Performance Evaluation of Welding Method for Modular of High-Strength Reinforcing Bars to the Nuclear Power Plant Structures (원전구조물 고강도철근 모듈화를 위한 용접방법 성능평가)

  • Lim, Sang-Joon;Lee, Han-Woo;Kim, Hyeong-Seob;Bang, Chang-Joon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.278-280
    • /
    • 2013
  • To minimize construction quantity of nuclear facility, it is required to reduce reinforcing bar amount and solve reinforcing bar concentration and for this, it is necessary to develop application design technology and modular of high strength reinforcing bar. Hence, KHNP reduces excessive reinforcing bar amount which can cause possibility of poor construction of concrete through design standard development and modular of nuclear facility structure using high strength reinforcing bar to raise economics and has its purpose to maintain high-level safety and durability as they are.

  • PDF

Analysis on the Changes of Teachers' Consciousness and Ambivalent Attitude through the Environmental Education Training (환경교육 직무연수를 통한 교사들의 의식변화와 양면가치태도 변화 분석)

  • Lee, Jin-Heon;Sung, Jung-Jin;Choi, Jin-Ha
    • Hwankyungkyoyuk
    • /
    • v.18 no.1 s.26
    • /
    • pp.120-133
    • /
    • 2005
  • This study investigated the changes of consciousness and ambivalent attitudes about the important environmental issues among the teachers who enrolled the environmental education training. Experimental and control groups were composed with 47 and 30 person, respectively. Environmental issues were constructions of sea-wall, nuclear power plant and dam. Cronbach alpha of the self-developed questionnaire was $0.6909{\sim}0.8992$. Score were made with 5 Likert scales for consciousness, and with semantic differential half scale for ambivalent attitudes. Almost teachers(94.0% and 97.1%) have above 10 years teaching career. Strangers in environmental program were 53.2%. After environmental training, teachers' consciousness was significantly changed to negative about the construction of sea-wall for the farm field and industry complex area(p=0.019), and about the construction of dam for disaster like flood(p=0.026), and for adverse effects of citizen by fog(p=0.042). They were also significantly changed to negative about the construction of nuclear power plant for economical energy(p=0.004)', no-emission of greenhouse gases(p=0.033)', 'alternative energy(p=0.000)', 'destruction of ecology(p=0.052)' and 'social fear(p=0.009)'. The consciousness of teachers who have the experience of environmental training, were significantly changed to negative about the construction of nuclear power plant. Scores of teachers' ambivalent attitudes were made lower in experimental than control group about the construction of sea-wall and nuclear power plant. After education training, they were made lower so much as -10.0% in control, but higher much as +4.4% in experimental, and severely higher much as 86.5% in teachers who had experienced the environmental training about construction of sea-wall. Their scores were made lower so much as -3.3% in control, but much as -6.4% in control.

  • PDF

Program Development for the Prediction of Cooling Tower Performance (냉각탑 성능 예측을 위한 프로그램 개발)

  • Jung, Jaehyung;Jung, Jaihyun;Choi, Young Ki
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.26 no.3
    • /
    • pp.130-136
    • /
    • 2014
  • The present study is performed to set up the framework of cooling tower performance predictions. The performance of mechanical forced draft cooling tower is directly related to the state of a nuclear power plant system, such as the condenser and evaporator. The main parameters related to the state of systems are as follows : wet bulb temperature, dry bulb temperature and absolute humidity. The performance evaluation of cooling tower must be considered at the power plant design. In this study, the toolkit developed by the American Cooling Tower Industry association (CTI) has been used for the framework construction. In order to validate the framework, it is being applied to the cooling tower constructed for the U.S. Nuclear Power Plant. The test results have shown good agreements with the cold water temperature on the cooling tower performance curves provided by manufacturers.

Understanding and Attitude to Sustainable Development of College Students for a Nuclear Power Plant Construction in Education for Sustainable Development through Panel Discussion (패널토론을 적용한 지속가능발전교육에서 대학생의 원자력발전소 건립에 대한 지속가능발전 인식과 태도)

