• Title/Summary/Keyword: Nuclear Project

Search Result 450, Processing Time 0.029 seconds

Study on the Tuning of PEFP DTL

  • Kim, Han-Sung;Kwon, Hyeok-Jung;Seol, Kyung-Tae;Cho, Yong-Sub;Hwang, Yong-Suk
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 2005.05a
    • /
    • pp.1060-1061
    • /
    • 2005
  • PDF

Study on Prioritizing the countries for BOT nuclear power project using Analytic Hierarchy Process (시스템엔지니어링에 기반한 원자력 사업대상국가 평가방법 연구)

  • Choi, Sun Woo;Bui, Hoang Ha;Roh, Myung Sub
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.9 no.2
    • /
    • pp.1-6
    • /
    • 2013
  • Developing Build-Own (or Operate)-Transfer (BOT) nuclear power project carrying large capital in the long term requires initially well-made multi-decision which it prevents sorts of risks from unexpected situation of target countries. In order to analyze the feasibility of project country, the Analytic Hierarchy Process is adopted. Firstly, the factors influencing the success of BOT nuclear power project in overseas countries were investigated through the literature survey for the country risk and were evaluated by expert interview for estimating comparative weight through pairwise comparison between such factors. Finally, it is developed comparative database of alternate countries with respect to each factor. This analytic method enables the developer to select and focus on the country which has preferable circumstance so that it enhances the efficiency of the project promotion. Also, it enables the developer to quantify the qualitative factors so that it diversifies the project success strategy and policy for the target country.

A Study on the Cost Estimate System Development Method for Nuclear Power Plant Construction Projects

  • Lee, Sang Hyun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.133-137
    • /
    • 2017
  • Nuclear power plants in Korea are usually built based on a duplicated model; so the project cost data of the preceding unit can be used as reference when estimating the project cost for the succeeding unit. However, since the contracting method is oriented towards the price, empirical factors such as making top-down estimations using the reverse calculation method based on the completion cost of the preceding unit is dominant. In order to develop a project cost database to resolve such problems, the detailed cost boundary of the project cost data must be categorized by project and by system. This study proposes a method to connect the code of account with the base quantities and the IAEA account, and proposes a database structure for the development of a project cost estimation system. The estimation system developed in the future is expected to utilize the proposed project cost data structure.

  • PDF

Effor Analysis of a 20MeV DTL for PEFP

  • Jang Ji-ho;Cho Yong-sub;Han Jang-min;Kwon Hyeok-Jung;Jeong Kyoung-keun;Choi Byung-ho
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 2003.05a
    • /
    • pp.430.1-430.1
    • /
    • 2003
  • PDF

PEFP VACUUM CONTROL SYSTEM

  • Song, Y.G.;Hong, I.S.;Choi, H.M.;Cho, Y.S.
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 2005.10a
    • /
    • pp.921-922
    • /
    • 2005
  • PDF

Requirement Analysis for Development of EVMS in Nuclear Power Plant (원전건설 성과관리시스템(EVMS) 개발을 위한 요건 분석)

  • Won, Seo-Kyung;Park, Weon-Seob;Chong, Young-Whan;Kim, Jae-Yong;Kim, Yun-Myung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.271-272
    • /
    • 2013
  • The Korean nuclear industry acquired technology for each construction stage including engineering, procurement, construction and commissioning from advanced nuclear countries. While the levels of technology and quality have greatly improved, the same cannot be said for the level of project management. In particular, the level of project performance measurement and forecasting project risk still remain at the single project management level. Thus, this paper reviewed the concept of the EVMS method and requirement for the system. The adoption of the EVMS, an advanced project management method, can enable efficient management of project risks and promote an adequate environment for project implementation.

  • PDF

A Study on the Effects of Risk Perception and Opportunism on the Project Performance (위험인식과 기회주의 행동이 프로젝트 성과에 미치는 영향에 관한 연구)

  • Yoon, Chang Soo;Jo, Dong Hyuk
    • Journal of Korean Society for Quality Management
    • /
    • v.50 no.1
    • /
    • pp.63-76
    • /
    • 2022
  • Purpose: The purpose of this study is to analyze the effects of risk perception and opportunistic behavior on project performance and the moderating effect of cooperation in this relationship through literature review to identify factors affecting the performance of large-scale nuclear power plant construction projects. Methods: This study conducted a survey on nuclear power plant construction project participants and verified the hypothesis using statistical methods. Results: The results of this study are as follows; First, risk perception appeared to have a positive effect on opportunistic behavior, and it was confirmed that opportunistic behavior among participating companies could occur even in nuclear power plant construction projects. Second, it has been proven that risk perception has a negative effect on project performance as suggested in previous studies. Third, in the relationship between opportunistic behavior and project performance, it was found that opportunistic behavior had a negative effect on project performance. Finally, cooperation was found to have a moderating effect on the relationship between performance risk and project performance. Conclusion: This study is a case of empirical analysis targeting nuclear power plant construction project workers, and provided a basis for reference in future related academic research and project implementation.