Recently, because people are taking a great interest in the water supply system and the related facilities are getting larger, the surge suppression is very important problem. The waterhammer occurs when the pumps are started or stoped for operation or tripped due to the power failure. As the waterhammer problems as a result of the pump power failure were very serious, these situations were carefully investigated. Accordingly, we carried out both numerical simulations and field tests to confirm the safety of Juam intake pumping station in which had the in-line pumps. In this paper, it was reviewed that the water supply system has the reliability on the pressure surge, in case the air chambers were installed at both the inlet and the oulet of the in-line pumping station. From the numerical simulations, we found that negative pressure occurred at the inlet disappeared and high pressure occurred at the outlet reduced due to the air chambers. And these results of numerical simulations verified by the field tests. The field tests carried out in case of normal start, normal stop, one and two of pumps emergency stop. By results of simulations and field tests, we are sure that Juam intake pumping station in which have the air chambers is safe for the waterhammer. In addition, we suggested the operation methods of facilities for safe maintenance of the pumping station.
This is a report of successful conversion arterial switch operation for failed Sunning procedure in transposition of the great arteries(TGA) with ventricular septal defect(VSD). A 15 month-male patient was admitted due to intractable congestive heart failure after Sunning operation was done at the age of 8 months. Angiography revealed marked dysfunction of the morphologic right ventricle with tricuspid regurgitation and residual VSD. The pulmonary ventricle 1 systemic ventricle pressure ratio' of 75/85 at catheter study enabled us to do the take down of denning repair, patch closure of VSD and arterial switch without pulmonary artery banding. After the operation, the baby showed good growth with normal ventricular function.
Multi-Spectral Camera(MSC) is a payload on the KOMPSAT -2 satellite to perform the earth remote sensing. The instrument images the earth using a push-broom motion with a swath width of 15 km and a ground sample distance (GSD) of 1 m over the entire field of view (FOV) at altitude 685 Km. The instrument is designed to have an on-orbit operation duty cycle of $20\%$ over the mission lifetime of 3 years with the functions of programmable gain! offset and onboard image data compression/storage. MSC instrument has one(1) channel for panchromatic Imaging and four(4) channel for multi-spectral Imaging covering the spectral range from 450nm to 900nm using TDI CCD Focal Plane Array (FPA). In this paper, the configuration, the interface of MSC hardware and the MSC operation concept are described. And the method of the MSC calibration are described and the design of MSC calibration operation to measure the change of MSC after Launch & Early Operation(LEOP) and normal mission operations are discussed and analyzed.
Proceedings of the Korean Institute of Building Construction Conference
/
2020.11a
/
pp.119-120
/
2020
In order to establish an evaluation method that can quantitatively evaluate the fire safety of existing buildings in Korea, a stochastic approach is needed to consider the extent of damage in the event of actual fire, along with the operation and installation of facilities. Accordingly, as a basic study for the establishment of fire safety assessment methods for buildings, this study aims to analyze the results of safety inspection and the degree of damage caused by the operation of fire doors and fire shutters in order to derive the reliability of fire doors and fire shutters. As a result, the results of inspection of fire shutters and fire doors and the results of operation using fire statisticians are as follows. As a result of the inspection, the positive rate of fire doors was about 82% and 98% of normal operation was derived from the fire investigation.
Purpose: In order to determine the differences in speech outcome based on timing of operation in submucous cleft palate, we have reviewed our experiences in the Furlow palatoplasty over the last 11 years. Methods: From March 1996 to March 2006, 38 submucous cleft palate patients received Furlow palatoplasty. 10 developmentally delayed patients were excluded and 5 patients were lost to follow up. The rest 23 patients were reviewed. Speech was evaluated preoperatively and postoperatively, and speech therapy was performed accordingly. Perceptual speech assessment included hypernasality, nasal emission and articulation disorder. Cinefluorography was performed to aid perceptual assessment. Based on timing of operation, the patients were divided into 3 groups as following: Group A under 24 months(8 patients), Group B from 25 to 48 months(6 patients), and Group C over 49 months (9 patients). Except 1 patient under speech therapy yet, resultant speech was compared. 200707Results: The rate of abnormal speech was higher in Group C(3/9, 33.3%) than in Group A(0%) or B(0%). All 3 patients who had been discontinued of speech therapy from the parent's judgment had abnormal speech. The reason for the discontinuation was that the regular speech therapy was a burden at school age. Any patients who had continued speech therapy had normal speech. Conclusion: The results of our study shows that operative timing is associated with speech development. Maintenance of speech therapy was an important factor for normal speech development. It will be helpful to perform a palatoplasty before 48 months of age to complete speech therapy before the school age.
