• Title/Summary/Keyword: Office building construction

Search Result 308, Processing Time 0.027 seconds

A study on the construction of government office in Dongnaebu at 19c (19세기 동래부(東萊府)의 관사영선(官舍營繕)에 관한 연구(硏究))

  • Kim, Sookyung;Kim, Soon il
    • Journal of architectural history
    • /
    • v.12 no.3
    • /
    • pp.87-100
    • /
    • 2003
  • This study is on the construction of government office of Dongnaebu through researching the construction reports and historical documents in 19century. Especially it focuses on the local construction system and operation for the government office. Main contents of the study are 1) Scope and process of construction, 2) Architectural administration and official notes, 3) Organization of participants and the feature, 4) Felling trees and transport, 5) Monetary of construction The results are summarized as follows. 1) Repair office customary were the courtesy new provincial man. Government building were inspected and repaired periodically. 2) Administrative system of construction have been operated. There are official notes which are about application, permition and order, concerned works such as logging at the bongsan, means of transport, paying wages and progressing works. 3) Organization of construction was made up of an officer and sangnee to supervise and supply. 4) Due to financial difficulty, local government reserved and appropriated funds with moneylending for building office.

  • PDF

A Suggestion on the Fire load and Combustible survey for Prediction of Fire in office Facilities (업무시설의 화재성상예측을 위한 가연물 조사 및 화재하중 제안)

  • Lee, Byeong-Heun;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.98-99
    • /
    • 2019
  • In Korea, buildings are becoming skyscrapers due to restrictions on land. The performance-oriented design was introduced in 2009 for fire safety of such buildings, but the application of the combustible data through engineering design and experiment is a poor reality. Large buildings are used for complex purposes, especially since the density of the office facilities is high, the study conducted a study on the combustible materials of the office facilities and the thermal speed and fire load of the main combustibles of the office facilities were calculated.

  • PDF

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

A Study on Environmentally Friendly Remodeling of Office Building by the Case Study (Case Study를 통한 Office 빌딩의 친환경적 리모델링 연구)

  • Park, Yong-Ho;Jang, Hyun-Suk;Choi, Woo-Young;Lee, Jun-Wook;Lee, Sang-ho;Lee, Kyung-hoi
    • KIEAE Journal
    • /
    • v.4 no.2
    • /
    • pp.19-27
    • /
    • 2004
  • The importance of Building Remodeling as a means to create an architectural environment capable of responding to the social, economic changes has increased more than ever. And it has become necessary to consider Environmental performance in Building remodeling. Consideration of converting buildings into Environment-Friendly Remodeling of Office Buildings makes more and more increased in our construction compatibility. This Study is intended to increase the designer' recognition of Environmental Performance Improvement in the feasibility analysis and schematic design of Office Building Remodeling and to provide Planning Data and Guidance. In this context, this study is focused on the "planning Guidance for Environmental Friendly Remodeling". Through this study, the flow of Environmental Design and Construction is elevated reaching the level in developed country.

Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects - (리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 -)

  • Cho, Kyu-Man;Kim, Tae-Hoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.385-394
    • /
    • 2018
  • There have been frequent reports of schedule delays due to various risks of remodeling projects, which are different from new construction. Therefore, this study was carried out to analyze the risk factors inherent in the remodeling project and the likelihood of schedule delay occurrence in the remodeling construction work. To analyze the relationship between the risk factors and the likelihood of schedule delays of remodeling projects, (1) a prototype of the office building remodeling work was developed through the analysis of existing case and literature, (2) a questionnaire survey was conducted on 29 construction managers who have been or are currently conducting remodeling projects, and (3) after evaluating the reliability of the collected questionnaire results, the relationship between the two elements, which denotes (i) likelihood of schedule delays per each work, (ii) importance of risk factors, and (iii) risk factors affecting schedule delay in remodeling work, was suggested. Using the results of this study, it is expected to develop a plan for preventing the schedule delay of the office building remodeling work through control the risk factors that may cause schedule delays.

