• 제목/요약/키워드: Nuclear decommissioning

검색결과 340건 처리시간 0.025초

UK Civil Nuclear Decommissioning, a Blueprint for Korea's Nuclear Decommissioning Future?: Part I - Nuclear Legacy, Strategies, and the NDA

  • Foster, Richard I.;Park, June Kyung;Lee, Keunyoung;Seo, Bum-Kyoung
    • 방사성폐기물학회지
    • /
    • 제19권3호
    • /
    • pp.387-419
    • /
    • 2021
  • The challenges facing companies and institutions surrounding civil nuclear decommissioning are diverse and many, none more so than those faced in the United Kingdom. The UK's Generation I nuclear power plants and early research facilities have left a 'Nuclear Legacy' which is in urgent need of management and clean-up. Sellafield is quite possibly the most ill-famed nuclear site in the UK. This complex and challenging site houses much of what is left from the early days of nuclear research in the UK, including early nuclear reactors (Windscale Piles, Calder Hall, and the Windscale Advanced Gas Cooled Reactor) and the UK's early nuclear weapons programme. Such a legacy now requires careful management and planning to safely deal with it. This task falls on the shoulders of the Nuclear Decommissioning Authority (NDA). Through a mix of prompt and delayed decommissioning strategies, key developments in R&D, and the implementation of site licenced companies to enact decommissioning activities, the NDA aims to safety, and in a timely manner, deal with the UK's nuclear legacy. Such approaches have the potential to influence and shape other such approaches to nuclear decommissioning activities globally, including in Korea.

UK Civil Nuclear Decommissioning, a Blueprint for Korea's Nuclear Decommissioning Future?: Part II - UK's Progress and Implications for Korea

  • Foster, Richard I.;Park, June Kyung;Lee, Keunyoung;Seo, Bum-Kyoung
    • 방사성폐기물학회지
    • /
    • 제20권1호
    • /
    • pp.65-98
    • /
    • 2022
  • The nuclear legacy that remains in the United Kingdom (UK) is complex and diverse. Consisting of legacy ponds and silos, redundant reprocessing plants, research facilities, and non-standard or one-off reactor designs, the clean-up of this legacy is under the stewardship of the Nuclear Decommissioning Authority (NDA). Through a mix of prompt and delayed decommissioning strategies, the NDA has made great strides in dealing with the UK's nuclear legacy. Fuel debris and sludge removal from the legacy ponds and silos situated at Sellafield, as part of a prompt decommissioning strategy for the site, has enabled intolerable risks to be brought under control. Reactor defueling and waste retrievals across the Magnox fleet is enabling their transition to a period of care and maintenance; accelerated through the adopted 'Lead and Learn' approach. Bespoke decommissioning methods implemented by the NDA have also enabled the relevant site licence companies to tackle non-standard reactor designs and one-off wastes. Such approaches have potential to influence and shape nuclear decommissioning decision making activities globally, including in Korea.

An Approach to Framework of Dealing with Improving the Complexity and Uncertainty for Decommissioning Safety Assessment of a Nuclear Facility

  • Jeong, Kwan-Seong;Lee, Kune-Woo;Lim, Hyeon-Kyo
    • International Journal of Safety
    • /
    • 제8권1호
    • /
    • pp.24-31
    • /
    • 2009
  • An effective assessment for decommissioning safety of nuclear facilities requires basic knowledge about possible risks, characteristics of potential hazards, and comprehensive understanding of the associated cause-effect relationships within a decommissioning for nuclear facility. This paper proposes an approach to develop the hierarchical structure and hazards of dealing with improving the complexity and uncertainty for decommissioning safety assessment of nuclear facilities and the resolutions are proposed to improve the complexity and uncertainty for decommissioning safety assessment of nuclear facilities. These resolutions can provide a comprehensive view of the risks in the decommissioning activities of a nuclear facility.

A Suggestion of Contingency Guidelines According to ISDC Based on Overseas Contingency Data

  • Minhee Kim;Chang-Lak Kim;Sanghwa Shin
    • 방사성폐기물학회지
    • /
    • 제20권4호
    • /
    • pp.541-550
    • /
    • 2022
  • When decommissioning nuclear power plant (NPP), the first task performed is cost estimation. This is an important task in terms of securing adequate decommissioning funds and managing the schedule. Therefore, many countries and institutions are conducting continuous research and also developing and using many programs for cost estimation. However, the cost estimated for decommissioning an NPP typically differs from the actual cost incurred in its decommissioning. This is caused by insufficient experience in decommissioning NPPs or lack of decommissioning cost data. This uncertainty in cost estimation can be in general compensated for by applying a contingency. However, reflecting an appropriate standard for the contingency is also difficult. Therefore, in this study, data analysis was conducted based on the contingency guideline suggested by each institution and the actual cost of decommissioning the NPP. Subsequently, TLG Service, Inc.'s process, which recently suggested specific decommissioning costs, was matched with ISDC (International Structure for Decommissioning Costing)'s work breakdown structure (WBS). Based on the matching result, the guideline for applying the contingency for ISDC's WBS Level 1 were presented. This study will be helpful in cost estimation by applying appropriate contingency guidelines in countries or institutions that have no experience in decommissioning NPPs.

