic plans for obtaining the technology for ship building equipments are needed as well as government support.

Economic Evaluation of Power Grid Interconnection between Offshore Wind Power Plants (해상풍력발전단지 간의 전력계통 연계에 관한 경제성 분석 연구)

  • Moon, Won-Sik;Jo, Ara;Kim, Jae-Chul
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.4
    • /
    • pp.339-344
    • /
    • 2014
  • An offshore wind power plant (WPP) is very expensive and different from an onshore wind power system in many ways. There has been a continuous increase in the capacity of the offshore WPPs. Therefore it is essential to analyze the feasibility and reliability of the offshore wind power to optimize their redundancy. Besides, it is very important to study a planning for grid interconnection of adjacent offshore WPPs. This paper proposes a economic evaluation method to interconnect with adjacent offshore substations in offshore wind power grid. Also, we suggest the probabilistic reliability method to calculate a probabilistic power output of the wind turbine and a cost of the expected energy not supplied that is used as the reliability index of the power system.

A Case Study on the Risk Assessment for Offshore Plant Solid Desiccant Dehydration Package by using HAZOP (HAZOP을 통한 해양플랜트 흡착식 탈수공정 패키지의 위험성평가 및 안전도 향상 방안)

  • Noh, Hyonjeong;Park, SangHyun;Cho, Su-gil;Kang, Kwangu;Kim, Hyungwoo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.4_2
    • /
    • pp.569-581
    • /
    • 2020
  • Since the dehydration packages of offshore plant deal directly with oil & gas, there is a great risk of fire and explosion during operation. Therefore, this study performed risk assessment through HAZard & OPerability (HAZOP) for solid desiccant dehydration package that can remove water component of natural gas in offshore floating liquefied natural gas (LNG) production facilities below 0.1 ppmv. The risk matrix was determined by dividing the likelihood and the severity into five levels separately by asset, life, environment and reputation. The piping & instrumentation diagram (P&ID) of the dehydration package was divided into 9 nodes. Total 22 deviations were assessed in consideration of the adsorption and desorption conversion cycle. A risk assessment based on deviations revealed 14 major hazards. Three representative types of hazards were open/close failure of the control valve, control failure of the heater, and abnormal operation of the regeneration gas cooler. Finally, we proposed the installation of additional safety devices to improve safety against these major hazards, such as safety instrumented functions, alarms, etc.

Study on System Support for Offshore Plant Piping Process Using 3D Simulator

  • Kim, Hyun-Cheol;Lee, Gyu-Hong
    • Journal of Ocean Engineering and Technology
    • /
    • v.34 no.3
    • /
    • pp.217-226
    • /
    • 2020
  • An offshore plant is an offshore platform that can process oil and gas resources in rough seas with a poor working environment. Moreover, it is a complex structure with different types of offshore facilities and a large amount of outfitting that connects different offshore installations. In particular, an enormous amount of various piping materials is installed in a relatively narrow space, and thus, the difficulty of working is relatively high compared to working in ships or ground plants. Generally, when the 3D detailed design is completed, an offshore plant piping process is carried out at the shipyard with ISO 2D fabrication drawings and ISO 2D installation drawings. If a worker wants to understand the three-dimensional piping composition in the working area, he can only use three-dimensional viewers that provide limited functionality. As offshore plant construction progresses, correlating work with predecessors becomes more complicated and rework occurs because of frequent design changes. This viewer function makes it difficult to identify the 3D piping structure of the urgently needed part. This study deals with the process support method based on a system using a 3D simulator to improve the efficiency of the piping process. The 3D simulator is based on the Unity3D engine and can be simulated by considering the classification and priority of 3D models by the piping process in the system. Further, it makes it possible to visualize progress information of the process. In addition, the punch content can be displayed on the 3D model after the pipe inspection. Finally, in supporting the data in relation to the piping process, it is considered that 3D-simulator-supported piping installing could improve the work efficiency by more than 99% compared to the existing method.