  • MOON, Sungchae
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.27 no.5
    • /
    • pp.1236-1251
    • /
    • 2015
  • This study examined understanding and attitude of sustainable development(SD) of 38 college students in a nuclear power plant construction after education for sustainable development(ESD) through panel discussion. The results were as follows: First, after lesson 66% of students were expected that SD is possible if scientific technology is developed and a frugal life for the protection of environment is carried out. However, the remaining students regarded SD as an ideal concept, because they thought it is not possible to pursue environmental sustainability and socio-economic development simultaneously. Second, students' opinions in the evaluation of constructing a nuclear power plant in three aspects(environment, society and economy) before and after panel discussion were changed as follows; 1) After panel discussion, the objectors increased to 21% in economic evaluation, while the supporters increased to 11% in environmental evaluation. 2) Students majoring in engineering or natural sciences changed their opinions to agree in environmental evaluation because they considered a nuclear power plant safe and eco-energy. However students majoring in social science/business or liberal arts/arts changed their opinions to disagree in economic evaluation because they considered a nuclear power plant as high-cost energy when assessing danger-accidents cost, public consensus cost, operation and maintenance cost, and waste disposal cost. 3) This change of decision-making in students majoring in social science/business or liberal arts/arts after panel discussion was statistically significant(p<0.05). Implications of panel discussion as a teaching and learning method in ESD are also discussed.

A study on application method of "Result unit cost" to Nuclear Power Plant (NPP) construction cost estimating (원전 건설공사 실적공사비 단가 제도 도입을 위한 연구)

  • Park, Weon-Seob;Jang, Kyoung-su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.46-47
    • /
    • 2014
  • Recently, BAI(Board of Audit and Inspection of Korea) has recommended that "Result unit cost" of Korean government apply to national power plant construction project when plant owner corporations estimate budget price for tender. but nuclear industry have difficulties with this suggestion. the purpose of this study is to review the "Result unit cost" and problem with application of NPP construction cost estimating. And proposed the direction of application of "Result unit cost" to NPP construction cost estimating.

  • PDF

A Study of the Construction Contracts and Delivery System for Nuclear Power Plant (원전건설 발주 및 계약체계에 대한 고찰)

  • Seo, Yong-Tok;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.233-235
    • /
    • 2012
  • Continually having growed up overseas construction market for new Nuclear Power Plant(NPP), the exports of Korean Reactor emerges as the key task of National Nuclear Business. The objective of this study is to strengthen the competitiveness of Korean Reactor through the improvement of Construction Project Contract & Delivery System for NPP. This study suggests the method for increasing Korean Reactor's competitiveness of exports by analyzing the business environment of foreign market and comparing Contract & Delivery System between domestic and foreign.

  • PDF

A Study of Automation for Examination Analysis of Inservice Inspection for Nuclear Power Plant (I) (원자력발전소(原子力發電所) 가동중(稼動中) 검사(檢査)의 시험분석(試驗分析)을 위한 자동화연구(自動化硏究) (I))

  • Kim, W.
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.5 no.1
    • /
    • pp.34-47
    • /
    • 1985
  • The developing country, KOREA where does not possess the natural resources for traditional energy such as oil and gas, so. The nuclear energy is the most single reliable source available for closing the energy gap. For these reason, It is inavoidable to construct the nuclear power plant and to develop technology related nuclear energy. The rate of operation in large nuclear power facilities depends upon the performance of work system through design and construction, and also the applied technology. Especially, it is the most important element that safety and reliability in operation of nuclear power plant. In view of this aspects, Nuclear power plant is performed severe examinations during preservice and inservice inspection. This study provide an automation of analysis for volumetric examination which is required to nuclear power plant components. It is composed as follows: I. Introduction II. Inservice Inspection of Nuclear Power Plant ${\ast}$ General Requirement. ${\ast}$ Principle and Methods of Ultrasonic Test. ${\ast}$ Study of Flaw Evaluation and Design of Classifying Formula for Flaws. III. Design of Automation for Flaw Evaluation. IV. An Example V. Conclusion In this theory, It is classifying the flaws, the formula of classifying flaws and the design of automation that is the main important point. As motioned the above, Owing to such as automatic design, more time could be allocated to practical test than that of evaluation of defects, Protecting against subjective bias tester by himself and miscalculation by dint of various process of computation. For the more, adopting this method would be used to more retaining for many test data and comparative evaluating during successive inspection intervals. Inspite of limitation for testing method and required application to test components, it provide useful application to flow evaluation for volumetric examination. Owing to the characteristics of nuclear power plant that is highly skill intensive industry and has huze system, the more notice should be concentrated as follows. Establishing rational operation plan, developing various technology, and making the newly designed system for undeveloped sector.