Path planning in nuclear facility decommissioning: Research status, challenges, and opportunities

  • Adibeli, Justina Onyinyechukwu;Liu, Yong-kuo;Ayodeji, Abiodun;Awodi, Ngbede Junior
    • Nuclear Engineering and Technology
    • /
    • 제53권11호
    • /
    • pp.3505-3516
    • /
    • 2021
  • During nuclear facility decommissioning, workers are continuously exposed to high-level radiation. Hence, adequate path planning is critical to protect workers from unnecessary radiation exposure. This work discusses recent development in radioactive path planning and the algorithms recommended for the task. Specifically, we review the conventional methods for nuclear decommissioning path planning, analyze the techniques utilized in developing algorithms, and enumerate the decision factors that should be considered to optimize path planning algorithms. As a major contribution, we present the quantitative performance comparison of different algorithms utilized in solving path planning problems in nuclear decommissioning and highlight their merits and drawbacks. Also, we discuss techniques and critical consideration necessary for efficient application of robots and robotic path planning algorithms in nuclear facility decommissioning. Moreover, we analyze the influence of obstacles and the environmental/radioactive source dynamics on algorithms' efficiency. Finally, we recommend future research focus and highlight critical improvements required for the existing approaches towards a safer and cost-effective nuclear-decommissioning project.

Preliminary Analysis on Decommissioning Strategies for Fukushima Daiichi Nuclear Power Station From Waste Management Perspective

  • Watanabe, Naoko;Yanagihara, Satoshi
    • 방사성폐기물학회지
    • /
    • 제19권3호
    • /
    • pp.297-306
    • /
    • 2021
  • In this study, basic strategies for the decommissioning and site remediation of the Fukushima Daiichi Nuclear Power Station (FDNPS) were investigated. Six scenarios were formulated based on two of the three decommissioning strategies of nuclear power plants defined by the International Atomic Energy Agency (IAEA): immediate dismantling and deferred dismantling. A multicriteria decision analysis was performed to analyze the preferences of the options from the viewpoints of the timeframe to complete decommissioning, the resulting waste, the site usability, and the availability of the radioactive waste disposal route. The same six scenarios were applied to both the FDNPS and the nuclear power plants that ceased operation after a normal plant life cycle for comparison. For the FDNPS, the decommissioning project involved fuel debris retrieval, dismantling, and site remediation. The analysis results suggest that the balance between the amount of waste and the time to achieve the end state may be one of the most critical factors to consider when planning the decommissioning and site remediation of the FDNPS.

The planning strategy of robotics technology for nuclear decommissioning in Taiwan

  • Chung Yi Tu;Kuen Tsann Chen;Kuen Ting;Chin Yang Sheng
    • Nuclear Engineering and Technology
    • /
    • 제56권1호
    • /
    • pp.64-69
    • /
    • 2024
  • According to the market research report, the nuclear decommissioning services market is currently experiencing considerable growth, with a projected Compound Annual Growth Rate (CAGR) of nearly 13% during the 2020-2024 forecast period. This expansion is primarily fueled by the advancement of Industry 4.0, in conjunction with the emergence of cutting-edge technologies such as the Internet of Things, big data, artificial intelligence, and 5G. Even though the fact that robots have already been utilized in the nuclear industry, their adoption has been hindered by conservative regulations. However, the nuclear decommissioning market presents an opportunity for the advancement of robotics technology. The British have already invested heavily in encouraging the use of intelligent robots for nuclear decommissioning, and other countries, such as Taiwan, should follow suit. Taiwan's flourishing robotics development industry in manufacturing, logistics, and other domains can be leveraged to introduce advanced robotics in the decommissioning of its nuclear power plants. By doing so, Taiwan can establish itself as a competitive player in the nuclear decommissioning services market for the next two decades.

Innovative Nuclear Power Plant Building Arrangement in Consideration of Decommissioning

  • Choi, Won-Jun;Roh, Myung-Sub;Kim, Chang-Lak
    • Nuclear Engineering and Technology
    • /
    • 제49권3호
    • /
    • pp.525-533
    • /
    • 2017
  • A new concept termed the Innovative Nuclear Power Plant Building Arrangement (INBA) strategy is a new nuclear power plant building arrangement method which encompasses upfront consideration of more efficient decommissioning. Although existing decommissioning strategies such as immediate dismantling and differed dismantling has the advantage of either early site restoration or radioactive decommissioning waste reduction, the INBA strategy has the advantages of both strategies. In this research paper, the concept and the implementation method of the INBA strategy will be described. Two primary benefits will be further described: (1) early site restoration; and (2) radioactive waste reduction. Several other potential benefits will also be identified. For the estimation of economic benefit, the INBA strategy, with two primary benefits, will be compared with the immediate dismantling strategy. The effect of a short life cycle nuclear power plant in combination with the INBA strategy will be reviewed. Finally, some of the major impediments to the realization of this strategy will be discussed.

연구용원자로 해체비용 산정을 위한 단위비용인자 산출 (Calculating the Unit Cost Factors for Decommissioning Cost Estimation of the Nuclear Research Reactor)

  • 정관성;이동규;정종헌;이근우
    • 방사성폐기물학회지
    • /
    • 제4권4호
    • /
    • pp.385-391
    • /
    • 2006
  • 연구용원자로 해체비용은 해체대상물에 대한 특성 및 제원에 맞게 해체작업을 분류하고 구성요소를 설정하여 단위비용인자를 바탕으로 한 공학적 비용 산정 방법으로 해체비용을 산정한다. 연구용원자로에 대한 해체비용은 크게 인건비, 장비 및 재료비로 구성이 되는데 해체작업에 소요되는 인건비는 해체대상물에 소요되는 작업시간을 바탕으로 계산을 한다. 본 논문에서는 연구용원자로 해체비용 산정 시 인건비 계산에 필요한 단위비용인자 및 작업 난이도 인자를 산출하였다.

  • PDF