• Title/Summary/Keyword: Non Operation

Search Result 2,604, Processing Time 0.041 seconds

Tight Lower Bound of Optimal Non-Coherent Detection for FSK Modulated AF Cooperative Communications in Rayleigh Fading Channels

  • Tian, Jian;Zhang, Qi;Yu, Fengqi
    • Journal of Communications and Networks
    • /
    • v.13 no.4
    • /
    • pp.313-318
    • /
    • 2011
  • When wireless channels undergo fast fading, non-coherent frequency shift keying (FSK) (de)modulation schemes may be considered for amplify-and-forward (AF) cooperative communications. In this paper, we derive the bit-error-rate performance of partial non-coherent receiver as a lower bound of the optimal non-coherent receiver for FSK modulated AF cooperative communications. From the simulation and analytical results, it is found that the derived lower bound is very closed to simulation results. This result shows that knowing partial channel state information may not improve system performance significantly. On the other hand, conventional optimal non-coherent receiver involves complicated integration operation. To address the above complexity issue, we also propose a near optimal non-coherent receiver which does not involve integration operation. Simulation results have shown that the performance gap between the proposed near optimal receiver and the optimal receiver is small.

An Reliable Non-Volatile Memory using Alloy Nano-Dots Layer with Extremely High Density

  • Lee, Gae-Hun;Kil, Gyu-Hyun;An, Ho-Joong;Song, Yun-Heup
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2010.02a
    • /
    • pp.241-241
    • /
    • 2010
  • New non-volatile memory with high density and high work-function metal nano-dots, MND (Metal Nano-Dot) memory, was proposed and fundamental characteristics of MND capacitor were evaluated. In this work, nano-dot layer of FePt with high density and high work-function (~5.2eV) was fabricated as a charge storage site in non-volatile memory, and its electrical characteristics were evaluated for the possibility of non-volatile memory in view of cell operation by Fowler-Nordheim (FN)-tunneling. Here, nano-dot FePt layer was controlled as a uniform single layer with dot size of under ~ 2nm and dot density of ${\sim}\;1.2{\times}10^{13}/cm^2$. Electrical measurements of MOS structure with FePt nano-dot layer shows threshold voltage window of ~ 6V using FN programming and erasing, which is satisfied with operation of the non-volatile memory. Furthermore, this structure provides better data retention characteristics compared to other metal dot materials with the similar dot density in our experiments. From these results, it is expected that this non-volatile memory using FePt nano-dot layer with high dot density and high work-function can be one of candidate structures for the future non-volatile memory.

  • PDF

DPA-Resistant Design of the Inverter (차분 전력 분석에 안전한 역원기의 설계)

  • Kim, Hee-Seok;Cho, Young-In;Han, Dong-Guk;Hong, Seok-Hie
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2008.08a
    • /
    • pp.340-344
    • /
    • 2008
  • In the block cipher, DPA-resistant masking methods make an appropriation of extremely high cost for the non-linear part. Block ciphers like AES and ARIA use the inversion operation as this non-linear part. This make various countermeasures be proposed for reducing the cost of masking inversion. In this paper, we propose the efficient masking inverter by rearranging the masking inversion operation over the composite field and finding duplicated multiplications.

  • PDF

Characterization and Improvement of Non-Volatile Dual In-Line Memory Module (NVDIMM의 동작 특성 분석 및 개선 방안 연구)

  • Park, Jaehyun;Lee, Hyung Gyu
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.12 no.3
    • /
    • pp.177-184
    • /
    • 2017
  • High performance non-volatile memory system can mitigate the gap between main memory and storage. However, no single memory devices fulfill the requirements. Non-volatile Dual In-line Memory Module (NVDIMM) consisted of DRAMs and NAND Flashes has been proposed to achieve the performance and non-volatility simultaneously. When power outage occurs, data in DRAM is backed up into NAND Flash using a small-size external energy storage such as a supercapacitor. Backup and restore operations of NVDIMM do not cooperate with the operating system in the NVDIMM standard, thus there is room to optimize its operation. This paper analysis the operation of NVDIMM and proposes a method to reduce backup and restore time. Particularly, data compression is introduced to reduce the amount of data that to be backed up and restored. The simulation results show that the proposed method reduces up to 72.6% of backup and restore time.

Operation Strategy for a Multi-functional Storage Facility (하수저류시설 운영 전략 연구)

  • Yun, So-Young;Lim, Yoon-Dae;Oh, Jei-ll
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.6
    • /
    • pp.959-970
    • /
    • 2011
  • The frequent occurrence of sewer flooding and the intermittent discharge of non-point pollutions into the receiving water body are emerging issues recently due to the climate change and urbanization. These problems might be solved by introducing a multifunctional storage facility. Unlike a single-purpose storage facility, a multi-purpose storage facility should be operated at an instant to meet for flood prevention, reduction of non-point pollution and/or rainwater reuse. Considering various operational combinations it is suggested that prevention of sewer flooding coupled with reduction of non-point pollution is the most effective operational strategy for a multi-functional storage facility.