  • PDF

A Standard Way of Constructing a Data Warehouse based on a Neutral Model for Sharing Product Dat of Nuclear Power Plants (원자력 발전소 제품 데이터의 공유를 위한 중립 모델 기반의 데이터 웨어하우스의 구축)

  • Mun, D.H.;Cheon, S.U.;Choi, Y.J.;Han, S.H.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.12 no.1
    • /
    • pp.74-85
    • /
    • 2007
  • During the lifecycle of a nuclear power plant many organizations are involved in KOREA. Korea Plant Engineering Co. (KOPEC) participates in the design stage, Korea Hydraulic and Nuclear Power (KHNP) operates and manages all nuclear power plants in KOREA, Dusan Heavy Industries manufactures the main equipment, and a construction company constructs the plant. Even though each organization has a digital data management system inside and obtains a certain level of automation, data sharing among organizations is poor. KHNP gets drawing and technical specifications from KOPEC in the form of paper. It results in manual re-work of definition and there are potential errors in the process. A data warehouse based on a neutral model has been constructed in order to make an information bridge between design and O&M phases. GPM(generic product model), a data model from Hitachi, Japan is addressed and extended in this study. GPM has a similar architecture with ISO 15926 "life cycle data for process plant". The extension is oriented to nuclear power plants. This paper introduces some of implementation results: 1) 2D piping and instrument diagram (P&ID) and 3D CAD model exchanges and their visualization; 2) Interface between GPM-based data warehouse and KHNP ERP system.

Development of System Dynamics model for Electric Power Plant Construction in a Competitive Market (경쟁체제 하에서의 발전소 건설 시스템 다이내믹스 모델 개발)

  • 안남성
    • Korean System Dynamics Review
    • /
    • v.2 no.2
    • /
    • pp.25-40
    • /
    • 2001
  • This paper describes the forecast of power plant construction in a competitive korean electricity market. In Korea, KEPCO (Korea Electric Power Corporation, fully controlled by government) was responsible for from the production of the electricity to the sale of electricity to customer. However, the generation part is separated from KEPCO and six generation companies were established for whole sale competition from April 1st, 2001. The generation companies consist of five fossil power companies and one nuclear power company in Korea at present time. Fossil power companies are scheduled to be sold to private companies including foreign investors. Nuclear power company is owned and controlled by government. The competition in generation market will start from 2003. ISO (Independence System Operator will purchase the electricity from the power exchange market. The market price is determined by the SMP(System Marginal Price) which is decided by the balance between demand and supply of electricity in power exchange market. Under this uncertain circumstance, the energy policy planners such as government are interested to the construction of the power plant in the future. These interests are accelerated due to the recent shortage of electricity supply in California. In the competitive market, investors are no longer interested in the investment for the capital intensive, long lead time generating technologies such as nuclear and coal plants. Large unclear and coal plants were no longer the top choices. Instead, investors in the competitive market are interested in smaller, more efficient, cheaper, cleaner technologies such as CCGT(Combined Cycle Gas Turbine). Electricity is treated as commodity in the competitive market. The investors behavior in the commodity market shows that the new investment decision is made when the market price exceeds the sum of capital cost and variable cost of the new facility and the existing facility utilization depends on the marginal cost of the facility. This investors behavior can be applied to the new investments for the power plant. Under these postulations, there is the potential for power plant construction to appear in waves causing alternating periods of over and under supply of electricity like commodity production or real estate production. A computer model was developed to sturdy the possibility that construction will appear in waves of boom and bust in Korean electricity market. This model was constructed using System Dynamics method pioneered by Forrester(MIT, 1961) and explained in recent text by Sternman (Business Dynamics, MIT, 2000) and the recent work by Andrew Ford(Energy Policy, 1999). This model was designed based on the Energy Policy results(Ford, 1999) with parameters for loads and resources in Korea. This Korea Market Model was developed and tested in a small scale project to demonstrate the usefulness of the System Dynamics approach. Korea electricity market is isolated and not allowed to import electricity from outsides. In this model, the base load such as unclear and large coal power plant are assumed to be user specified investment and only CCGT is selected for new investment by investors in the market. This model may be used to learn if government investment in new unclear plants could compensate for the unstable actions of private developers. This model can be used to test the policy focused on the role of unclear investments over time. This model also can be used to test whether the future power plant construction can meet the government targets for the mix of generating resources and to test whether to maintain stable price in the spot market.

  • PDF

CONSTRUCTION SCHEDULE DELAY RISK ASSESSMENT BY USING COMBINED AHP-RII METHODOLOGY FOR AN INTERNATIONAL NPP PROJECT

  • HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
    • Nuclear Engineering and Technology
    • /
    • v.47 no.3
    • /
    • pp.362-379
    • /
    • 2015
  • In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.