Kim, Sang-Soo;Choi, Snng-Hoon;Park, Choon-Soo;Kim, Seok-Won;Kim, Ki-Hwan
Proceedings of the KSR Conference
/
2010.06a
/
pp.1814-1820
/
2010
Korean Train Express (KTX) has been commercially operating and achieving elevation on transport capacity since 2004. And the first hish-speed prototype test train, HSR-350x, was developed and succeeded in testing of running over 350km/h. Now KTX-II based on HSR-350x was started in service run. The new high-speed train development project, HEMU-400x project, has started since 2007. The protype train is being designed and manufactured. After the train are developed completely, it will run on the commercial line and will be test to verify the estimated performance. The authors devised the performance evaluation method and process of the HEMU-400x prototype system. And we introduce the definite performance test items and the method to vitrificate them in this paper.
Kim, Sang-Soo;Kim, Ki-Hwan;Park, Choon-Soo;Mok, Jin-Yong;Choi, Sung-Hoon
Proceedings of the KSR Conference
/
2008.06a
/
pp.969-974
/
2008
As the railway becomes higher, the reliable stability and riding comfort of higher railway are required. To improve the riding comfort of high-speed trains, it is very helpful to use active suspension system for railway. In Japan, the high-speed train, Shinkansen has adopted semi-active suspension system and now it is running in the main trunk. In this paper, the authors introduce several technical trends of vibration control methods of Japanese Shinkansen. And the installation of semi-active suspension to HSR 350x and the test result of test run on the Kyoung-Bu high speed ling are also explained. After development of HSR 350x, new R&D national project of high speed train is progressed by Ministry of Land, Transport, and Maritime Affairs. This project is the development of Electric Multiple Unit of high speed train with 400km/h of maximum test speed. These result would be helpful to progress next generation high speed project.
Kim, Sang-Soo;Lee, Tae-Hyung;Choi, Sung-Hoon;Park, Choon-Soo;Han, In-Soo;Mok, Jin-Yong
Proceedings of the KSR Conference
/
2008.11b
/
pp.555-560
/
2008
Korean Train Express (KTX) has been commercially operating and achieving elevation on transport capacity since 2004. And HSR-350x was developed and succeeded in testing of running over 350km/h. The new high-speed train development project, HEMU-400x project, has started since last year. To develop the train system, it is important how we progress the configuration of the system, design, manufacturing and test verification. The authors devised the performance estimate and verification process of the HEMU-400x and the project is performed following the developed processes.
The definition of multi-coupled operation is that coupled two trainsets is able to be operated one trainset identically. That is to say, the one driver, coupled two trainsets can operate the traction and braking system, control vehicle doors, phanto-graph, HVAC and passenger room lighting system etc, such as one trainset controlling. This study will provide high speed train design engineer with introducing multi-coupled operation system electrically and presentation automatic complex coupler mechanism, and then this paper will be applied to design next generation high speed train system such as Jun-la/Ho-nam line
From the view point of railway vehicle dynamics, the interaction between wheel and rail have an huge effect on the behavior of the vehicle. This phenomenon is an unique motion, only for railway vehicles. Furthermore, close investigation of the backgrounds of the interaction is the key to estimate the dynamic behavior of the vehicle, successfully. To evaluate the model including flexible bodies such as car body and catenary system of the next generation express train, it is necessary to develop proper dynamic solver including a wheel rail contact module. In this study, wheel-rail contact module is developed using the general purpose dynamic solver. First of all, the procedure for calculation of the wheel-rail contact force has been established. Generally, yaw angle of the wheelset is ignored. Sets of information are summarized as tables and splined for further uses. With this information, normal force and creep coefficient can be extracted and used for FASTSIM algorithm, which has been shown good reliability over years. Normal force and longitudinal, lateral force at the contact surface are also calculated. Those data are verified by commercial railway simulation program 'VAMPIRE'. This procedure and program can offer a basic process for estimation of the dynamic behavior and wear of the wheel-rail system, even while running on the curved rail. Finally, multi-dimensional inspection tool will be developed including the prediction of the derailment.
By the result of efforts for the technology development of G7 trainset, the technology of domestic high-speed train KTX-II has lately been put to practical use while a forward countries of railway, which have their own developing ability of high-speed train, are competing against each other for the development of faster high-speed train system. Japan has been commissioning of FASTECH 360 which was developed in June 2005. Also France and Germany have been commissioning of next generation high-speed train such as AGV and ICE-3, developed basing on technology of their existing high-speed train system(TGV and ICE), its maximum commercial running speed is 360kph, and adopted multiple unit system. For the development of technology of domestic high-speed train and enhancement of national technology competitive power, HEMU (High-speed Electrical Multiple Unit) development project has been carried out as a national R&D project from last August. For the executing of HEMU's maximum speed test, we have investigated the high speed line characteristics (i.e. radius of curvature, gradient, cant etc.) of Seoul-Pusan line and Honam line which is under construction. We'd like to examine a study of condition for the best HEMU T&C line considering HEMU's characteristics (i.e. acceleration, deceleration etc.) and its interface with infrastructure in this paper.
High-speed railway is important transportation in the world because it is very comfortable, environmental benefits, energy savings, etc. The increase of demand for high-speed railway influence to develop of new hish-speed trains. Many countries introduced new high-speed train in the market. It meets to the market's needs. They adopt new technology and systems like that active suspension, synchronous permanent magnetic motor, distributed drive system, aero acoustics, etc. In Korea, the project for R&D of new high-speed train is launched last year. We need analysis of technical trend of new high-speed trains in the world. This paper presents a overview of technical trend of new high speed trains and what is key issues in development of high-speed train. It is very useful to develop a next generation high-speed train in Korea.
Park, Tae-Ho;Han, Jong-Won;Ryu, Hun-Jae;Ko, Jun-Hee;Chang, Seo-Il
Proceedings of the KSR Conference
/
2011.10a
/
pp.2934-2940
/
2011
The railway system in Korea is developing more and more rapidly. After development the next generation hi-speed train(HEMU-400X), Korea can compete against developed country. But, speed increasing will cause the greater rolling and aero dynamic noise. In this study shows that measurement noise of the KTX train by 300kn/h class, and KTX-Sancheon train by 350km/h class. The measurements are carried out on open area and noise protection barrier installed area. The microphones were placed at a distance of 3m from the center line of the track at a height of 0.5m above the upper surface of the rail and at a distance of 7.5m from the center line of the track at a height of each 0.6m above(Max 3.6m) the upper surface of the rail. One microphone was placed at a distance of 25m for check the environmental noise.
TSI(Technical Specification for Interoperability) is the highest technical specification in the Europe Railway and is composed by assessment items and essential requirements included by safety, reliability, availability, health, environment protection and technical compatibility. It is used on the research and development in the next generation railway technical. Currently, TSI procedures have been asked to bid for high speed rail business in Europe and Brazil. Also, all the railway systems such as infrastructure, signaling, electric and rolling stock system corresponding with standard of TSI procedures are exported and imported. Recently, Safety Critical System which has been studied on future railway R&D business in Korea is the state of the art train control system. And it is needed for system assessment of TSI procedures before system test and operation. In this paper, basic research is performed for analyzing TSI procedures suitable for the state of the art train control system in Korean railway.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.