Exploring Critical Risk Factors of Office Building Projects

  • NGUYEN, Phong Thanh;PHAM, Cuong Phu;PHAN, Phuong Thanh;VU, Ngoc Bich;DUONG, My Tien Ha;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.2
    • /
    • pp.309-315
    • /
    • 2021
  • Risks and uncertainty are unavoidable problems in management of projects. Therefore, project managers should not only prevent risks, but also have to respond and manage them. Risk management has become a critical interest subject in the construction industry for both practitioners and researchers. This paper presents critical risk factors of office building projects in the construction phase in Ho Chi Minh City, Vietnam. Data was collected through a questionnaire survey based on the likelihood and consequence level of risk factors. These factors fell into five groups: (i) financial risk factors; (ii) management risk factors; (iii) schedule risk factors; (iv) construction risk factors; and (v) environment risk factors. The research results showed that critical factors affecting office building projects are natural (i.e., prolonged rain, storms, climate effects) and human-made issues (i.e., soil instability, safety behaviors, owner's design change) and the schedule-related risk factors contributed to the most significant risks for office buildings projects in the construction phase in Ho Chi Minh City. They give construction management and project management practitioners a new perspective on risks and risk management of office buildings projects in Ho Chi Minh City and are proactive in the awareness, response, and management of risk factors comprehensively.

Analysis and improvement plan for job stress relief activities of technical personnel in architectural design offices -based on staff- (건축 설계사무소 기술인력의 직무스트레스 해소활동 분석 및 개선방안 -사원을 중심으로-)

  • Cho, Sang-Hyeok;Gil, Min-Wook;Ahn, Jong-Hyeok;Shin, Won-Sang;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.125-126
    • /
    • 2022
  • Office workers at the architectural design office are under job stress for various reasons such as excessive working hours, friction with the site, and unpredictability of work. This can increase not only the negative image of office workers in the construction industry, but also the avoidance of young manpower in the future. This study investigated the specific purpose of each activity as a problem of job stress relief activities in the architectural design office, and the specific purpose and goal setting of each activity as a way to improve job stress relief activities.

  • PDF

A Study on the Reference Building based on the Building Design Trends for Non-residential Buildings (건축물 설계현황 분석을 통한 국내 비주거용 표준건물의 설정에 관한 연구)

  • Jeong, Young-Sun;Jung, Hae-Kwon;Jang, Hee-Kyung;Yu, Ki-Hyun
    • Journal of the Korean Solar Energy Society
    • /
    • v.34 no.3
    • /
    • pp.1-11
    • /
    • 2014
  • The Korean government plans to introduce the building energy performance standard which regulates the annual energy consumption of buildings. This paper aimed to set up the reference building from database based on the building design trends for non-residential buildings. We surveyed the design data of 435 non-residential buildings which were granted building permission from 2007 to 2011. And we conducted estimation on the heating & cooling load and the energy consumption of the reference building using ECO2 program. From results, the reference building of non-residential buildings was office building which had a total 7 floors and $20,838m^2$ gross floor area. And it suggests the design reference data of building envelope, HAVC, heat source equipment and lighting system for the reference building. The total annual energy use of the reference building was $151.9kWh/m^2yr$.

Outline of Standard Classifications for International Power Plant Construction (해외 발전소 건설의 효율화를 위한 표준분류체계 상위구조)

  • Kang, Mi-Yeon;Ha, Jiwon;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.184-185
    • /
    • 2014
  • International construction contracts to Korean construction companies have been dramatically increased over the 48 years (Contract received worth 65.2 billion dollars in 2013). Especially, the plant construction sector has achieved about 61% among the 65.2 billion dollars. Under this trend, in order to ensure plant construction's competitiveness, 'standard classification' is an important area for systematic management. However, these standards in the plant construction are not widely utilized yet, in comparison with civil and building sectors. Therefore, in this research, a higher level of standard classifications is proposed for various types of power plants from a PMO's (Project Management Office) perspective. This study also provides a comparative analysis outlining different features and common components based on various types of power plants.

  • PDF

Estimate of Additional Construction Cost as Certifying G-SEED of Office Building in Korea

  • Kim, Jea-Moon;Shin, Sung-Joon;Hur, In
    • KIEAE Journal
    • /
    • v.14 no.5
    • /
    • pp.21-28
    • /
    • 2014
  • To improve environmental problem as globally climate changes, domestic and foreign government have been trying to reduce green gas emitted by all industries. With making the green building certification system that assess the substantiality and energy performance of building, a governments have been using by a way for reducing green gas emitted in building industry. G-SEED(Green Standard for Energy & Environmental Design) developed in Korea have been reinforcing, and a number of projects certifying the G-SEED have been increasing continuously. As a demand of G-SEED certification is rising, a question on the additional cost data as certifying G-SEED is rising. It is because additional cost as getting the certification is important fact for G-SEED level decision and whether getting the certification or not. Therefore, this study analyzed additional construction cost as certifying G-SEED through performance improvement and design change of general office building not to get G-SEED. In conclusion, an additional construction cost ratio of G-SEED projects to the reference building is drawn as certified level; +0.26%, silver level; +2.29%, gold level; +3.89%, and platinum level; +5.48%.