Operation and Improvement Cases of FGD Non-leakage Type Gas-Gas Heater(GGH) for Coal Fired Power Plants (석탄화력 탈황설비 Non-leakage Type Gas-Gas Heater(GGH) 운영 및 개선사례)

  • Seong, Kijong;Lee, Changsik
    • Journal of the Korean Society of Combustion
    • /
    • v.22 no.4
    • /
    • pp.35-42
    • /
    • 2017
  • This case covers the issues related to the operation problem, cause analysis and improvement cases of the FGD that employed the non-leakage type GGH in coal-fired power plant for the first time in Korea. In the Cooler, there was a main problem that the tube is damaged by the ash cutting due to the high velocity of flue gas in the duct and by the weak wear resistance of material. In the Reheater, there was a main problem that the tube was corroded due to chlorine and sulfur in the circumstance of the low temperature. In order to solve those problems, we have improved the Reheater tube and tube fins by coating enamel to reduce corrosion rate.

Instantaneous Power Compensation of Non-linear Load (비선형 부하의 순시 전력 보상)

  • Kim, Jong-Gyeum;Park, Young-Jeen;Eee, Eun-Woong;Jeong, Jong-Ho;Kim, Il-Jung
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.152-153
    • /
    • 2007
  • industrial site has led to a growing concern for harmonic distortion and the resulting impacts on system equipment and operation. Harmonic current is generated by the operation of non-linear load, it means that voltage and current waveforms exhibit a non-linear relationship. Harmonics cause increase losses in the customer and utility power system components. This paper describes application of instantaneous active and reactive theory for the compensation of harmonic currents in three-phase non-linear load.

  • PDF

Evaluation of the Feasibility of Eliminating Non-point Source Pollution Using Waste Sewage Sludge Bio-blocks (하수슬러지를 이용한 Bio-block의 비점오염물질 제거 가능성 평가)

  • Han, Sang Moo;Kim, Do Hyeong;Jeong, Byung Gon
    • Journal of Korean Society on Water Environment
    • /
    • v.37 no.5
    • /
    • pp.363-368
    • /
    • 2021
  • On the assessment results of the non-point source pollutant removability of bio-block using waste sewage sludge, at the reactor's initial operation stage, the removal efficiency of COD was slightly unstable. However, after the reactor was stabilized, the COD removal efficiency was higher in the reactor filled with bio-blocks compared to the reactor filled with broken stones. In terms of nitrogen and phosphorus, their removal efficiency was unstable at the initial stage of the reactor operation. This phenomenon was investigated through the bio-block elution experiments. Results indicated that nitrogen and phosphorus were eluted from the bio-blocks affecting their removal at the initial operation. Furthermore, based on elution tests conducted after the dry ashing of the waste sewage sludge, part of the nitrogen and phosphorus was eluted similar to the bio-block elution test results, although considerable amounts of nitrogen and phosphorus were reduced compared to the sludge cake. Prior to the use of the waste sewage sludge bio-blocks as a filter medium to remove non-point source pollutants, a stabilization period of 10 days was required. After the stabilization process, results showed similar characteristics as general aggregates. Moreover, to use the bio-block as a filter medium for the non-point pollutant removal, the filling ratio of 75% was the most suitable as it resulted in the highest nitrogen removal efficiency after the stabilization. The results of this study suggested that waste sewage sludge can be suitably recycled as a mixed raw material for the bio-blocks, with satisfactory application as a filter medium in artificial wetlands, stormwater runoff problems, stream water pollutants to eliminate non-point source pollutants.

Direct Torque Control Method of Induction Machine with Constant Average Torque (일정한 토크 평균치를 가지는 유도전동기 직접토크제어기법)

  • Kim, Jeong-Ok;Jo, Nae-Su;Choe, Byeong-Tae;Kim, U-Hyeon;Im, Seong-Un;Gwon, U-Hyeon
    • Proceedings of the KIEE Conference
    • /
    • 2003.11b
    • /
    • pp.31-34
    • /
    • 2003
  • There are several types of switching table for selection voltage vector in direct torque control of induction motor. In general, two-quadrant and four-quadrant operation switching table are used mostly. Two-quadrant operation has an advantage that reduced the torque ripples in comparison with four-quadrant operation, but it has the defect that is not constant average torque. Because the torque increasing slope size by non-zero voltage vector is different from the torque decreasing slope size by zero voltage vector as speed region. The main objective of this study is to maintain constant average torque using two-quadrant operation switching table. In proposed method, the torque increasing slope or decreasing slope are calculated before selected voltage vector is applied. Then, it is applied to zero voltage vector or non-zero voltage vector until the torque increasing slope and decreasing slope are equal. In total magnitude. Therefore it becomes to maintain average torque at whole operation speed. The validity of the proposed method is proven by simulated and experimental results.

  • PDF

A Base AOP Bit-Parallel Non-Systolic for $AB^2+C$ Computing Unit for $GF(2^m)$ ($GF(2^m)$상의 AOP 기반 비-시스토릭 병렬 $AB^2+C$연산기)

  • Hwang Woon-Taek
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.10 no.9
    • /
    • pp.1538-1544
    • /
    • 2006
  • This paper proposes a non-systolic parallel $AB^2+C$ Computing unit based on irreducible AOP order m of $GF(2^m)$. Proposed circuit have only AND gates and EX-OR gates, composes of cyclic shift operation, multiplication operation power operation power-sum operation and addition operation using a merry irreducible AOP. Suggested operating a method have an advantage high speed data processing, low power and integration because of only needs AND gates and EX-OR gates. $AB^2+C$ computing unit has delay-time of $T_A+(1+[log^m_2])T_X$.