The Journal of the Korea institute of electronic communication sciences
/
v.15
no.5
/
pp.923-930
/
2020
In modern society, various DC power supplies are required to operate the system circuits of various electric devices. A stable DC supply is essential for the normal operation of the circuit and the importance of the converter for this is very high. This study proposed a PWM DC-DC converter circuit that applied a 3-pole 2-zero voltage controller to a KY converter, a step-up DC-DC converter, to maintain a stable supply of output voltage regardless of load fluctuations. In order to prove the normal operation characteristics of the proposed converter circuit, a PSIM simulation and a circuit operation experiment on the PCB board were performed in comparison with the conventional converter circuit.
The electrical power system (EPS) of Korean satellites in low-earth-orbit is designed to achieve energy balance based on a one-orbit mission scenario. This means that the battery has to be fully charged at the end of a one-orbit mission. To provide the maximum solar array (SA) power generation, the peak power tracking (PPT) method has been developed for a spacecraft power system. The PPT is operated by a software algorithm, which tracks the peak power of the SA and ensures the battery is fully charged in one orbit. The EPS should be designed to avoid the stress of electronics in order to handle the main bus power from the SA power. This paper summarizes the results of energy balance to achieve optimal power sizing and the actual trend analysis of EPS performance in orbit. It describes the results of required power for the satellite operation in the worst power conditions at the end-of-life, the methods and input data used in the energy balance, and the case study of energy balance analyses for the normal operation in orbit. Both 10:35 AM and 10:50 AM crossing times are considered, so the power performance in each case is analyzed with the satellite roll maneuver according to the payload operation concept. In addition, the data transmission to the Korea Ground Station during eclipse is investigated at the local-time-ascending-node of 11:00 AM to assess the greatest battery depth-of-discharge in normal operation.
Journal of the Korea Society of Computer and Information
/
v.13
no.4
/
pp.87-95
/
2008
In this paper, we developed a selectable observation Point test architecture and test procedure for clocked 4-bit synchronous counter circuit based on boundary scan architecture. To develope, we analyze the operation of Sample/Preload instruction on boundary scan architecture. The Sample/Preload instruction make Possible to snapshot of outputs of CUT(circuit under test) at the specific time. But the changes of output of CUT during normal operation are not possible to observe using Sample/Preload in typical scan architecture. We suggested a selectable observation point test architecture that allows to select output of CUT and to observe of the changes of selected output of CUT during normal operation. The suggested a selectable observation point test architecture and test procedure is simulated by Altera Max 10.0. The simulation results of 4-bit counter shows the accurate operation and effectiveness of the proposed test architecture and procedure.
The anomalous systemic arterial supply to the lung without sequestration is an uncommon congenital anomaly characterized by the presence of a part of lung tissue which supplied by an aberrant artery from the aorta or its branch and normal communication with the normal bronchial tree, and it was reported by Huber in 1777 first. It differs from bronchopulmonary sequestration in having normal bronchial communication from the remainder lung and normal lung histology. We experienced a case of anomalous systemic arterial supply to the lung without sequestration, which was confirmed preoperatively. The patient was 16 year old male and came to us with complaints of mild fever and profuse sputum with coughing. Chest film showed a ring-like soft tissue shadow in Rt. middle lung field. Aortogram revealed an aberrant artery originated from abdominal aorta at 12th thoracic vertebral level and supplying a part of Rt. lower lobe of lung. At. the time of operation, an aberrant systemic artery which originated from the abdominal aorta supplying the Rt. lower lobe was noted, and the bronchial communications were normal. After division and ligation of the aberrant artery, Rt. lower lobectomy was performed The postoperative courses were uneventful and the patient was discharged with good condition.
The Journal of Economics, Marketing and Management
/
v.7
no.1
/
pp.1-14
/
2019
Purpose - Currently, the economic globalization has become a common channel for China's enterprise to perform the international economic activities. Due to this background, this paper tries to analyze the influence of internationalization level on operation performance of enterprises. Research design, data, and Methodology - This paper aims at 296 companies going listed in Shanghai Stock Exchange and Shenzhen Stock Exchange. The data about the listed companies during the 12 years from 2005 to 2016 have been collected. Relevant theories, including the theory of comparative advantage, monopolistic advantage and product life cycle in developed countries as well as the small scale technology and state on localized technological capacities in developing countries, have been summarized to provide theoretical basis for the influence of international operation on operation performance of the enterprises. Moreover, the current status of international operation of China's enterprises, including the dynamic cause of the internationalization of China's enterprises, its competitive advantage and disadvantage as well as the interest and potential risk of the internationalization, have been also analyzed. Results - Via adopting the panel data to conduct an empirical analysis, It can be found that the relationship between international operation level and operation performance of China's enterprises can be expressed as the S-curve of declining, rising and declining again. Conclusions - This paper has taken the lead in using Ohlson corporate value model to fill the gap in the relevant researches in China. It can also provide guidance for the international operation of China's enterprises. Meanwhile, the two systems for international operation and performance evaluation index have been put forward. The performance of international operation can be classified as financial performance or corporate value so that the operation effect of those China's enterprises going abroad can be better evaluated.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.